ML20127M002

From kanterella
Revision as of 18:37, 9 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Partial Response to FOIA Request for All Records Re NRC 841218 Meeting W/Hydrogen Control Owners Group in Norwood,Ma & Containment Model Experiments at Sandia.Forwards Documents Listed in App a
ML20127M002
Person / Time
Issue date: 02/05/1985
From: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
To: Hiatt S
OHIO CITIZENS FOR RESPONSIBLE ENERGY
Shared Package
ML18092B591 List:
References
FOIA-84-940 NUDOCS 8507010040
Download: ML20127M002 (26)


Text

' '

s post-oW j:2 rar u ,

W g% .

UNITED STATES

['

'h NUCLEAR REGULATORY COMMISSION g -l '

( , WASHINGTON, D. C. 20555

...../ ,.

f FEB s 198s r

Ms. Susan L.!Aiatt '

OCRE .

8275 Munson Road IN RESPONSE REFER Mentor,._0H 44060 TO F01A-84-940

Dear Ms. Hiatt:

'+

This is in partial response to your letter dated December 18, 1984, in which,l,ou requested, pursuant to the Freedom of Information Act (F0IA),

the following: -

1. All records resulting fro % or, relating to t e meeting held on December 18, 1984, betw?enjthe NRC and the Hydrogen ~ Control Owners Group at Norwood, Massachusetts.

2.

3 All records concerning the experiments conducted at the Sandia National Laboratory on small and large scale steel containment models as part of the research program on containment integrity.

ThedocubentslistedontheenclosedAppendixAareresponsivetothesecond category of your request and are enclosed. You will be billed separately by our Division of Accounting and Finance in the amount of $9.19 for the enclosed documents. ,

i The staff is continuing to search for additional documents related to your request. You will be notified at the completion of this search.

Si rely, _

- [IM.Felton, Director '

~ Iivision of Rules and Records

/[', Iffice of Administration ,

Enclosures:

As stated

't e I

J ,

8507010040 850205 t l

PDR FOIA -I HI ATT84- 940 PDR ,

V _ _ _ _ - _ _0

F01A-84-940 APPENDIX A

1. 08/18/81 Memo to W. Von Riesemann from W. Schmidt re: Existing Containment Buildings for Tests (15 pages)
2. 01/26/82 Letter from W. Sebrell to Dr. J. Costello re: info. on current expenditures on the Safety Margins for Containment project w/ enclosures:
1. Figure 1
2. Table 1
3. Table of Monthly Activity Expenses (4 pages total)
3. 02/16/82 -Letter from 'W. Sebrell to Dr. J. Costello re: Expenditures and commitments on the Safety Margin for Containments

-project w/ enclosures (3 tables) (4 pages)

4. 03/16/82 Letter from W. Sebrell to Dr. J. Costello re: Safety Margin of Containments Program (FIN Number A1249-2) w/ enclosed monthly status report (4 pages)
5. 03/26/82 Memo to W. Von Riesemann from W. Sebrell re: Trip Report - IDCOR Workshop on Containment Structural Capability on February 24 and 25, 1982 with Table 1 (4 pages)
6. 04/08/82 Letter from W. Sebrell to Dr. J. Costello re: Monthly status of March expenditures and open contracts for the SMC program with two tables (4 pages)
7. 05/03/82 Letter from W. Sebrell to Dr. J. Costello re: May 3, 1982, conversation with Dr. W. Anderson, Dr. J. Burns and Dr. J. Costello (2 pages)
8. 05/03/82 Letter from W. Sebrell to Dr. J. Costello re: Containment Safety Margin Program w/ enclosure " Requests for Technical Proposals for the Sidewall - Base Mat Interaction of Concrete Containments, Sandia National Labs., Safety Margins of Containments Program (6 pages)
9. 05/12/82 Letter from W. Sebrell to Dr. J. Costello re: Accelera-tion of Overall Program - Containment Safety Margin with four tables attached:
1. Safety Margins of Containments Program Year
2. Accelerated Program
3. Funding
4. Accelerated Program - Funding (7 pages total)

F01A-84-940 APPENDIX (cont)

10. 06/22/82 Letter from W. Sebrell to Dr. J. Costello re: Monthly status of April and May Expenditures for the Containment Integrity Program with three tables attached:
1. Montly Funding Status Report
2. Table of Monthly Activity Expenses
3. Accumulated Expenses (5 pages total)
11. 07/09/82 Letter from W. Sebrell to Dr. J. Costello re: Monthly status of June expenditures for the Containment Integrity Program with four attachments:
1. Table 1 - Monthly Funding Status Report
2. Total Expenses and Commitments
3. International Workshop on Containment Integrity List of Attendees
4. Letter from Yutaka Kukita to Dr. J. Sebrell (8 pages total)
12. 08/17/82 Memo for Distribution from A. Dennis re: Trip Report (4 pages)
13. 09/13/82 Memo to Containment Integrity Peer Review Group from W. Von Riesemann re: Peer Review Group Meeting, Quality Inn, Arlington, VA, June 9, 1982 w/ enclosures:
1. Minutes from subject meeting
2. Memo to Distribution from A. Dennis re: Steel Reactor Containment Model--Criteria for Design, Fabrication and Erection
3. Steel Reactor Containment Model Criteria for Design, Fabrication, and Erection (18 pages total)
14. 09/20/82 Letter from T. Blejwas to Dr. J. Costello re: Monthly report for July and August w/ enclosures:
1. Monthly Report, Containment Integrity Program August, 1982
2. Table 1, Funding Status Report
3. Figure 1. Project Costs for FY82 (6pagestotal)
15. 10/82 Monthly Report, Containment Integrity Program w/ tables attached:
1. Table 1 - Funding Status Report
2. Figure 1. Project Costs (4 pages total) l l

l

F01A-84-940 APPENDIX (cont.)

3

16. 10/30/82 Letter from T. Blejwas to Dr. J. Costello re: Sept.

Monthly Report w/ enclosures:

1. Monthly Report, Containment Integrity Program, ,

Sept., 1982. [

2. Table 1 - Funding Status Report
3. Figure 1. Project Costs for FY82 (5 pages total)
17. 11/82 Monthly Report, Containment Integrit with Table 1 and Figure 1 (4 pages) y Program, Nov.1982
18. 11/08/82 Letter from T. Blejwas to Dr. J. Costello re: Recommenda-tions for a program on containment penetrations w/ enclosure

" Penetration Study, Sandia National Labs." (6 pages)

19. 11/11/82 Letter from T. Blejwas to Dr. J. Costello re: October monthly report w/ enclosure " Funding Summary as of 11/1/82" (2 pages)
20. 12/08/82 Funding Summary as of 12/01/82(1page)
21. 12/14/82 Letter from T. Blejwas to Dr. J. Costello re: Pressurization of Model SC-0 (2 pages)
22. 12/20/82 Letter from T. Blejwas to Dr. J. Costello re: Monthly report for Nov. w/ enclosures:
1. Monthly Report, Containment Integrity Program 11/82
2. Table 1 - Nov. Funding Status Report
3. Figure 1. Project Costs (5 pages total)
23. 12/20/82 Letter from T. Blejwas to Dr. J. Costello re: Revised summary of recommendations for a program on containment penetrations w/ enclosures:
1. Sandia Involvement
2. Penetration Study, SNL (11 pages total)
24. 01/83 Monthly Report, Containment Integrity Report,1/83 with Table 1, January Funding Status Report attached (2 pages total)
25. 01/19/83 Letter from T. Blejwas to Dr. J. Costello re: Monthly report for December w/ enclosures:
1. ' Monthly Report (12/82)
2. Table 1. November Funding Status Report
3. Figure 1. Project Costs
4. Funding Summary as of 1/1/83 (6 pages total)

F01A-84-940 APPENDIX (cont.)

26. 02/23/83 Letter from T. Blejwas to Dr. J. Costello re: Monthly report for January w/ enclosures:
1. Figure 1. Project Costs t 2. Funding Summary as of 2/1/83 (3 pages)
27. 03/21/83 Letter from T. Blejwas to Dr. J. Costello re: Monthly report for February w/ enclosures:
1. Monthly report for 2/83
2. Table 1 - Feb. Funding Status Rpt.
3. Fig. 1. Proj. Costs
4. Funding Summary as of 3/1/83 (5 pages)
28. 05/02/83 Letter from T. Blejwas to Dr. J. Costello re: March monthly report w/ enclosures:
1. March monthly report
2. Table 1 - Feb. Funding Status Rpt.
3. Fig. 1. Proj. Costs (5 pages total)
29. 05/02/83 Letter from T. Blejwas to Dr. J. Costello re: Quick-look rept. for the test of model SC-1 w/ enclosures:
1. Quick-look rept., Test of model SC-1, Containment Integrity Program (4 pages)
30. 05/07/83 Ltr. fr T. Blejwas to J. Costello re: April monthly rept. w/ enclosures:
1. April monthly rept.
2. Table 1 - April Funding Status Rpt.
3. Quick-look Report, Test of Model SC-1, Containment Integrity Program
4. Fig. 1. Proj. Costs
5. Funding Summary as of 5/1/83 (9 pages total)
31. 05/11/83 Memo for Distribution fr. J. Costello re: Containment Model Test w/ enclosures:
1. Small Model Series
2. Quick Look Report (6 pages total)
32. 06/01/83 Memo to S. Hatch fr. J. Jung re: Analyses of Containments w/ attachments:
1. Ultimate Pressure Capability Estimates for Grand

, Gulf, Surry, and Sequoyah

2. Calculations for the Ultimate Strengths of Calvert Cliffs, Oconee, and Peach Bottom (15 pages total) z

F01A-84-940 APPENDIX (cont.)

33. 06/17/83 Memo to Containment Integrity Peer Rev. Group from R. Reese re: Peer Rev. Group Mtg., Sandia Natl. Labs.,

Albuquerque, New Mexico, Feb 24-25, 1983 w/ enclosures:

1. Mtg. Agenda
2. Copies of Transparencies Used in the Mtg.
3. Y. R. Rashid, Review of the WASH-1400 Surry Contain-ment Assessment, Draft for Comments (10 pages total)
34. Undated June, July and August 1983 Monthly Report (3 pages)
35. 07/07/83 Ltr. fr. T. Blejwas to J. Costello re: Monthly Report for May w/ enclosures:
1. Monthly Report, May 1983
2. Table 1 - May Funding Status Rpt.
3. Fig. 1. Proj. Costs
4. Funding Summary as of 6/1/83
5. Memo fr. Bengt Karlsson to all lease customers dated April 21, 1983
6. Program Bugs (8 pages total)
36. 08/02/83 Ltr. fr. T. Blejwas to J. Costello re: Description of initial testing of model SC-2 (2 pages)
37. 08/30/83 Ltr. fr. Joseph Jung to J. Costello re: Test of the ring stiffened model SC-2 w/ enclosure ltr. fr. T. Blejwas to J. Costello dated 08/02/83 (4 pages)
38. 09/26/83 Ltr. fr. T. Blejwas to J. Costello re: Ltr. report for the months of June, July and August w/ enclosures:
1. Fig. 1. Proj. Costs
2. Table I - June Funding Status Rpt.
3. Table II - July Funding Status Rpt.
4. Table III - August Funding Status Rpt.

(5 pages total)

39. 11/18/83 Ltr. fr. T. Blejwas to J. Costello re: Ltr. report for the months of Sept. and Oct. w/ enclosures:
1. Monthly Report, Containment Safety Margins Prog.,

Sept. and Oct. 1983

2. Table I - Sept. Funding Status Rpt.
3. Table II - Oct. Funding Status Rpt.
4. Fig. 1. Proj. Costs
5. Funding Summary as of 10/01/83
6. Funding Summary as of 11/01/83 (8 pages total)

F01A-84-940 APPENDIX (cont.)

40. 12/06/83 Memo for Distribution fr. J. Costello re: Small Steel Containment Experiment w/ enclosure " Sketch of Models" (3pages)
41. 12/13/83 Ltr. fr. T. Blejwas to J. Costello re: Ltr. Report for the month of Nov. w/ enclosures:
1. Monthly Report, Containment Safety Margins Program, November 1983
2. Table I - Oct. Funding Status Rpt.
3. Fig. 1. Proj. Costs
4. Quick-look Rpt., Test of Model SC-3 (9 pages total)
42. 12/18/83 Memo. for Distribution fr. J. Costello re: Workshop on Containment Integrity w/ enclosure " Workshop Announcement" (4 pages)
43. 12/20/83 Memo for Distribution fr. J. Costello re: Small Steel Containment Model Test w/ enclosure " Quick-Look Report" (5 pages)
44. 01/04/84 Ltr. fr. D. Horschel to J. Costello re: Ltr. and report from Dr. G. Derbalian w/ enclosures:
1. 12/19/83 Ltr. fr. G. Derbalian to Dr. J. Bennett
2. Three-Dimensional Finite Element Analysis of a Scale Model Nuclear Containment Vessel by G.

Derbalian, G. Fowler, and J. Thomas,12/83 (39 pages total)

45. 01/23/84 Ltr. fr. T. Blejwas to J. Costello re: Ltr. report for the month of Dec. w/ enclosures:
1. Monthly Rpt., 12/83
2. Table I - Dec. Funding Status Rpt.
3. Fig.1. Proj. Costs
4. Funding Summary as of (6 pages total)
46. 03/12/84 Ltr. fr. T. Blejwas to J. Costello re: Ltr. report for the months of Jan. and Feb. w/ enclosures:
1. Progress Rpt., Containment Safety Margins Prog.

Jan, and Feb., 1984

2. Table I - Jan. funding status rpt.
3. Table II - Feb. funding status rpt.

(5 pages total)

47. 03/13/84 Memo to Containment Integrity Technical Review Panel fr. W. Von Riesemann re: April 17-18, 1984 Meeting w/ enclosures:
1. Tentative Agenda, Containment Integrity Technical Review Panel, April 17, 1984
2. Tentative Agenda, April 18, 1984
3. Containment Integrity Tech. Review Panel, March, 1984 (7 pages total)

, F01A-84-940  !

APPENDIX (Cont.)

48. 03/19/84 Ltr. fr. J. Jung to P. Niyogi re: Subjective interpreta-tion of the failure pressure values for the Surry, Zion, Sequoyah, Peach Bottom, and Grand Gulf plants (2 pages)
49. 05/18/84 Memo to Peer Review Committee from W. Von Riesemann re: Workshop and Consnittee Meeting (3 pages)
50. 05/22/84 Ltr. fr. T. Blejwas to J. Costello re: Letter report for the months of March and April w/ enclosures:
1. Progress Report, Containment Safety Margins Program, March and April, 1984
2. Table I, March Funding Status Report
3. Table II, April Funding Status Report (5 pages total)
51. 05/24/84 Ltr. fr. T. Blejwas to J. Costello re: Spending figures on the Containment Safety Margins Program with Table I enclosed (3 pages)
52. 06/12/84 Ltr. fr. J. Felton to A. Kantor re: May 10, 1984 FOIA request w/o enclosure (1 page)
53. 06/26/84 Ltr. fr. T. Blejwas to J. Costello re: Letter report for the month of May w/ enclosures:
1. May, 1984 progress report
2. Table I - May Funding Status Report
3. Costs chart
4. Memo to T. Blejwas fr. D. Clauss re: Thru-Pipe Penetration in large Steel LWR Containment Model (20 pages total)
54. 07/18/84 Ltr. fr. T. Blejwas to J. Costello re: Letter report for June w/ enclosures:
1. June Progress Report
2. Table I - June Funding Status Report
3. Costs chart
4. Second workshop on containment integrity list of attendees (8 pages total)
55. 07/25/84 Ltr. fr. T. Blejwas to Prediction Group re: Predicting results of Sandia's tests of steel containment models w/ enclosures:
1. Diagram
2. List of prediction group members (5 pages total)

~

F01A-84-940 APPENDIX (Cont.)

56. 08/06/84 Ltr. fr. T. Blejwas to J. Costello re: Ltr. report for July w/ enclosures:
1. July progress report
2. Table I - July Funding Status Report
3. Figure 1. Project Costs
4. Figure 2. Updated Equip. Hatch Analysis (6 pages total)
57. 08/16/84 Ltr. fr. G. Arlotto to A.' Snyder re: Foreign travel request (1 page)
58. 08/20/84 Ltr. fr. T. Blejwas to D. Ross re: Slides of model w/o attachments (2 pages)
59. 08/23/84 Ltr. fr. W. Von Riesemann to J. Costello re: Abstracts that have been submitted to Sandia and Argonne for 1985 SMiRT Conf. w/ enclosures:
1. U.S. NRC Containment Integrity Programs Summary
2. Internal Pressure Experiments with Steel and Concrete Containment Models Summary
3. Abstract
4. Comparison of Analytical and Experimental Results from Pressurization of a 1.8 Scale Steel Containment Model Abstract
5. Techniques and Results from the Internal Pressuriza-tion of a 1/8 Scale Steel Containment Model Summary
6. Survey of Existing LWR Containment Penetrations Abstract
7. Numerical Simulation of an Equipment Hatch for a Steel Containment Vessel to Loading Beyond the Design Basis Summary
8. References (17 pages total)
60. 08/30/84 Ltr. fr. T. Blejwas to J. Costello re: 7/27/84 Penetra-tions Program Plan Review Meeting (3 pages)
61. 09/05/84 Ltr. fr. W. Von Riesemann to J. Richardson re: Inter-change meetings (2 pages)
62. 09/07/84 Ltr. fr. G. Arlotto to A. Snyder re: 8/27/84 foreign travel request for W. Von Riesemann w/o enclosure (1 page)
63. 10/03/84 Ltr. fr. T. Blejwas to J. Costello re: Quick-Look report w/ enclosure:
1. Quick-Look Report, Low Pressure Testing of the Large Steel Model (3 pages total)

F01A-84-940 APPENDIX (Cont.)

64. 10/18/84 Ltr fr. T. Blejwas to J. Costello re: Ltr. report for the months of August and Sept. w/ enclosures:
1. August and Sept. Progress Report
2. Aug. Funding Status Rpt.
3. Sept. Funding Status Rpt.
4. Project Costs
5. Attachment 1
6. Attachment 2 (88 pages total)
65. 11/09/84 Memo to Blejwas fr. D. Clauss re: Summary of Pretest Predictions for the 1.8-Scale Steel Containment Model w/ enclosures:
1. Figure 1. Prediction for change in diameter at seal surface
2. Figure 2. Prediction for SG S180/181-4 (EHM)
3. Figure 3. Constrained pipe model
4. Figure 4. Maximum free field strain
5. Figure 5. Personnel lock model
6. Figure 6. Strain concentrations in cylinder adjacent ,

to reinforcement (10 pages total)

66. 11/27/84 Ltr. fr. T. Blejwas to J. Costello re: Quick-Look report for the completion of the test of the large steel model w/ enclosure:
1. Quick-Look Report, Large Steel Model Test, 11/7-17,1984 (11pages)
67. 12/04/84 Memo for Distribution from J. Costello re: Quick-Look Report on Large Steel Model Test w/ enclosure entitled Quick-LookReport(14pages)
68. 12/20/84 Ltr. fr. T. Blejwas to J. Costello re: Ltr. report for Oct. and Nov. w/ enclosures:
1. Oct and Nov. Progress Report
2. Table 1. Oct. Funding Status Report
3. Table 2. Nov. Funding Status Report
4. Costs chart (6 pages total) 75% Fees Waived

/s . -

4 i

December 18, 1984 Mr. J.M. Felton, Director l

Division of Rules and Records l Office of Administration i U.S. Nuclear Regulatory Commission FREEDOM OF INFORMAll0N Washington, D.C. 20555 RE FREEDOM OF INFORMATION ACT REQUEST F85R-QUESI .t4 9qo

Dear Mr. Felton:

Gae dis m -t4, Pursuant to the Freedom of Information Act, 5 USC 552, as amended, and the provisions of 10 CFR Part 9, the undersigned hereby requests the following:

1. All reports, minutes, notes, recordings, hadnouts, or other documents resulting from or relating to the meeting held on December 18, 1984 between the NRC and the Hydrogen Control Owners Group, held at Norwood, Mass. (see attached meeting notice)
2. All reports, analyses, evaluations, or other documents con-cerning the experiments conducted at the Sandia National Laboratory on small and large scale steel containment models as part of the research program on containment integrity.

In accordance with your policy as stated in your responses to my previous FOIA requests, I request that 75% of the fees for the "

search and production of these documents be waived, as they relate to Issue #8, on hydrogen control, admitted into the Perry OL proceeding. I agree to accept the remaining 25% of the i fees.

Sincerely, Susan L. Hiatt OCRE 8275 Munson Rd.

Mentor, OH 44060 (216) 255-3158 1

y Q Q. 6 +-:~ mvg" o- (

V V.'i "

_ _ _ _ _ _ _ _ _