ML20129E452

From kanterella
Revision as of 03:53, 23 August 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards SE Which Grants Relief Request 96-02,Parts 1-4 from First 10-yr Interval ASME Code Exam Requirements for Plant,Unit 2
Date released: 05/22/2020 Download: ML20129E452


Safety Evaluation Recommending That Relief Request 96-02 Be Granted,Per 10CFR50.55a(g)(6)(i),per Request
ML20129E485
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 10/01/1996
From:
NRC (Affiliation Not Assigned)
To:
References
Download: ML20129E485 (11)
Forwards SE Which Grants Relief Request 96-02,Parts 1-4 from First 10-yr Interval ASME Code Exam Requirements for Plant,Unit 2
ML20129E448
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 10/01/1996
From: Berkow H
NRC (Affiliation Not Assigned)
To: MCCOLLUM W R
DUKE POWER CO.
References
Download: ML20129E448 (3)