Revised Monthly Operating Rept for Mar 1985
ML20129H227
Person / Time
Site: Ginna 
Issue date: 03/31/1985
From: Mcnamara A
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML20129H221 List:
References
NUDOCS 8506070520
Download: ML20129H227 (1)


Text

_

.' .. .. OPERATING DATA REPORT DOCKET NO. 50 244 DATE April 19, 1985 COMPLETED BY F De - - w Andrew E. McNamaba TELEPliONE (3151524-4446 Prt. 301 OPERATING STATUS

1. Unit Name: GINNA STATION. UNIT #1 Notes
2. Reporting Period: March. 1985
3. Licensed Thermal Power (MWr): 1520 service on March 2, 1985
4. Nameplate Rating (Gross MWe): 490 at 0030 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> for Annual
5. Design Electrical Rating (Net MWe): 470 Refueling and Maintenance
6. Maximum Dependable Capacity (Gross MWe): 490
7. Maximum Dependable Capacity (Net MWe): 470
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

4

9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, if Any:

This Month Yr.-to-Da te Cumulative

11. Ilours In Reporting Period 744.00 2,160.00 134,520.00
12. Number of flours Reactor Was Critical 25.03 1.441.03 101,.889.74
13. Reactor Reserve Shutdown llours 0 0 1.687.55*
14. Ilours Generator On Line 24.5 1,14L1Q 99.732.80 0 0 8.5_*
15. Unit Reserve Shutdown llours 27,648 2,119,608 138,405.369
16. Gross Thermal Energy Generated (MWil)
17. Gross Electrical Energy Generated (MWil) 8,695 703,221 45,188.628
18. Net Electrical Energy Generated (MWil) 8.133 668.294 ._1L 881.315
19. Unit Service Factor 3.29% 66.69% 74.14%
20. Unit Availability Factor 3.29% 66.69% 74.15%
21. Unit Capacity Factor (Using MDC Net) 2.3% 65.83% 69.44%**
22. Unit Capacity Factor (Using DER Net) 2.3% 65 E % 69 d41*_*_
23. Unit Forced Outage Rate 0 0 7.64
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
25. If Shut Down At End Of Repor period, Estimated Date of Startup:
26. Units In Test Status (Prior to s ommercial Operation): Forecas t Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
    • Corrects calculating error in previously submitted report. , , , ,,,g, ,, g 8506070520 850419 PDR I ADOCK 05000244 R PDR 1(y