Text
-
'. CN Commonwzith Edison h j / Braidwood Nuclear Power station
\ w' Route #1, Box 84
- Braceville. lilinois 60407 Telephone 815/458-2801 August 9,1994 BW/94-0135 Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Document Control Desk
Dear Sir:
Enclosed for your information is the Monthly Performance Report covering Braidwood Nuclear Generating Station for the period July 1 through July 31,1994.
I we K. L. Kofron f
Station Manager Braidwood Station KLK/CEP/dla Attachments cc: J. B. Martin, U.S.N.R.C., Region lli R. R. Assa, U.S.N.R.C.
l.D.N.S. l U.S.N.R.C. Resident inspector, Braidwood INPO Records Center D. L. Farrar, Nuclear Regional Service Mgr. l D. M. Saccomando, Nuclear Licensing Admin. I D. R. Eggett, Nuclear Engineering Dept. l K. L. Kaup, Site Vice President, Braidwood l NFS, PWR Plant Support P. L. Habel, Unit 1 Operating Engineer ;
J. P. Kuchenbecker, Unit 2 Operating Engineer Nuclear Group, Systems Engineering, Bwd 1 g:p 'c
" 7 1.D.N.S. Resident inspector, Braidwood J. M. Bunecicky, Westinghouse of, D. R. Seavers, A.N.I. / y' I
I 9400220074 940731 }
ADOCK 050oo456
{DR PDR (
a a a m ama--
8 a g,
e 4
BRAIDWOOD NUCLEAR POWER STATION UNIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT Com Ed NRC DOCKET NO. 050-456, LICENSE NO. NPF - 72 NRC DOCKET NO. 050-457, LICENSE NO. NPF - 77 a
I A. OPERATING DATA REPORT Docket No: 50 - 456 !
Unit: Braidwood 1 Date: 8/10/1994-Completed by: Chris Pershey Telephone: 815-458-2801 OPERATING STATUS
- 1) Reporting Period: July 1994 Gross Hours: L4f 4
i 4
- 2) Currently Authorized Power Level (MWt): 3411 Design Electrical Rating (MWe-gross): j.j]75 Design Electrical Rating (MWe-net): lji.2.Q l Max Dependable Capacity (MWe-gross): j.jl1 Max Dependable Capacity (MWe-net): 1120
- 3) Power level to which restricted (if Any): None l
- 4) Reasons for restrictions (If Any): None j 1
This Mo. Yr to Date - Cumulative
- 5) Report Period Hours: 744.0 5,087.0 52,640.0
- 6) Hours Reactor Critical: 744.0 3,440.3 41,038.5
- 7) RX Reserve Shutdown Hours: -. 0 .0 .0
- 8) Hours Generator on Une: 744.0 3,393.2 40,418.2 l 1
- 9) Unit Reserve Shutdown Hours: .0 .0 .0
- 10) Gross Thermal Energy (MWHt): 2,508,352.2 10,835,484.9 126,284,364.1
- 11) Gross Elect. Energy (MWH): 857,216.0 3,734,496.0 42,549,083.0
- 12) Net Elect. Energy (MWH): 825,976.0 3,578,767.0 40,721,584.0
- 13) Reactor Service Factor: 100.0 67.6- 78.0
- 14) Reactor Availability Factor: 100.0 67.6 78.0
- 15) Unit Service Factor: 100.0 66.7 76.8 l
- 16) Unit Availability Factor: 100.0 66.7 76.8
- 17) Unit Capacity Factor (MDC NET): 99.1 62.8 69.1
=
- 18) Unit Capacity Factor (DER NET): 99.1 62.8 69.1
- 19) Unit Forced Outage Rate: 0.0 0.0 8.8
- 20) Unit Forced Outage Hours: 0.0 0.0 3905.1
- 21) Shutdown Schedule Over Next 6 Months:
22)If Shutdown at End of Reporting Period, Estimated Date of Startup:
1 -
i
, 4' B. AVERAGE DAILY UNIT NET POWER LEVEL LOG ;
Docket No: 50 - 456 Unit: Braidwood'1 Date: 8/10/1994 Completed by: Chris Pershey -
Telephone: 8154 58-2801 MONTH: July 1994 l a
Q_a.y MWe-net Qay MWe-net
- 1) 1102 16) 1101
- 2) 1121
- 17) 1100
- 3) 1114 18) 1113
- 4) 1123
- 19) 1115
- 5) 1121
- 20) 1115
! 6) 1119 21) 1118
- 7) 1119 22) 1117
- 8) 1120 23) 1112
- 9) 1124
- 24) 1099
- 10) 1045 25) 1119
- 11) 1097 26) 1109
- 12) 1115 27) 1101
- 13) 1118 28) 1066
- 14) 1117 29) 1121
- l
- 15) 1103 30) 1116
- 31) 1123
- E
- Due to condenser efficiency 3
)
i i
k.
C. UNIT SHUTDOWNSIREDUCTIONS -
Docket No.: 50 - 456 -
Unit: Braidwood 1 Date: 8/10/1994 Completed by: Chris Pershey Telephone: 815-458-2801 REPORT PERIOD: July 1994 LER Cause & Corrective Action No. Date Tvoe Hours Reason Method Number System Component to Prevent Recurrence None Unit 1 entered the month of June 1994 at 100% capable. The unit operated routinely through the end of the month.
TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A- Equipment Failure Maint or Test 1 - Manual S - Scheduled B - Maint or Test 2 - Manual Scram Exhibit F & Instructions for C - Refueling 3 - Auto Scram - Preparation of Data Entry Sheet D - Regulatory Restriction 4 - Continued Licensee Event Report (LER)
E - Operator Training & Licensee Examination 5 - Reduced Load File (NUREG-0161).
F - Administration G - Operator Error H - Other
D. SAFETY /REUEF VALVE OPERATIONS Docket No.: 50 - 456 Unit: Braidwood 1 Date: 8/10/1994 Completed by: Kevin Knight Telephone: 815-458-2801 Valves No. & Type Plant Date Actuated Actuation Condition Description of Event None
a A. OPERATING DATA REPORT Docket No: 50 - 457 Unit: Braidwood 2 Date: 8/10/1994 Completed by: Chris Pershey Telephone: 815-458-2801 OPERATING STATUS
- 1) Reporting Period: July 1994 Gross Hours: Z44
- 2) Currently Authorized Power Level (MWt): 3411 Desl0n Electrical Rating (MWo gross): 1175 Design Electrical Rating (MWe-net): 1120 Max Dependable Capacity (MWo-gross): 1175 Max Dependable Capacity (MWe-net): 1120
- 3) Power level to which restricted (if Any): None
- 4) Reasons for restrictions (if Any): Ho_n_g I l
This Mo. Yr to Date Cumulative !
1
- 5) Report Period Houis: 744.0 5,087.0 50,722.0
- 6) Hours Reactor Critical: 744.0 3,808.6 42,122.7
- 7) RX Reserve Shutdown Hours: .0 .0 .0
- 8) Hours Generator on Une: 744.0 3,797.9 41,784.2
- 9) Unit Reserve Shutdown Hours: .0 .0 .0
- 10) Gross Thermal Energy (MWHt): 2,507,248.7 11,573,587.8 128,569,033.5
- 11) Gross Elect. Energy (MWH): 851,880.0 3,970,593.0 43,084,416.0
- 12) Net Elect. Energy (MWH): 821,011.0 3,823,514.0 41,290,097.0 1
- 13) Reactor Service Factor: 100.0 74.9 83.0 l
- 14) Reactor Availability Factor: 100.0 74.9 83.0
- 15) Unit Service Factor: 100.0 74.7 82.4
- 16) Unit Availability Factor: 100.0 74.7 82.4 l
- 17) Unit Capacity Factor (MDC NET): 98.5 67.1 72.7
- 18) Unit Capacity Factor (DER NET): 98.5 67.1 72.7
- 19) Unit Forced Outage Rate: 0.0 25.3 6.1
- 20) Unit Forced Outage Hours: 0.0 1289.1 2735.1
- 21) Shutdown Schedulo Over Next 6 Months: 9/1/94
- 22) If Shutdown at end of Reporting Period, Estimated Date of Startup:
+= .
i *
- B. AVERAGE DAILY UNIT NET POWER LEVEL LOG Docket No: 50 - 457 Unit: Braidwood 2 Date: 8/10/1994 Completed by: Chris Pershey Telephone: 815-458-2801 MONTH: July 1994 Qay MWe-net Ray MWe-net
- 1) 1092 16) 1111
- 2) 1028 17) 1105
- 3) 1115 18) 1082
- 4) 1110 19) 1109
- 5) 1108 20) 1112 i 6) 1109 21) 1109
- 7) 1112 22) 1100 i
- 8) 1112 23) 1113
- 9) 1116 24) 1107
- 10) 1121
- 25) 1106
- 11) 1119 26) 1108
- 12) 1115 '. < g 1111
- 13) 1114 29 1113
- 14) 1113 ?.9) 1115 ,
- 15) 1113 30) 1110
- 31) 1032
- Due to condenser efficiency l 1
j.
4 1
w n ---w - , . , ,,, ,- , w ,
~ . ., . . . .. . - - . - . _
3 C. UNIT SHUTDOWNS / REDUCTIONS -
Docket No.: 50 - 457 .
Unit: Braidwood 2.
Date: 8/10/1994 l l Completed by: Chris Pershey ;
Telephone: 815-458-2801 i
~
REPORT PERIOD: Ju!y 1994 LER Cause & Corrective Action
& Date Tvoe Hours Reason Method Number System Component to Prevent Recurrence i None W
) ;
J t
1 i
Unit 2 entered the month of June 1994 at 100% capable. The unit operated routinely through the end of the month.
i i
TYPE REASON METHOD SYSTEM & COMPONENT
! F - Forced A - Equipment Failure Maint or Test 1 - Manual
, S - Scheduled B - Maint or Test 2 - Manual Scram Exhibit F & Instructions for C - Refueling .
3 - Auto Scram Preparation of Data Entry Sheet i
D - Regulatory Restriction 4 - Continued Licensee Event Report (LER) .
E - Operator Training & Licensee Examination 5 - Reduced Load File (NUREG-0161).
F - Administration G - Operator Error H - Other
D. SAFETY REUEF VALVE OPERATIONS -
4
~
Docket No.: 50 - 457 .
Unit: Braidwooli 2 Date: 8/10/1994 Completed by: Kevin Knight Telephone: 815-458-2801 Valves No. & Type Plant Date Actuated Actuation Condition Description of Event None
--. - __. - _ - . --. __ _ _____________________ ____ _