Mid-Cycle Performance Review and Inspection Plan 2012 - Peach Bottom Atomic Power Station (Report 05000277/2012006 and 05000278/2012006)
ML12241A178
Person / Time
Site: Peach Bottom  
Issue date: 09/04/2012
From: Krohn P G
Reactor Projects Region 1 Branch 4
To: Pacilio M J
Exelon Nuclear Generation Corp
KROHN, PG
References
IR-12-006
Download: ML12241A178 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 September 4, 2012 Mr. Michael Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd. Warrenville, lL 60555

SUBJECT: MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

PEACH BOTTOM ATOMIC POWER STATION (REPORT 05000277/2012006 and 05000278/2012006)

Dear Mr. Pacilio:

On August 15, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Peach Bottom Atomic Power Station (PBAPS) Units 2 and 3. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2011 through June 30, 2012. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. This assessment reflects the integration of the Security Cornerstone into the ROP performance assessment program governed by IMC 0305, "Operating Reactor Assessment Program." The NRC determined the performance at Peach Bottom Units 2 and 3 during the most recent quarter was within the Licensee Response Column of the NRC=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2013. Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to the baseline inspections, consistent with the Agency's actions related to Fukushima, the NRC will perform TI-187, "Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns" and TI-188, "Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns." We also plan to conduct Inspection Procedure (IP) 71003, "Post-Approval Site Inspection for License Renewal," and independent spent fuel storage installation inspections (lSFSl) using Inspection Procedure 60855.1, "Operation of an ISFSI at Operating Plants." The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence. In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-5120 with any questions you have regarding this letter.

Sincerely,/RA/ Paul G. Krohn, Chief Division of Reactor Projects Projects Branch 4

Docket Nos. 50-277, 50-278 License Nos. DPR-44, DPR-56

Enclosure:

Peach Bottom Atomic Power Station Inspection/Activity Plan

cc w/encl: Distribution via ListServ