ML20133N310

From kanterella
Revision as of 16:06, 3 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1996 for Univ of Mo Research Reactor
ML20133N310
Person / Time
Site: University of Missouri-Rolla
Issue date: 10/31/1996
From:
MISSOURI, UNIV. OF, COLUMBIA, MO
To:
References
NUDOCS 9701230239
Download: ML20133N310 (2)


Text

-

. '  : O -

M< !ggi;

/ /M FwsQ .QjQ E --t S

}ii

~

BA i s '{, ,

gy j f

p g [;.~d -- -

r A :2.T .:a r 1-h' g,gg , -

~l-_ _

- - - - = _

l -

UNIVERSITY OF MISSOURI RESEARCH REACTOR --

l 1 gLe. /1 , w OPERATIONS MONTHLY

SUMMARY

To- \ Th '

bs lY 9

i

} ,

}

I I Ockber 1996 4

Prepared by:

i Operat:ons Staff i

i i

J e

9701230239 961031 PDR ADOCK 05000123 R PM 230017

    • 2 s ass

. .g. # ,

[p* _-

- October 1996 The reactor operated continuously in October with the following exceptions: four shutdowns for scheduled maintenance and refueling.

. Djor maintenance items for the month included: replacing the bottom sealing gasket on the south back-up isolation door (505); performing the biennial change-out of control blade offset "D";.

repairing a small leak on the primary pump 501B discharge pressure gauge and seal water line; replacing the slow speed drive motor on the intermediate range monitor chart; replacing the , ,

calibration feedback module for intermediate range monitor (NI) channel #3.

OPERATION

SUMMARY

HOURS OPERATED THIS PERIOD 690 3

-TOTAL HOURS OPERATED ,199,520 HOURS AT FULL POWER THIS PERIOD 684 TOTAL HOURS AT FULL POWER 196,480 INTEGRATED POWER THIS PERIOD 285 MWD TOTAL INTEGRATED POWER - 7C,016 MWD i

MAINTENANCE ACTIVITIES i

10/7/96 Refueled - removed core 96-43, loaded core 96-44. Replaced bottom sealing gasket on south back-up isolation door (505).

10/14/96 Refueled - removed core 96-44, loaded core 96-45. Performed biennial change-out of control blade offset "D".

10/21/96 Refueled - removed core 96-45, loaded core 96 46. Repaired primary pump 501B discharge pressure gauge and seal water line. Replaced slow speed drive motor on intermediate range monitor chart.

10/28/96 Refueled removed core 96-46, loaded core 96-47. Replaced calibration feedback module for intermediate range monitor channel #3.

, --, --