ML20140C581
| ML20140C581 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 04/09/1997 |
| From: | Conte R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Reid D VERMONT YANKEE NUCLEAR POWER CORP. |
| Shared Package | |
| ML20140C585 | List: |
| References | |
| NUDOCS 9704170132 | |
| Download: ML20140C581 (3) | |
See also: IR 05000271/1997002
Text
{{#Wiki_filter:*
,
a
- -
April 9,1997
Mr. Done'd Reid
Vice President, Operations
Vermont Yankee Neclear Power Corporation l
RD 5, Box 169 l
Ferry Road I
~
Brattleboro, Vermont 05301 j
i
SUBJECT: NRC INTEGRATED INSPECTION REPORT 50-271/97-02 i
NOTICE OF VIOLATION
Dear Mr. Reid: I
!
, On March 8,1997, the NRC completed an inspection at your Vermont Yankee reactor l
facility. The enclosed report presents the results of that inspection. )
l
As discussed in Sectial E1.2 of the enclosed report, a root cause evaluation of the mixing
of electrical power supply neutral and ground wires in the advanced off-gas (AOG) system
had not been completed during the on-site inspection by a representative of the Office of I
Nuclear Reactor Regulations. The neutral mixing problem and other wiring error problems
appear to be limited to the AOG system, and they do not adversely impact AOG system
operable. However, the full extent of this wiring control problem has yet to be determined
and resolved. Without the completed root cause analysis, we are concerned that the
identified non-safety related neutrals and grounds wiring problem may potentially involve
safety related systems. Upon completion of your stz f's evaluation of this issue, please
provide us, in writing, your findings, corrective actiorm, and bar,is for assuring that those
problems do not adversely impact safety related or important to safety systems. Also, we
request that you provide us with a status of resolution of all of the AOG system wiring
errors and, if not resolved, provide a date when these errors will be corrected.
Inspector review of the November 25,1996 event involving the on-line de-energization of
the 480V electrical bus No. 6 for preventive maintenance identified that your staff failed to
implement the administrative control requirements for removing power supplies from
service. This failure to implement the procedural requirements of Aoministration Procedure
, (AP)-0125 and Technical Specification 6.5 is a violation. Of particular concern to us was
that this evolution was previously performed durin] unit outages and that more rigorous
reviews were not conducted prior to conducting th.s planned activity at power. We viewed
the shift supervisor's performance es the last line of dew which failed leading to this
event and the maintenance and planning staff's failurA as more programmatic.
This violation is cited in the enclosed Notice of Violation, and the circumstances
surrounding the violation are described in detailin the enclosed report. Please note that you
are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response. The NRC will use your response, in part, to
determine whether further enforcement action is necessary to ensure compliance with t
regulatory requirements.
9704170132 970409
. _
3 ]
PDR ADOCK 05000271
G PDR gg [gji})g[][{{]{E(\(]3$
,
.- ., .. . - .-= -_ _- - _. . - . . . - - _ _ - - -
T
Mr. Doncid Reid 2
f
.
In ac,:ordance with 10 CFR 2.790 of the NRC's " Rules of Practices," a copy of this letter
and the enclosed Notice will be placed in the NRC Public Document Room.
Sincerely,
[
Richard J. Conto, Chief
'
Reactor Pro [ects Branch 5
Division of Reactor Projects
,
Enclosures:
1. Notice of Violation i
2. NRC Inspection Report 50-271/97-02 ;
, ,
Docket No. 50-271 cc w/enci: R. McCullough, Operating Experience Coordinator - Vermont Yankee R. Wanczyk, Director, Safety and Regulatory Affairs
. G. Maret, Plant Manager
J. Duffy, Licensing Engineer, Vermont Yankee Nuclear Power Corporation
J. Gilroy, Director, Vermont Public interest Research Group, Inc.
D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire
Chief, Safety Unit, Office of the Attorney General, Commonwealth of
Massachusetts
R. Gad, Esquire
G. Bisbee, Esquire
T. Rapone, Massachusetts Executive Office of Public Safety
State of New Hampshire, SLO Designee
, State of Vermont, SLO Designee
Commonwealth of Massachusetts, SLO Designee
.
4
: ,
k
. !
I
~ . . . - .. . . - - ..
*
.
.
Mr. Donald Reid 3
Distribution w/ encl:
Region i Docket Room (with concurrences)
PUBLIC l
Nuclear Safety Information Center (NSIC)
! NRC Resident inspector
D. Screnci, PAO (2)
- R. Conte, DRP
W. Axelson, DRA
L. Harrison, DRS
D. Beard, DRP
L. Peluso, DRS
D. Vito, RI, File No. 96-A0128
'
Distribution w/enci (VIA E-MAIL): 1
W. Dean, OEDO
$ V. Rooney, NRR
- P. Milano, NRR
i R. Correia, NRR l D. Taylor, NRR
- T. Koshy, NRR
f Inspection Program Branch, NRR (IPAS) 4 i !
4
-
i
- l
i
!
,
N l 4 i t k l I l f
f
DOCUMENT NAME: G:\ BRANCH 5\lR9702R.CPC
n r.c*. . copy ot ini. socum.nt. indic.t. in in. N: c - copy witnout,tt.chrn.nt/.ncio.ur. e - copy with ett.cnm nt/encio.ur. u = No copy
j OFFICE DRP/RI a _j D%RI DPS/RI NRR , jl DRP/RI y
; NAME COOK ph7 7 KNUTSpN PELOSQ KOSHY g K CONTE 9 W
DATE 04/09/97 I"~~ 04/ /97g 04/ /9N 04/f/97 ,js 04/c)/97 //
.] ogr3
CIAL RECORD C gg;j
,
'% $
1
-
}}