Forwards Insp Rept 50-271/97-02 on 970119-0308 & Notice of Violation
ML20140C581
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 04/09/1997
From: Conte R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Reid D
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20140C585 List:
References
NUDOCS 9704170132
Download: ML20140C581 (3)


See also: IR 05000271/1997002

Text

{{#Wiki_filter:* , a - - April 9,1997 Mr. Done'd Reid Vice President, Operations Vermont Yankee Neclear Power Corporation RD 5, Box 169 Brattleboro, Vermont 05301 ~ Ferry Road j i SUBJECT: NRC INTEGRATED INSPECTION REPORT 50-271/97-02 i NOTICE OF VIOLATION Dear Mr. Reid: On March 8,1997, the NRC completed an inspection at your Vermont Yankee reactor , facility. The enclosed report presents the results of that inspection. l As discussed in Sectial E1.2 of the enclosed report, a root cause evaluation of the mixing of electrical power supply neutral and ground wires in the advanced off-gas (AOG) system had not been completed during the on-site inspection by a representative of the Office of Nuclear Reactor Regulations. The neutral mixing problem and other wiring error problems appear to be limited to the AOG system, and they do not adversely impact AOG system operable. However, the full extent of this wiring control problem has yet to be determined and resolved. Without the completed root cause analysis, we are concerned that the identified non-safety related neutrals and grounds wiring problem may potentially involve safety related systems. Upon completion of your stz f's evaluation of this issue, please provide us, in writing, your findings, corrective actiorm, and bar,is for assuring that those problems do not adversely impact safety related or important to safety systems. Also, we request that you provide us with a status of resolution of all of the AOG system wiring errors and, if not resolved, provide a date when these errors will be corrected. Inspector review of the November 25,1996 event involving the on-line de-energization of the 480V electrical bus No. 6 for preventive maintenance identified that your staff failed to implement the administrative control requirements for removing power supplies from service. This failure to implement the procedural requirements of Aoministration Procedure (AP)-0125 and Technical Specification 6.5 is a violation. Of particular concern to us was , that this evolution was previously performed durin] unit outages and that more rigorous reviews were not conducted prior to conducting th.s planned activity at power. We viewed the shift supervisor's performance es the last line of dew which failed leading to this event and the maintenance and planning staff's failurA as more programmatic. This violation is cited in the enclosed Notice of Violation, and the circumstances surrounding the violation are described in detailin the enclosed report. Please note that you are required to respond to this letter and should follow the instructions specified in the enclosed Notice when preparing your response. The NRC will use your response, in part, to determine whether further enforcement action is necessary to ensure compliance with t ] regulatory requirements. . _ 9704170132 970409 3 PDR ADOCK 05000271 gg [gji})g[][{{]{E(\\(]3$ G PDR ,

.- ., .. . - .-= -_ _- - _. . - . . . - - _ _ - - - T Mr. Doncid Reid 2 f . In ac,:ordance with 10 CFR 2.790 of the NRC's " Rules of Practices," a copy of this letter and the enclosed Notice will be placed in the NRC Public Document Room.

Sincerely, [ Richard J. Conto, Chief Reactor Pro [ects Branch 5 ' Division of Reactor Projects , Enclosures: 1. Notice of Violation i 2. NRC Inspection Report 50-271/97-02

, , Docket No. 50-271 cc w/enci: R. McCullough, Operating Experience Coordinator - Vermont Yankee R. Wanczyk, Director, Safety and Regulatory Affairs G. Maret, Plant Manager . J. Duffy, Licensing Engineer, Vermont Yankee Nuclear Power Corporation J. Gilroy, Director, Vermont Public interest Research Group, Inc. D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire Chief, Safety Unit, Office of the Attorney General, Commonwealth of Massachusetts R. Gad, Esquire G. Bisbee, Esquire T. Rapone, Massachusetts Executive Office of Public Safety State of New Hampshire, SLO Designee State of Vermont, SLO Designee , Commonwealth of Massachusetts, SLO Designee . 4

, k . I

~ . . . - .. . . - - ..

. . Mr. Donald Reid 3 Distribution w/ encl: Region i Docket Room (with concurrences) PUBLIC Nuclear Safety Information Center (NSIC) ! NRC Resident inspector D. Screnci, PAO (2) R. Conte, DRP

W. Axelson, DRA L. Harrison, DRS D. Beard, DRP L. Peluso, DRS D. Vito, RI, File No. 96-A0128 ' Distribution w/enci (VIA E-MAIL): 1 W. Dean, OEDO $ V. Rooney, NRR

P. Milano, NRR i R. Correia, NRR l D. Taylor, NRR

T. Koshy, NRR f Inspection Program Branch, NRR (IPAS) 4 i ! 4 i -

i ! ,

N l 4 i t k l I f f DOCUMENT NAME: G:\\ BRANCH 5\\lR9702R.CPC n r.c*. . copy ot ini. socum.nt. indic.t. in in. N: c - copy witnout,tt.chrn.nt/.ncio.ur. e - copy with ett.cnm nt/encio.ur. u = No copy j OFFICE DRP/RI a _j D%RI DPS/RI NRR , jl DRP/RI y

NAME COOK ph7 7 KNUTSpN PELOSQ KOSHY g K CONTE 9 W DATE 04/09/97 I"~~ 04/ /97g 04/ /9N 04/f/97 ,js 04/c)/97 // .] ogr3 CIAL RECORD C gg;j '% $ , 1 _ _ _ _ _ _. _ - }}