ML20107L413
From kanterella
ML20107L413 | |
Person / Time | |
---|---|
Site: | Catawba |
Issue date: | 07/31/1984 |
From: | Czajkowski C BROOKHAVEN NATIONAL LABORATORY |
To: | NRC |
Shared Package | |
ML20107L149 | List: |
References | |
FOIA-84-722 NUDOCS 8502280643 | |
Download: ML20107L413 (17) | |
Similar Documents at Catawba | |
---|---|
Category:CONTRACTED REPORT - RTA
MONTHYEARML20205N3791998-02-28028 February 1998
[Table view]Technical Evaluation Rept on Submittal Only Review of IPE of External Events at Catawba Nuclear Station,Units 1 & 2 ML20135B3111997-01-31031 January 1997 Technical Evaluation Rept on Second 10-Yr Interval ISI Program Plan, for Plant,Unit 2 ML20107N0371996-02-29029 February 1996 Submittal-Only Review of McGuire Nuclear Station Individual Plant Exam of External Events, Draft Rept ML20107N0101996-02-29029 February 1996 Submittal-Only Review of Catawba Nuclear Station Individual Plant Exam of External Events, Draft Rept ML20115K0681992-09-30030 September 1992 Auxiliary Feedwater System RISK-BASED Inspection Guide for the Catawba Nuclear Power Plant ML20086N3001991-12-10010 December 1991 Final Technical Evaluation Rept,Catawba Nuclear Station, Station Blackout Evaluation ML20086G5981991-10-31031 October 1991 Technical Evaluation:Core Thermal-Hydraulic Methodology Using VIPRE-01,Topical Rept DPC-NE-2004 ML20043D6731990-05-31031 May 1990 Trip Rept of Onsite Analysis of Human Factors of Event at Catawba Unit 1 on 900320 (Overpressurization of RHR Sys). ML19332B8801989-05-31031 May 1989 Technical Evaluation Rept on First 10-Yr Interval Inservice Insp Program Plan:Duke Power Co,Catawba Nuclear Station, Units 1 & 2, Technical Evaluation Rept ML20070Q5191988-12-31031 December 1988 Nuclear Power Plant Sys Sourcebook,Catawba 1 & 2 ML20207P1131988-08-31031 August 1988 Technical Evaluation Rept for Evaluation of Offsite Dose Calculation Manual,Updated Through Rev 20 ML20237J0621987-08-19019 August 1987 Technical Evaluation Rept on Duke Power Co McGuire & Catawba Nuclear Stations Spds ML20237J1411987-08-17017 August 1987 Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807 ML20215L5221987-05-31031 May 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components,Catawba Units 1 & 2, Informal Rept ML20214F4751987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.2, `Vendor Interface Programs (All Other Safety-Related Components),' Catawba 1 & 2 ML20207H3511986-11-30030 November 1986 Pump & Valve Inservice Testing Program,Catawba Nuclear Station Units 1 & 2, Technical Evaluation Rept ML17334B0331986-11-30030 November 1986 Input for Ser,Beaver Valley Power Station Units 1 & 2, Braidwood Station Units 1 & 2,Byron Station Units 1 & 2, Callaway Plant Unit 1,Catawba Nuclear Station Units 1..., Reactor Trip Sys Reliability Item 4.5.2 Generic Ltr 83-28. ML20197J4641986-04-30030 April 1986 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Catawba Nuclear Stations 1 & 2,DC Cook Nuclear Power Plants 1 & 2,WB McGuire Nuclear Stations 1 & 2,Sequoyah Nuclear Plants 1 & 2 ML20136F6531985-12-31031 December 1985 Review of Tdi Diesel Generator Owners Group Engine Requalification Program,Final Rept, Technical Evaluation Rept ML20128H7791985-06-30030 June 1985 Rev 1 to Review of Engine Base & Bearing Caps for Tdi DSRV-12,DSRV-16 & DSRV-20 Diesel Engines, Technical Evaluation Rept ML20133L3761985-05-31031 May 1985 Draft Conformance to Reg Guide 1.97,Catawba Nuclear Station,Units 1 & 2, Technical Evaluation Rept ML20126E9861985-05-31031 May 1985 Review of Emergency Diesel Generator Engine & Auxiliary Module Wiring & Terminations, Technical Evaluation Rept ML20107L4131984-07-31031 July 1984 Draft Catawba Socket Weld Evaluation ML20081D2721983-10-31031 October 1983 Control of Heavy Loads at Nuclear Power Plants - Catawba Nuclear Station Units 1 & 2 (Phase Ii), Draft Technical Evaluation Rept ML20081F4711983-10-31031 October 1983 Review of the Catawba Units 1 and 2 Auxiliary Feedwater System Reliability Analysis ML20090A7691981-10-26026 October 1981 Evaluation Rept on Catawba Emergency Plan Dtd (Aug 1980), 810331 1998-02-28 Category:QUICK LOOK MONTHYEARML20205N3791998-02-28028 February 1998
[Table view]Technical Evaluation Rept on Submittal Only Review of IPE of External Events at Catawba Nuclear Station,Units 1 & 2 ML20135B3111997-01-31031 January 1997 Technical Evaluation Rept on Second 10-Yr Interval ISI Program Plan, for Plant,Unit 2 ML20107N0371996-02-29029 February 1996 Submittal-Only Review of McGuire Nuclear Station Individual Plant Exam of External Events, Draft Rept ML20107N0101996-02-29029 February 1996 Submittal-Only Review of Catawba Nuclear Station Individual Plant Exam of External Events, Draft Rept ML20115K0681992-09-30030 September 1992 Auxiliary Feedwater System RISK-BASED Inspection Guide for the Catawba Nuclear Power Plant ML20086N3001991-12-10010 December 1991 Final Technical Evaluation Rept,Catawba Nuclear Station, Station Blackout Evaluation ML20086G5981991-10-31031 October 1991 Technical Evaluation:Core Thermal-Hydraulic Methodology Using VIPRE-01,Topical Rept DPC-NE-2004 ML20043D6731990-05-31031 May 1990 Trip Rept of Onsite Analysis of Human Factors of Event at Catawba Unit 1 on 900320 (Overpressurization of RHR Sys). ML19332B8801989-05-31031 May 1989 Technical Evaluation Rept on First 10-Yr Interval Inservice Insp Program Plan:Duke Power Co,Catawba Nuclear Station, Units 1 & 2, Technical Evaluation Rept ML20070Q5191988-12-31031 December 1988 Nuclear Power Plant Sys Sourcebook,Catawba 1 & 2 ML20207P1131988-08-31031 August 1988 Technical Evaluation Rept for Evaluation of Offsite Dose Calculation Manual,Updated Through Rev 20 ML20237J0621987-08-19019 August 1987 Technical Evaluation Rept on Duke Power Co McGuire & Catawba Nuclear Stations Spds ML20237J1411987-08-17017 August 1987 Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807 ML20215L5221987-05-31031 May 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components,Catawba Units 1 & 2, Informal Rept ML20214F4751987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.2, `Vendor Interface Programs (All Other Safety-Related Components),' Catawba 1 & 2 ML20207H3511986-11-30030 November 1986 Pump & Valve Inservice Testing Program,Catawba Nuclear Station Units 1 & 2, Technical Evaluation Rept ML17334B0331986-11-30030 November 1986 Input for Ser,Beaver Valley Power Station Units 1 & 2, Braidwood Station Units 1 & 2,Byron Station Units 1 & 2, Callaway Plant Unit 1,Catawba Nuclear Station Units 1..., Reactor Trip Sys Reliability Item 4.5.2 Generic Ltr 83-28. ML20197J4641986-04-30030 April 1986 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Catawba Nuclear Stations 1 & 2,DC Cook Nuclear Power Plants 1 & 2,WB McGuire Nuclear Stations 1 & 2,Sequoyah Nuclear Plants 1 & 2 ML20136F6531985-12-31031 December 1985 Review of Tdi Diesel Generator Owners Group Engine Requalification Program,Final Rept, Technical Evaluation Rept ML20128H7791985-06-30030 June 1985 Rev 1 to Review of Engine Base & Bearing Caps for Tdi DSRV-12,DSRV-16 & DSRV-20 Diesel Engines, Technical Evaluation Rept ML20133L3761985-05-31031 May 1985 Draft Conformance to Reg Guide 1.97,Catawba Nuclear Station,Units 1 & 2, Technical Evaluation Rept ML20126E9861985-05-31031 May 1985 Review of Emergency Diesel Generator Engine & Auxiliary Module Wiring & Terminations, Technical Evaluation Rept ML20107L4131984-07-31031 July 1984 Draft Catawba Socket Weld Evaluation ML20081D2721983-10-31031 October 1983 Control of Heavy Loads at Nuclear Power Plants - Catawba Nuclear Station Units 1 & 2 (Phase Ii), Draft Technical Evaluation Rept ML20081F4711983-10-31031 October 1983 Review of the Catawba Units 1 and 2 Auxiliary Feedwater System Reliability Analysis ML20090A7691981-10-26026 October 1981 Evaluation Rept on Catawba Emergency Plan Dtd (Aug 1980), 810331 1998-02-28 Category:ETC. (PERIODIC MONTHYEARML20205N3791998-02-28028 February 1998
[Table view]Technical Evaluation Rept on Submittal Only Review of IPE of External Events at Catawba Nuclear Station,Units 1 & 2 ML20135B3111997-01-31031 January 1997 Technical Evaluation Rept on Second 10-Yr Interval ISI Program Plan, for Plant,Unit 2 ML20107N0371996-02-29029 February 1996 Submittal-Only Review of McGuire Nuclear Station Individual Plant Exam of External Events, Draft Rept ML20107N0101996-02-29029 February 1996 Submittal-Only Review of Catawba Nuclear Station Individual Plant Exam of External Events, Draft Rept ML20115K0681992-09-30030 September 1992 Auxiliary Feedwater System RISK-BASED Inspection Guide for the Catawba Nuclear Power Plant ML20086N3001991-12-10010 December 1991 Final Technical Evaluation Rept,Catawba Nuclear Station, Station Blackout Evaluation ML20086G5981991-10-31031 October 1991 Technical Evaluation:Core Thermal-Hydraulic Methodology Using VIPRE-01,Topical Rept DPC-NE-2004 ML20043D6731990-05-31031 May 1990 Trip Rept of Onsite Analysis of Human Factors of Event at Catawba Unit 1 on 900320 (Overpressurization of RHR Sys). ML19332B8801989-05-31031 May 1989 Technical Evaluation Rept on First 10-Yr Interval Inservice Insp Program Plan:Duke Power Co,Catawba Nuclear Station, Units 1 & 2, Technical Evaluation Rept ML20070Q5191988-12-31031 December 1988 Nuclear Power Plant Sys Sourcebook,Catawba 1 & 2 ML20207P1131988-08-31031 August 1988 Technical Evaluation Rept for Evaluation of Offsite Dose Calculation Manual,Updated Through Rev 20 ML20237J0621987-08-19019 August 1987 Technical Evaluation Rept on Duke Power Co McGuire & Catawba Nuclear Stations Spds ML20237J1411987-08-17017 August 1987 Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807 ML20215L5221987-05-31031 May 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components,Catawba Units 1 & 2, Informal Rept ML20214F4751987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.2, `Vendor Interface Programs (All Other Safety-Related Components),' Catawba 1 & 2 ML20207H3511986-11-30030 November 1986 Pump & Valve Inservice Testing Program,Catawba Nuclear Station Units 1 & 2, Technical Evaluation Rept ML17334B0331986-11-30030 November 1986 Input for Ser,Beaver Valley Power Station Units 1 & 2, Braidwood Station Units 1 & 2,Byron Station Units 1 & 2, Callaway Plant Unit 1,Catawba Nuclear Station Units 1..., Reactor Trip Sys Reliability Item 4.5.2 Generic Ltr 83-28. ML20197J4641986-04-30030 April 1986 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Catawba Nuclear Stations 1 & 2,DC Cook Nuclear Power Plants 1 & 2,WB McGuire Nuclear Stations 1 & 2,Sequoyah Nuclear Plants 1 & 2 ML20136F6531985-12-31031 December 1985 Review of Tdi Diesel Generator Owners Group Engine Requalification Program,Final Rept, Technical Evaluation Rept ML20128H7791985-06-30030 June 1985 Rev 1 to Review of Engine Base & Bearing Caps for Tdi DSRV-12,DSRV-16 & DSRV-20 Diesel Engines, Technical Evaluation Rept ML20133L3761985-05-31031 May 1985 Draft Conformance to Reg Guide 1.97,Catawba Nuclear Station,Units 1 & 2, Technical Evaluation Rept ML20126E9861985-05-31031 May 1985 Review of Emergency Diesel Generator Engine & Auxiliary Module Wiring & Terminations, Technical Evaluation Rept ML20107L4131984-07-31031 July 1984 Draft Catawba Socket Weld Evaluation ML20081D2721983-10-31031 October 1983 Control of Heavy Loads at Nuclear Power Plants - Catawba Nuclear Station Units 1 & 2 (Phase Ii), Draft Technical Evaluation Rept ML20081F4711983-10-31031 October 1983 Review of the Catawba Units 1 and 2 Auxiliary Feedwater System Reliability Analysis ML20090A7691981-10-26026 October 1981 Evaluation Rept on Catawba Emergency Plan Dtd (Aug 1980), 810331 1998-02-28 Category:TEXT-PROCUREMENT & CONTRACTS MONTHYEARML20205N3791998-02-28028 February 1998
[Table view]Technical Evaluation Rept on Submittal Only Review of IPE of External Events at Catawba Nuclear Station,Units 1 & 2 ML20135B3111997-01-31031 January 1997 Technical Evaluation Rept on Second 10-Yr Interval ISI Program Plan, for Plant,Unit 2 ML20107N0101996-02-29029 February 1996 Submittal-Only Review of Catawba Nuclear Station Individual Plant Exam of External Events, Draft Rept ML20107N0371996-02-29029 February 1996 Submittal-Only Review of McGuire Nuclear Station Individual Plant Exam of External Events, Draft Rept ML20115K0681992-09-30030 September 1992 Auxiliary Feedwater System RISK-BASED Inspection Guide for the Catawba Nuclear Power Plant ML20086N3001991-12-10010 December 1991 Final Technical Evaluation Rept,Catawba Nuclear Station, Station Blackout Evaluation ML20086G5981991-10-31031 October 1991 Technical Evaluation:Core Thermal-Hydraulic Methodology Using VIPRE-01,Topical Rept DPC-NE-2004 ML20062G7091990-10-29029 October 1990 Notification of Contract Execution,Task Order 14, Maint Team Insp - Catawba Units 1 & 2, Awarded to Parameter,Inc ML20043D6731990-05-31031 May 1990 Trip Rept of Onsite Analysis of Human Factors of Event at Catawba Unit 1 on 900320 (Overpressurization of RHR Sys). ML19332B8801989-05-31031 May 1989 Technical Evaluation Rept on First 10-Yr Interval Inservice Insp Program Plan:Duke Power Co,Catawba Nuclear Station, Units 1 & 2, Technical Evaluation Rept ML20070Q5191988-12-31031 December 1988 Nuclear Power Plant Sys Sourcebook,Catawba 1 & 2 ML20207P1131988-08-31031 August 1988 Technical Evaluation Rept for Evaluation of Offsite Dose Calculation Manual,Updated Through Rev 20 ML20237J0621987-08-19019 August 1987 Technical Evaluation Rept on Duke Power Co McGuire & Catawba Nuclear Stations Spds ML20237J1411987-08-17017 August 1987 Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807 ML20215L5221987-05-31031 May 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components,Catawba Units 1 & 2, Informal Rept ML20214F4751987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.2, `Vendor Interface Programs (All Other Safety-Related Components),' Catawba 1 & 2 ML17334B0331986-11-30030 November 1986 Input for Ser,Beaver Valley Power Station Units 1 & 2, Braidwood Station Units 1 & 2,Byron Station Units 1 & 2, Callaway Plant Unit 1,Catawba Nuclear Station Units 1..., Reactor Trip Sys Reliability Item 4.5.2 Generic Ltr 83-28. ML20207H3511986-11-30030 November 1986 Pump & Valve Inservice Testing Program,Catawba Nuclear Station Units 1 & 2, Technical Evaluation Rept ML20197J4641986-04-30030 April 1986 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Catawba Nuclear Stations 1 & 2,DC Cook Nuclear Power Plants 1 & 2,WB McGuire Nuclear Stations 1 & 2,Sequoyah Nuclear Plants 1 & 2 ML20136F6531985-12-31031 December 1985 Review of Tdi Diesel Generator Owners Group Engine Requalification Program,Final Rept, Technical Evaluation Rept ML20128H7791985-06-30030 June 1985 Rev 1 to Review of Engine Base & Bearing Caps for Tdi DSRV-12,DSRV-16 & DSRV-20 Diesel Engines, Technical Evaluation Rept ML20126E9861985-05-31031 May 1985 Review of Emergency Diesel Generator Engine & Auxiliary Module Wiring & Terminations, Technical Evaluation Rept ML20133L3761985-05-31031 May 1985 Draft Conformance to Reg Guide 1.97,Catawba Nuclear Station,Units 1 & 2, Technical Evaluation Rept ML20107L4131984-07-31031 July 1984 Draft Catawba Socket Weld Evaluation ML20081F4711983-10-31031 October 1983 Review of the Catawba Units 1 and 2 Auxiliary Feedwater System Reliability Analysis ML20081D2721983-10-31031 October 1983 Control of Heavy Loads at Nuclear Power Plants - Catawba Nuclear Station Units 1 & 2 (Phase Ii), Draft Technical Evaluation Rept ML20090A7691981-10-26026 October 1981 Evaluation Rept on Catawba Emergency Plan Dtd (Aug 1980), 810331 1998-02-28 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20107L413&oldid=2814450"