ML20134G982

From kanterella
Revision as of 08:05, 2 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-423/85-32 on 850708-12.No Violations Observed
ML20134G982
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/23/1985
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20134G984 List:
References
RTR-REGGD-01.094, RTR-REGGD-1.094 NUDOCS 8508280185
Download: ML20134G982 (2)


See also: IR 05000423/1985032

Text

,

AUG 2 31985

Docket No. 50-423 License No. CPPR-113

Northeast Nuclear Energy Company.

ATTN: Mr. J. F. Opeka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06101

. Gentlemen:

Subject: Inspection Report No. 50-423/85-32

This refers to the routine inspection conducted by K. Manoly of this office

on July 8 - 12, 1985, at Millstone Nuclear Power Station, Unit #3, Waterford,

Connecticut, of activities authorized by NRC License No. CPPR-113 and to the

discussions of our findings held by K. Manoly with K. Gray of your staff at

the conclusion of the inspection.

-Our inspector also verified the steps you have taken to correct the violations

brought to your attention in the enclosure to our letter dated June 11, 1984.

We have no further questions regarding your action at this time.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enr.losed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records,-interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations were observed.

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

.

Original Slgud Byr

h. f. h

-N tewart D. bneter, Director

]DivisionofReactorSafety

Enclosure: NRC Region I Inspection Report No. 50-423/85-32

'fA /

s

8508280185 e50823 m ICIAL RECORD COPY IR MILL 3 85-32 - 0001.0.0 t

PDR ADOCK 05000423 08/05/85

O PDR

. __

- - , - _ - - ,

l

,

-

1

,

'

%)

Northeast Nuclear Energy Co. 2

I

cc w/ encl:

'V.

-

Papadopoli, Construction Quality Assurance Supervisor

  • E. R. Foster, Director of Generation Construction

-E. J. Mroczka, Vice President, Nuclear Operations

D. 0. Nordquist, Manager of Quality Assurance

. R. T. Laudenat, Manager, Generation Facilities Licensing

+

W. D.' Romberg, Station Superintendent

.

Public Document Room (PDR)

, Local Public Document Room (LPOR)

-

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector

. State of Connecticut

bec w/ enc 1:

. Region I Docket Room (with concurrences)

. Senior Operations Officer (w/o enc 1) ,

, . E. C. McCabe, Chief, Section #3, DRP l

,

T. A. Rebelowski, SRI, Millstone Unit 3 l

.

9

.

c..

..

.

RI:DRS RI:DRS RI:DRS  : Ri S

Q4V Manoly/mmb Varela J hnson enhausen tkieher 1

GW b YLE

8/8/85 8/8/85 8//y/85 8/AA/85 8/31/85

l

f

0FFICIAL RECORD COPY IR MILL 3 85-32 - 0001.1.0

'

08/05/85

l

!

!

t