Summary of Meeting W/Ge on 781018 Re Content of Lic Renewal Appl & of an Amend Appl for Combining Lics#SNM-1265 & #SNM-1281.Topics Discussed Incl Licensing Procedures & Current Appls.Meeting Notes Encl
ML20148N991
Person / Time
Site: 07001308, 07001309
Issue date: 10/27/1978
From: Empson F
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Rouse L
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20148N996 List:
References
NUDOCS 7811280045
Download: ML20148N991 (2)


Text

_ _ _ - - _ _ _ _ _ _

s . . l *.

~/D 4, UNITED STATES y4 4 NUCLEAR REGULATORY COMMISSION j WASHINGTON, D. C. 20555

          • Q CT L 'i D n Docket 70-1308 SNM-1265 V Docket 70-1309 SNM-1281 MEMORANDUM FOR: L. C. Rouse, Acting Chief Fuel Reprocessing and Recycle Branch FROM: F. M. Empson Fuel Reprocessing and Recycle Branch

SUBJECT:

SUMMARY

OF MEETING WITH GENERAL ELECTRIC COMPANY, OCTOBER 18, 1978 REGARDING THE CONTENT OF LICENSE RENEWAL APPLICATION AND OF AN AMENDMENT APPLICATION FOR COMBINING l LICENSES SNM-1265 AND SNM-1281 The persons listed below participated in the meeting at Silver Spring, Maryland.

i General Electric Co. NRC ,

I l D. M. Dawson F. M. Empson H. A. Rogers J. P. Roberts C. C. Herrington The following subjects were discussed and certain conclusions reached.

Signed meeting notes which documented the major conclusions of the meeting are an attachment to this sunmary,

1. Content of renewal application for License SNM-1265 In accordance with the agreement reached at the September 20, 1978 meeting between GE and the staff, a letter was delivered to GE regarding the content of their renewal application. The letter emphasized that the application should be complete when submitted. This is particularly important because of the relatively short time frame (March-August) in which the appli-cation must be processed.

78132pocN5"

..a. ,'

L. C. Rouse GE was also informed that the present format of Consolidated Safety Analysis Report, NE00-21320 was acceptable for the application even though it differs somewhat from the present '

draft of the proposed Regulatory Guide 3.24.1. GE stated that they plan to submit a new "C" version of the CSAR which will include both old and new information specified in the proposed regulatory guide. They pointed out that certain information specified in the proposed regulatory guide may not be pertinent to the renewal application for an operating facility. GE was also informed that, assuming a favorable decision, the renewal would probably be issued under the provisions of 10 CFR Part 70 since 10 CFR Part 72 is not expected to be effective by the desired renewal date.

2. Licensing Procedures It was confirmed that the renewal application would be noticed in the Federal Register as soon as practical after receipt.

l The period for public participation will be 30 days. The l period of the renewed license was also discussed. If the renewal is issued under the terms of 10 CFR Part 70, it will be for 5 years. If issued under 10 CFR Part 72, it will be for up to 20 years.

3. Current Amendment Application GE delivered their response to the seismic question sent them on October 5, 1978.
4. Amendment Application for Combining SNM-1265 and SNM-1281 GE delivered an amendment application to incorporate license SNM-1281 for radioactive standards and sources into license SNM-1265. Chapter 10 of the CSAR would be amended to include all current license conditions and mada a part of the license.

?? l & I #

F. M. Emp Fuel Reprocessing and Recycle Branch Division of Fuel Cycle and Material Safety cc: D. M. Dawson, GE

Enclosure:

Signed mec ,i+s

...u '

f  % UNITED STATES yq 4 NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 .

y I d ,, j _

oh October 18, 1978

%,..b[/

Docket 70-1308 Docket 70-1309 NOTES OF MEETING WITH GENERAL ELECTRIC COMPANY REGARDING: 1) CONTENT OF RENEWAL APPLICATION FOR LICENSE SNM-1265;

2) APPLICATION FOR INCORPORATION OF LICENSE SNM-1281 (DOCKET 70-1309)

INTO LICENSE SNM-1265 (DOCKET 70-1308)

1. It was agreed that the present format of the Consolidated Safety Analysis Report i.; acceptable for the renewal application. The minor organizational differences between proposed R.G. 3.24.1 and the CSAR do not appear to be fundamental. GE may make changes in CSAR to conform more closely to the proposed guide if they find it to be desirable. - . -
2. General Electric was told that the renewal would probably be issued under conditions of 10 CFR Part 70 since 10 CFR Part 72 will probably not be effective bythe renewal date. The renewal (A application will be noticed in the Federal Register With opportunity for public participation.
3. General Electric reviewed their response to the extant seismic ques tion. Thic respor.se was delivered to the docket file.
4. General Electric also reviewed their application for combination of License SN"-1281 into SNM-1265. This was also delivered to

, the docket file.

f'd WW 4 ster % 4 D. M. Dawson F. M. mpson a . P. Roberts General Electric Company Fuel Reprocess ng & Recycle Branch Division of Fuel Cycle & Material Safety 1