ML20128G886

From kanterella
Revision as of 22:30, 23 August 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Addl Info Re Response to Generic Ltr 83-28,Items 2.1,2.2.1,2.2.2 & 4.5.2.Response to Item 4.5.3 Re Intervals for Reactor Trip Sys Testing Will Be Provided Following NRC Evaluation of BWR Owners Group Response
Date released: 05/21/2020 Download: ML20128G886


Rev 0 to Procedure EDP-16, Procedure for Technical Review of Procurement Documents.
ML20128G923
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 06/19/1985
From: Hansen M, Johnston L, Walz V
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
References
Download: ML20128G923 (18)
Rev 3 to Procedure PSO 28, Operating Experience Feedback.
ML20128G909
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 09/13/1984
From:
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
References
Download: ML20128G909 (20)
Rev 1 to Procedure EDP-12, Procedure for Establishing QA Category Classifications.
ML20128G898
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 08/23/1984
From: Patch R, Walz V
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
References
Download: ML20128G898 (21)
Forwards Addl Info Re Response to Generic Ltr 83-28,Items 2.1,2.2.1,2.2.2 & 4.5.2.Response to Item 4.5.3 Re Intervals for Reactor Trip Sys Testing Will Be Provided Following NRC Evaluation of BWR Owners Group Response
ML20128G881
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 07/02/1985
From: Brons J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: VASSALLO D B
Office of Nuclear Reactor Regulation
References
Download: ML20128G881 (9)