Notice of Violation from Insp on 970119-0308.Violation Noted:Supervisor Failed to Ensure Review of Loads Impacted by Deenergization of 480V Electrical Bus 6 When Reactor Was Operating at 100% Power
ML20140C587
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 04/09/1997
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20140C585 List:
References
50-271-97-02, 50-271-97-2, NUDOCS 9704170144
Download: ML20140C587 (2)


Text

ENCLOSURE 1 NOTICE OF VIOLATION Vermont Yankee Atomic Powe;r Company Docket No. 50-271 Vermont Yankee License No. DPR-28 During the NRC inspection conducted from January 19 to March 8,1997, a violation of NRC requirements was identified in accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," NUREG-1600, the violation is listed below:

Technical Specification 6.5, " Plant Operating Procedures," states that detailed written procedures involving both nuclear and non-nuclear safety operations shall be prepared, approved, and adhered to. Vermont Yankee Administrative Procedure (AP)-0125, " Plant Equipment Control," Appendix B, " Conditions Required to Remove Non-Technical Specifications Required Equipment from Service," Revision 7, dated October 31,1995, requires that prior to a planned evolution which will remove from service or otherwise make l inoperable any power supply, the shift supervisor will ensure that a detailed review of loads  ;

impacted by the de-energization of the power supply is completed.

1 Contrary to the above, on November 25,1996, while the reactor was operating at 100 percent power, the shift supervisor did not ensure that a detailed review of loads impacted by the de-energization of 480V electrical bus No. 6 for planned preventive maintenance was conducted prior to its d&energization, resulting in the unanticipated automatic isolation of the in-FcTVICO *;ondensate demineralizers and opening of the associated bypass valve.

i This is a Severity Level IV violation (Supplement 1)

Pursuant to the provisions of 10 CFR 2.201, Vermont Yankee Atomic Power Company is hereby required to submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. 20555 with a copy to the Regional Administrator, Region I, and a copy to the NRC Resident inspector at the facility that is the subject of this Notice, within 30 days of the date of the letter transmittina this Notice of Violation (Notice). This reply should be clearly marked as a " Reply to a Noti ce of Violation" and should include: (1) the reason for the violation, or, if contested, the be sis for disputing the violation, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that wi!! be taken to avoid further violations, and (4) the date when full compliance will be achieved. Your response may reference or include previous docketed correspondence, if the correspondence adequately addresses the required response if an adequate reply is not received within the time specified in this Notice, an order or a Demand for Information may be issued as to why the license should not be modified, suspended, or revoked, or why such other action as may be proper should not be taken. Where good cause is shown, consideration will be given to extending the response time.

9704170144 970409 PDR ADOCK 05000271 G PDR

i

, , Because your response will be placed in the NRC Public Document Room (PDR), to the l 4 m: extent possible, it should not include any personal privacy, proprietary, or safeguards [

j. information so that it can be placed in the PDR without reaction. However, if you find it  !

necessary to include such information,.you should clearly indicate the specific information j

[

request for withholding the information from the public.  ;

- i

, i i-  !

y

< 1 1

i Dated at King of Prussia, Pennsylvania l 1- . this o day of AoH1 ,1997 1

i 4

h -

E 2

i 3

i l l

i 4

J k'

e

'I

-i t

1 4

1 1

2 i

i i

j '

i 4-4

)

ii 4

2-i e'

-< . , . . - , , , , -,-,<...-r. , --