AUG 2 31985
Docket No. 50-423
License No.
CPPR-113
Northeast Nuclear Energy Company.
ATTN: Mr. J. F. Opeka
Senior Vice President - Nuclear
Engineering and Operations Group
P. O. Box 270
Hartford, Connecticut 06101
. Gentlemen:
Subject:
Inspection Report No. 50-423/85-32
This refers to the routine inspection conducted by K. Manoly of this office
on July 8 - 12, 1985, at Millstone Nuclear Power Station, Unit #3, Waterford,
Connecticut, of activities authorized by NRC License No. CPPR-113 and to the
discussions of our findings held by K. Manoly with K. Gray of your staff at
the conclusion of the inspection.
-Our inspector also verified the steps you have taken to correct the violations
brought to your attention in the enclosure to our letter dated June 11, 1984.
We have no further questions regarding your action at this time.
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enr.losed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records,-interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no violations were observed.
No reply to this letter is required. Your cooperation with us in this matter
is appreciated.
Sincerely,
.
Original Slgud Byr
h. f. h
-N tewart D.
bneter, Director
]DivisionofReactorSafety
Enclosure: NRC Region I Inspection Report No. 50-423/85-32
'fA /
s
m ICIAL RECORD COPY
IR MILL 3 85-32 - 0001.0.0
t
8508280185 e50823
ADOCK 05000423
08/05/85
O
.
__
- - , - _ - - ,
l
,
1
-
%)
'
,
Northeast Nuclear Energy Co.
2
I
cc w/ encl:
'V. Papadopoli, Construction Quality Assurance Supervisor
-
E. R. Foster, Director of Generation Construction
-E. J. Mroczka, Vice President, Nuclear Operations
D. 0. Nordquist, Manager of Quality Assurance
R. T. Laudenat, Manager, Generation Facilities Licensing
.
W.
D.' Romberg, Station Superintendent
+
Public Document Room (PDR)
.
Local Public Document Room (LPOR)
,
Nuclear Safety Information Center (NSIC)
-
NRC Senior Resident Inspector
. State of Connecticut
bec w/ enc 1:
Region I Docket Room (with concurrences)
.
Senior Operations Officer (w/o enc 1)
.
,
E. C. McCabe, Chief, Section #3, DRP
l
.
,
T. A. Rebelowski, SRI, Millstone Unit 3
l
,
.
9
.
c..
..
.
RI:DRS
RI:DRS
RI:DRS
Ri
S
Q4V Manoly/mmb
Varela
J hnson
enhausen
tkieher
1
G W
b YLE
8/8/85
8/8/85
8//y/85
8/AA/85
8/31/85
l
f
0FFICIAL RECORD COPY
IR MILL 3 85-32 - 0001.1.0
08/05/85
'
l
!
!
t