MONTHYEARML20133N3101996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Univ of Mo Research Reactor 1996-10-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20210P0971999-08-0606 August 1999 Safety Evaluation Supporting Amend 16 to License R-79 ML20206E7731999-03-31031 March 1999 Progress Rept 1998-99 for Univ of Missouri-Rolla Reactor Facility for Period 980401-990331. with ML20207L4511999-03-0202 March 1999 Safety Evaluation Supporting Amend 15 to License R-79 ML20217P3781998-03-31031 March 1998 Progress Rept,1997-98 for Univ of Missouri-Rolla,Nuclear Reactor Facility. Rept Covers Periods 970401-980331 ML20138G8921997-03-31031 March 1997 Progress Rept for Univ of Missouri-Rolla Nuclear Reactor Facility Apr 1996-Mar 1997 ML20133N3101996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Univ of Mo Research Reactor ML20108A9841996-03-31031 March 1996 Progress Rept 1995-96 Univ of MO-Rolla Nuclear Reactor Facility ML20082R7861995-03-31031 March 1995 Progress Rept for Univ of Missouri-Rolla Nuclear Reactor Facility Apr 1994-Mar 1995 ML20070N7611994-04-29029 April 1994 Progress Rept for Univ of Missouri-Rolla Nuclear Reactor Facility ML20059L7981993-11-0909 November 1993 Ro:On 931026,reactor Started & Inadvertently Operated from 1350 to 1448 H W/O Period Channel Functioning Properly Due to Sticking of Trip Test Knob.Lecture Review of Startup, Power Change & Shutdown SOPs Will Be Performed ML20056D9331993-07-30030 July 1993 Safety Evaluation Supporting Amend 12 to License R-79 ML20128C7821993-01-31031 January 1993 Initial Loading & Testing of Low Enriched U Fuel at Univ of Missouri-Rolla Reactor Facility ML20095J5491992-03-31031 March 1992 Progress Rept 1991-92 Univ of Missouri-Rolla Nuclear Reactor Facility ML20073G1941990-12-31031 December 1990 Progress Rept 1990-91 Univ of Missouri-Rolla Nuclear Reactor Facility ML20065G7041989-12-31031 December 1989 Thesis Entitled, Neutronics Study of Conversion of Univ of Missouri-Rolla Reactor to Low Enriched U Fuel ML20245L7491989-03-31031 March 1989 Progress Rept 1988-89 Univ of Missouri-Rolla,Nuclear Reactor Facility ML20065G7061989-01-31031 January 1989 Paper Entitled, Reactivity Accident Analysis of Univ of Missouri-Rolla Reactor Low Enriched U Core, Submitted for Natl Heat Transfer Conference in Philadelphia,Pa in Aug 1989 ML20065G7051988-12-31031 December 1988 Reactivity Worth of Flooded Isotope Production Element in Core of Univ of Missouri-Rolla Reactor ML20154L5281988-05-31031 May 1988 Rev 2 to Operator Requalification Program ML20154H0661988-03-31031 March 1988 Progress Rept 1987-1988,Univ of Missouri-Rolla Nuclear Reactor Facility ML20150B4491987-12-31031 December 1987 Rev 2 to Operator Requalification Program ML20209J1761987-03-31031 March 1987 Progress Rept,1986-1987,University of Missouri-Rolla Nuclear Reactor Facility ML20203G8281986-03-31031 March 1986 Progress Rept for Univ of Missouri-Rolla,Nuclear Reactor Facility,Apr 1985 - Mar 1986 ML20135G3401985-06-30030 June 1985 Univ of Missouri Research Reactor Annual Rept,Jul 1984 - June 1985 ML20116L1941985-03-31031 March 1985 Progress Rept for Univ of Missouri,Rolla,Mo Nuclear Reactor Facility,Apr 1984 - Mar 1985 ML20098G3211984-09-27027 September 1984 Rev 1 to SAR for Univ of Missouri-Rolla Reactor ML20084D3831984-03-31031 March 1984 Progress Rept 1983-84,Univ of Missouri - Rolla Nuclear Reactor Facility, Covering Apr 1983 - Mar 1984 ML20086G5391984-01-0303 January 1984 Ro:On 831229,during Connection of Cable from Log N Period Compensated Ion Chamber,Spurious Signal Occurred,Causing Reactor Scram.Caused by Failure to Reconnect Cable After Semiannual Check ML20078F6701983-03-31031 March 1983 Progress Rept 1982-1983,Univ of Missouri - Rolla Nuclear Reactor Facility ML20069M3291983-03-31031 March 1983 Progress Rept,Univ of MO-Rolla Apr 1982 - Mar 1983 ML20052B6511982-04-0101 April 1982 Progress Rept for Apr 1981-Mar 1982 ML20004C6531981-04-23023 April 1981 Progress Rept Apr 1980-Mar 1981. ML20078F6641981-03-31031 March 1981 Rev 1 to Operator Requalification Program for Univ of Missouri - Rolla Nuclear Reactor Facility ML19345G2321981-03-11011 March 1981 Operator Requalification Program ML19345F7321981-02-19019 February 1981 Operator Requalification Program ML19309H8851980-03-31031 March 1980 Annual Progress Rept of Univ of Mo,Rolla Nuclear Reactor Facility,Apr 1979-Mar 1980. ML19256F7301979-12-11011 December 1979 Hazard Analysis Summary Rept 1999-08-06
[Table view] |
Text
-
- . ' : O -
M< !ggi;
/ /M FwsQ .QjQ E --t S
}ii
~
BA i s '{, ,
gy j f
- p g [;.~d -- -
r A :2.T .:a r 1-h' g,gg , -
~l-_ _
- - - - = _
l -
UNIVERSITY OF MISSOURI RESEARCH REACTOR --
l 1 gLe. /1 , w OPERATIONS MONTHLY
SUMMARY
To- \ Th '
bs lY 9
i
} ,
}
I I Ockber 1996 4
Prepared by:
i Operat:ons Staff i
i i
J e
9701230239 961031 PDR ADOCK 05000123 R PM 230017
. .g. # ,
[p* _-
- October 1996 The reactor operated continuously in October with the following exceptions: four shutdowns for scheduled maintenance and refueling.
. Djor maintenance items for the month included: replacing the bottom sealing gasket on the south back-up isolation door (505); performing the biennial change-out of control blade offset "D";.
repairing a small leak on the primary pump 501B discharge pressure gauge and seal water line; replacing the slow speed drive motor on the intermediate range monitor chart; replacing the , ,
calibration feedback module for intermediate range monitor (NI) channel #3.
OPERATION
SUMMARY
HOURS OPERATED THIS PERIOD 690 3
-TOTAL HOURS OPERATED ,199,520 HOURS AT FULL POWER THIS PERIOD 684 TOTAL HOURS AT FULL POWER 196,480 INTEGRATED POWER THIS PERIOD 285 MWD TOTAL INTEGRATED POWER - 7C,016 MWD i
MAINTENANCE ACTIVITIES i
10/7/96 Refueled - removed core 96-43, loaded core 96-44. Replaced bottom sealing gasket on south back-up isolation door (505).
10/14/96 Refueled - removed core 96-44, loaded core 96-45. Performed biennial change-out of control blade offset "D".
10/21/96 Refueled - removed core 96-45, loaded core 96 46. Repaired primary pump 501B discharge pressure gauge and seal water line. Replaced slow speed drive motor on intermediate range monitor chart.
10/28/96 Refueled removed core 96-46, loaded core 96-47. Replaced calibration feedback module for intermediate range monitor channel #3.
, --, --