ML20189A424

From kanterella
Revision as of 23:47, 31 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
7/21/2020 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of Donald C. Cook Nuclear Plant Performance for the 2019 Calendar Year
ML20189A424
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 07/07/2020
From: Nestor Feliz-Adorno
Reactor Projects Region 3 Branch 4
To:
Shared Package
ML20014D689 List:
References
Download: ML20189A424 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, ILLINOIS 60532-4352 July 7, 2020 NOTICE OF PUBLIC MEETING Licensee: Indiana Michigan Power Company Facility: Donald C. Cook Nuclear Plant, Units 1 and 2 Docket Nos.: 50-315; 50-316 Date/ Time: Tuesday, July 21, 2020 6:00 - 7:00p.m. EDT Location: Webinar (advance registration required)

Purpose:

The NRC staff will host a webinar to present the NRCs assessment of safety performance at the Donald C. Cook Nuclear Plant for 2019, as described in the 2019 annual assessment letter. Following the presentation, the NRC will respond to questions specific to the safety performance of the plants and the NRCs role in ensuring safe plant operations.

NRC Attendees: N. Féliz Adorno, Chief, Division of Reactor Projects (DRP), Branch 4 P. Zurawski, Senior Resident Inspector, Donald C. Cook Nuclear Plant J. Mancuso, Resident Inspector, Donald C. Cook Nuclear Plant S. Wall, Senior Project Manager, Nuclear Reactor Regulation R. Ng, Project Engineer V. Mitlyng, Senior Public Affairs Officer P. Chandrathil, Public Affairs Officer Public Participation: This is a Category 3 Meeting. The webinar will begin with a presentation by NRC staff on the NRCs assessment of performance for the sites during 2019. Following the presentation, members of the public will have the opportunity to ask questions specific to the safety performance and the NRCs role in ensuring safe plant operations. The NRC staff will provide guidance during the webinar on the methods available to ask a

question. Alternatively, questions may be submitted in advance to Nestor.Feliz-Adorno@nrc.gov.

Interested members of the public must register at the website address below to see the visual portion of the presentation. In addition, interested members of the public must call in at 800-988-9506 (passcode 6873588) in order to listen to the presentation because the video application will have no sound. After registering, a confirmation email will be sent with details for joining the webinar. This is a virtual public meeting where participants will be able to see the presentation on a computer screen and listen to the presenters through their phone. There is also the option to join via phone only by calling in to the number above.

In order to participate, please register for the webinar no later than one business day prior to the July 21, 2020, meeting at:

https://usnrc.webex.com/usnrc/onstage/g.php?MTID=e5554f14c2b6a867 aa4c2b570b1db26e5 System Requirements for Attendees for the webinar:

https://help.webex.com/en-us/1vek5r/Webex-Meetings-SystemRequirements-and-Cross-Platform-Information#Webex-Meetings-SuiteSystem-Requirements If you have any questions or should need assistance concerning registration for the meeting, please call or email the meeting contact.

Meeting

Contact:

Néstor J. Féliz Adorno, Chief Branch 4 Phone: (630) 829-9739 E-mail: Nestor.Feliz-Adorno@nrc.gov The NRCs annual assessment letters regarding each sites performance during 2019 (2019q4) can be found at: https://www.nrc.gov/reactors/operating/oversight/listofasmrpt.html. Additional information related to the NRCs annual assessment process and the safety performance of each site can be found on the NRCs website at:

https://www.nrc.gov/reactors/operating/oversight.html.

The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 8, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in this webinar or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact. Determinations on requests will be made on a case-by-case basis. Persons requiring assistance to attend the webinar shall make their requests known to the NRC meeting contact no later than two business days prior to the July 21, 2020, meeting.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.

Please confirm the meeting schedule on the NRC website (www.NRC.gov) under public meetings.

Approved by: /RA/__________________

Néstor J. Féliz Adorno, Chief Branch 4 Division of Reactor Projects

DISTRIBUTION:

Jessie Quichocho, Region III Coordinator, OEDO Elise Burket, Region III Coordinator, OEDO Russ Felts, Deputy Director, Division of Reactor Oversight, NRR RidsNrrDorlLpl3 RidsNrrPMDCCook Resource Julio Lara, Director, Division of Reactor Projects, RIII Billy Dickson, Acting Deputy Director, Division of Reactor Projects, RIII Mohammed Shuaibi, Director, Division of Reactor Safety, RIII David Curtis, Deputy Director, Division of Reactor Safety, RIII Nestor Feliz-Adorno, DRP Branch Chief Paul Zurawski, SRI, DC Cook DRS Branch Chiefs:

Ann Marie Stone Karla Stoedter Richard Skokowski Patricia Pelke Steven Orth Allan Barker, Regional State Liaison Officer, RIII Viktoria Mitlyng, RIII Public Affairs Prema Chandrathil, RIII Public Affairs ADAMS Accession Number: ML20189A424 Publicly Available Non-Publicly Available Sensitive Non-Sensitive OFFICE RIII RIII NAME RNg:wc via email NFéliz Adorno via email DATE 7/7/2020 7/7/2020 OFFICIAL RECORD COPY