ML20148B377
| ML20148B377 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 04/30/1997 |
| From: | Matthews W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 97-288, NUDOCS 9705130068 | |
| Download: ML20148B377 (13) | |
Text
. . . --. - . . . . - _ _ - _ . . . - - - -
VIHOINIA ELECTRIC AND Powna COMi%NY Ricnwono, VIRGINIA 20261 May 7,1997 United States Nuclear Regulatory Commission Serial No.97-288 Attention: Document Control Desk NAPS /JHL Washington, D. C. 20555 Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NQfLIliANfMLEQWER STATION UNIT NOS.1 AND 2 MONTHLY OPERATING REPORT Enclosed is the April 1997 Monthly Operating Report for North Anna Power Station Unit 1 and 2. ,
Very truly yours, DSW W. R. Matthews Station Manager I i
L Enclosure
/
cc: U. S. Nuclear Regulatory Commission Region II s- Y ;
Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303 NRC Senior Resident inspector North Anna Power Station 9705130068 970430 8 DR ADOCK 0500 III!llll{llllll(l[]!
VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH: bpril YEAR: 1997 Approved:
b w
$12N Station Manager
. j
DOCKET No.: 50-338 DATE: May 5, 1991 CONTACT: W. R. Matthews PHONE: (540) 894-2101 OPERATING STATUS
- 1. Unit Names. . . . . . . North Anna 1
- 2. Reporting Periods... . . .. April 1997 1
- 3. Licensed Thernal Power (MWtit. . .. 2,893 I
- 4. Nameplate Rating (Gross MWe) . . . 994
- 5. Design Electrical Rating l Net Fbb) . . 907 l
- 6. Maximum Dependable capacity (Gross HWel s . 940
- 7. Maximum Dependable Capacity (Net MWe) s . . . 893 1
- 8. If changes occur to Capacity Ratings (Iteps 3 thru 7) since last report, give reasonst N/A I
- 9. Power level to which restricted, if any (Net Fbk): N/A
- 10. Reasons f or restrictions, if anyt N/A l
1 l
1 This Month Y-t-D Cumulative l
- 11. Hours in Reporting Period. . . . . . .. . . . 720.0 2,800.0 165,300.0 l
- 12. Nunber of Hours Reactor was Critical . . 720.0 2,880.0 120,097.2
- 13. Reactor Reserve Shutdown Hours. . . .. 0.0 0.0 7,046.0 I
- 14. Hours Generator On-Line. . .. . . 720.0 2,680.0 125,053.8 l
- 15. Unit Reserve Shutdown Hours. . 0.0 0.0 0.0 l
- 16. Gross Thermal Energy Generated it%*0 . . . . 2,019,207.4 8,325,771.9 335,906,308.5 !
17 Gross Electrical Energy Generated ( >**0 . .. 681,782.0 2,728,067.0 147,310,753.0
- 18. Het Electrical Energy Generated (MWH) . . , . . . 649,799.0 2,597,708.0 104,584,362.0
- 19. Unit Service Factor. . . . . . 100.06 100.04 75.7%
- 20. Unit Availability Factor. . . . . . . 100.06 100.0% 75.1%
- 21. Unit capacity Factor (using MDC Net) . . . 101.15 101.04 70.8%
l 22. Unit Capacity Factor tusing DER Net). , 99.54 99.4% 69.8% '
f 23. Forced Outage Rate. . . . ... . 0.0% 0.06 8.6% l l
- 24. Shutdohms Scheduled Over Next 6 Months (Type, Date, Duration of Each): Scheduled Refueling Outage l beginning May 11, 1997, duration =35 days.
- 25. If Shutdown at end of Report Period, estineted time of Startup N/A
- 26. Units in Test Status (Prior to Concercial Operation):
Forecast Achieved INITI AL CRITICALITY INITI AL ELECTPICITY Ca>94ERCIAL OPEPATION i
l l
l l
1
. . . _ ._ . . _ . - . _ . _. . _ . . . _ . . _ . . . _ . . . _ _ . _ . . _ . . . - . _ . . .. ~ _ _ _-. .
4 AVERAGE DAILY UNIT POWER LEVEL Docket No. : 50-338 Unit: NA-1 Date: May 5, 1997
Contact:
W. R. Matthews Phone: (540) 894-2101 MONTH: April 1997 '
DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net) LEVEL (MWe-Net) 1 903 17 907 2 903 18 907 3 903 19 908 4 903 20 907 5 903 21 903 6 902 22 903 7 902 23 903 8 903 24 903 9 903 25 899 10 903 26 903 11 903 27 904 l 12 903 28 902 l
13 903 29 903 14 907 30 903 l 15 907 t
16 907 l
Instructions:
On this format, list the average daily unit power level in MWe-l Net for each day in the reporting month. Compute to the nearest
! whole megawatt.
. . . _ . _ _ . ._ . . _ _ _ . . _ . . . _ _ _ - . . . . . _ . _ . . . _ - _ _ . ~ . _ . _ . . _ _ _ _ . . - __ . _ _ . - _ _ _ _ _ . .
NORTH ANNA POWER STATION UNIT NO.: 1 MONTH: April SUte4ARY OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is _ a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
1 Date Time Data I April 01, 1997 0000 Began month with unit at 100% power, 949 MWe.
April 25, 1997 0933 Commence unit ramp down for performance of Turbine Valve Freedom Test (TVFT) from 100%
power, 950 MWe. j 1015 Unit stable at 91.9% power, 879 MWe.
1039 TVFT complete satisfactorily. Commence unit ramp to 100% power.
1153 Unit stable at 100% power, 946 MWe.
April 30, 1997 2400 Ended month with unit stable at 100% power, 949 MWe.
L l
l
{
l l
l, f ,
I i
i l
4 e
i
._ _. _ . _ . - . _ _ . - _ _ ..~ . . . _ . _ . _ . - _ - - - - . - . _ - - - - - - . - . _ . . - . - . . . . . .
t
- o 6
i Page 1 of 1 !
i UNIT SHUTDOWN AND POWER REDUCTIONS i i
Explanation Sheet 4
i i 50-338 4
Docket No.: i i
l Report Month April Unit Name: NA-1 !
Year: -1997 Date: May 5, 1997 ,
i i
e b
Contact:
W. R. Matthews t
- No entries this month.
i ;
4 I
6 a !
I i i 1
l D
i
) k 1
I 6 t
4 k
4 r
i 4
1-2 i
1:
4 i
, _ _ . . _ _ .. .- ...,m._- -m..- .m.. _.....-.-..-,_m. . . . - __ _ _ .m. .._>__.._..m.m . . . . _ - . . .
j - ,
-UNIT SHUTDOWS AND POWER REDUCTIONS DOCKET NO.: 50-338 -
UNIT NAME: NA-1 DATE: May 5, 1997 REPORT MONTH: April 1997 CONTACT: W. R. Matthews -
PHONE: (540) 894-2101 1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs) Shutting Event Code Code Action to Down Reactor Report i Prevent Recurrence
- No entries this month.
f
't 1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) l= Manual Exhibit F - Instructions l S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3=Automa. tic Scram Entry Sheets for Licensee r
D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License. Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error 5: i H=Other (explain) Exhibit H - Same Source 4
i
i
- s CPERATING DATA REPORT t
DOCKET NO. 50-339 DATEt May 5, 1997 CONTACTt W. R. Matthews PHONE (540) 894-2101 CtERATING STAINS
- 1. Unit Namet. ... .. . . . North Anna 2
- 2. Reporting Periodt... . . . . ... .. April 1991
- 3. Licensed Thermal Power (MWt) . . 2,893
- 4. Nameplate Rating (Gross % )4.. . . .. 979
- 5. Design Electrical Rating (Net MWel .. . . 907
- 6. Maximum Dependable Capacity (Gross M4e): . 944
- 7. Maximum Dependable Capacity (Net MWe)1. .. . 897 l
i
- 8. !! changes occur to Capacity Ratings (Items 3 thru 7) since last report, give reasons: N/A ;
- 9. Power level to which restricted, if any (Net MWolt N/A
- 10. Reasons for restrictions, if anyt N/A This Month Y- t- D Cumulative 'i
- 11. Hours in Reporting Period.. . . . . .. 120.0 2,880.0 143,568.0 l
- 12. Number of Hours Reactor was Critical. . .. .. . 720.0 2,880.0 119,835.2 l
- 13. Reactor Maerve Shutdown Hours. . . .. 0.0 0.0 7,162.2
- 14. Hours Genesstor On-Line. . . . . . . 720.0 2,880.0 118,664.2
- 15. Unit Reserve 2hutdown Hours. . . . . . . 0.0 0.0 0.0
- 16. Gross Thermal Entroy Generated (MWis) . ... .. . . . . 2,079,415.6 8,324,016.2 323,905,934.2
- 17. Gross Electrical Enery, Generated (MWH). . .. . . 681,62].0 2,730,115.0 105,999,350.0 18 Net Electrical Energy Generated (MWH) . . . 649,866.0 2,601,177.0 101,294,359.0 l
- 19. Unit Service Factor. . . . . ... . 100.06 100.06 82.7%
- 20. Unit Availability Factor . . .. . . . . . 100.0% 100.04 82.74
- 21. Unit Capacity Factor (using MDC Net) . . . 100.64 100.7% 78.5% i
- 22. Unit Capacity Facter (using DER Net) . . .. . ... 99.5% 99.6% 77.8%
- 23. l Forced Outage Rate.. . . .. . . . . 0.06 0.0% 5.3% 1
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, Duration of facn): N/A
- 25. If Shutdown at end of Report Period, estirs.ated time of Startup: N/A
- 26. Units in Test Status (Prior to Coasnercial Operation):
Forecast Achieved INITIAL CRIT]CALITY INITIAL ELECTRICITY CC$fERCI AL OPERATION
AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-339
- Unit: NA-2 Date: May 5, 1997
Contact:
W. R. Matthews Phone: (540) 894-2101 I
MONTH: April 1997.
DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER j LEVEL - (MWe-Net) LEVEL (MWe-Net)
I 1 903 17 907 2 902 18 907 3 902 19 908 4 901 20 908 5 902 21 904 6 902 22 904 4 7 902 23 903 i 8 903 24 903 l 9 904 25 903 !
10 904 26 903 11 899 27 903 l 12 903 28 902 '
13 904 29 903 14 909 30 903 i 15 908 16 907 Instructions:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
i
- s
' NORTH ANNA POWER STATION UNIT NO.: 2 MONTH: April .
SUt44ARY OF OPERATING EXPERIENCE ,
Page 1 of 2 Listed below in chronological sequence is a summary of operating ,
es:periences for this month which required load reductions or resulted in i significant non-load related incidents. ;
Date Time Data- {
i April 01, 1997 0000 Began month in Mode 1 at 100% power, 948 MWe, ;
I
~ April 09, 1997 0710 Received Defcaming Tank Level - High t annunciator 2T-C3. !
1010 Received water detection annunciator for ,
l 2-GM-LS-211-3. Investigation revealed oil in detector versus water. !
1118 Commenced unit ramp per step 2.3 of 3 annunciator response 2-AR-T-B2 (Water Detector High) from 100% power, 949 MWe. Ramping at-0.3% per hour.
1144 Performing change to annunciator response for
- water detector high 2-AR-T-B2 in accordance with Westinghouse memorandum stating that operation is allowed with limited amount of i continuous oil ingress. Ramp terminated at 97.2% power, 924 MWe.
1156 Commenced ramp to 100% power from 97%, 920 MWe, ,
1236 Unit stable at 100% power, 948 MWe.
' April 11, 1997 1005 Commenced unit ramp down for Turbine Valve l Freedom Test (TVFT) from 100% power, 948 MWe. ;
1039 Unit stable at 91% power, 875 MWe.
i 1121 TVFT complete satisfactorily.
1127 Commenced ramp to full power after TVFT from !
91% power, 875 MWe. ,
1147 Stopped ramp at 97.5% power, 933 MWe for resolution on #4 Governor valve stroke.
1
. . - ._ . -. .- . . - - . ~ . _ _ ~ - . - . . - - . .. . . _ _ , . . _ _ . . - - . - . ..
NORTH ANNA POWER STATION UNIT No.: 2 i MONTH: April SIM4ARY OF OPERATING EXPERIENCE i
Page 2 of 2 l
Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
Date Time Data April 11, 1997 1159 Recommenced ramp to 100% power.
l 1210 Unit stable at 100% power, 942 MWe. 1
. April 30, 1997 2400 Ended month in Mode 1 at 100% power, 947 MWe.
4 i a i
l I
1 i
1 4
l
. I i
1 Page 1 of 1 UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet i
Docket No.: 50-339 Report Month April Unit Name: NA-2 Year: 1997 Date: May 5, 1997
Contact:
W. R. Matthews No entries this month.
l l;
l l
I l
i I
l 1
UNIT SHUTDOWS AND POWER REDUCTIONS .
DOCKET NO.: 50-339 .
UNIT NAME: NA-2 <
DATE: May 5, 1997 REPORT MONTH: April 1997 CONTACT: W. R. Matthews '*
PHONE: (540).894-2101 l
1 2 3 4 5 No. Date Type Duration Reason Method of . Licensee Sfstem Component Cause & Corrective (hrs) Shutting Event Code Code Action to Down Reactor Report # Prevent Recurrence ;
I t
I
- N o entries this month.
I 1: Type 2: Reason 3: Method 4 F= Forced A= Equipment Failure (explain) l= Manual Exhibit F - Instructions i S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets _for Licensee i D= Regulatory Restriction 4= Continuations Event Report (LER) File '
E= Operator Training & License Examination 5= Load Reduction (NUREG-0161) ;
F= Administrative 9-Other i G= Operational Error 5:
H=Other (explain) Exhibit H - Same Source i
I i
f I
I
- - - . . _ _ . . __ -