ML20140F866

From kanterella
Revision as of 06:26, 16 August 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Interim Safety Evaluation & Request for Addl Info Re Generic Ltr 83-28,Items 3.1.1,3.1.2,3.2.1,3.2.2 & 4.5.1. Response Acceptable for Items 3.1.1 & 4.5.1.Response Requested According to Commitments in 831107 Ltr
Date released: 06/02/2020 Download: ML20140F866


Interim Safety Evaluation Re Generic Ltr 83-28,Items 3.1.1, 3.1.2,3.2.1,3.2.2 & 4.5.1.Responses to Items 3.1.1 & 4.5.1 Acceptable.Items 3.1.2 & 3.2.2 Incomplete.Acceptability of Items Cannot Be Determined W/O Addl Info
ML20140F963
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 07/01/1985
From:
Office of Nuclear Reactor Regulation
To:
References
Download: ML20140F963 (7)
Forwards Interim Safety Evaluation & Request for Addl Info Re Generic Ltr 83-28,Items 3.1.1,3.1.2,3.2.1,3.2.2 & 4.5.1. Response Acceptable for Items 3.1.1 & 4.5.1.Response Requested According to Commitments in 831107 Ltr
ML20140F861
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 07/01/1985
From: Vassallo D
Office of Nuclear Reactor Regulation
To: UTLEY E E
CAROLINA POWER & LIGHT CO.
References
Download: ML20140F861 (2)