Text
t, '
pfO4W~
November 22, 1985 Carolina Power and Light Company ATTN: - Mr. E. E. Utley .
Senior Executive Vice President Power Supply and Engineering and Construction 411 Fayetteville Street Raleigh, NC 27602 Gentlemen:.
SUBJECT:
.SHEARON HARRIS COLD LICENSE EXAMINATION SCHEDULE This .is in reference to a conference call between representatives of your staff and the NRC:on November 14, 1985. Participants during this conversation are identified in the enclosure.- The purpose of this conference call was to discuss the examination' schedule for the second group of Shearon Harris cold license candidates. The following points of agreement were reached.
- 1. Written examinations will be administered to Shearon Harris candidates (approximately 36) as scheduled during the week of January 20, 1986.
- 2. Plant walk-through and simulator examinations (operating tests) will be administered at a future, mutually agreeable date to this same group of candidates.
- 3. The schedule for the operating tests will be developed following the Carolina Power and Light (CP&L) Board . of Directors meeting in mid-December 1985.
- 4. . Since waivers have already been granted, the November 1985 candidates will not be required to take simulator examinations, unless unforeseen circumstances arise. Two examples of such circumstances are:
- a. An exceptionally high failure rate on the simulator phase of Group 2 examinations (those candidates taking the written test in
' January).
b.- An unusually long delay in the fuel load date of Shearon Harris.
If you have any questions concerning these matters, please call me or
~Mr. Bruce A. Wilson (404) 331-5542.
-Sincerely, (Original signed by DMVerrelli)
David M. Verrelli, Chief Reactor Projects Branch No. 1 Division of Reactor Projects
Enclosure:
(Seepage 2) 0511270201 851122 I lg PDR - ADOCK 05000400 V PDR
.TA '{1]
~
r:-
d- b Carolina Power and Light Company 2 Novenber 22, 1985
Enclosure:
Conference Call Participants cc w/ encl:
R. A. Watson, Vice President Harris Nuclear Project R. M. Parsons, Project General Manager J. L. Willis, Plant General Manager bec w/ encl:
NRC Resident Inspector Document Control Desk State of North Carolina I
h g' 11 gl g"f, BAW11 Ton: CAJul an QoR PFredrickson 11/zf/85 11/p/85 11/za/85
ENC'LOSURE CONFERENCE CALL PARTICIPANTS NOVEMBER 14, 1985 Carolina Power and Light Company <
F. Tollison, Manager of Nuclear Training J. Willis, Plant Manager W. Powell, Director of Training
-C. Olexik, Lead Simulator Instructor Nuclear Regulatory Commission C. A. Julian, Acting Chief, Operations Branch B. A. Wilson, Chief, Operator Licensing Section P. Fredrickson, Chief, Projects Section IC L. Mellen, Project Engineer