ML20116K756
| ML20116K756 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 11/10/1992 |
| From: | GEORGIA POWER CO. |
| To: | |
| Shared Package | |
| ML20116K754 | List: |
| References | |
| NUDOCS 9211170361 | |
| Download: ML20116K756 (4) | |
Text
. _ _.._ _ - _ _ . . . _ . . _-.__ . _ _ _ . . . . . . . _ _ _ . . . _ _ _ _ _ _ _ _ - . .
ENCLOSURE 3 PLANT LATCH - UNIT 2 NRC DOCKET 50-366 OPERATING LICENSE NPF-5 REQUEST FOR TEMPORARY TECHNICAL SPECIFICATION REVISION:
ALLOW UNIT 1 STANDBY GAS TREATMFNT SYSTEM IN0PERABILITY FOR INSTALLATION Of TORUS HARDENED VENT E8C TAC NOS. M74869 AND M74870 PAGE CHANGE INSTRUCTIONS The proposed change to the Plant Hatch Unit 2 Technical Specifications will be incorporated as follows:
Remove Pa.gg Jnf rt Pagg 3/4 6-40 3/4 6-40 3/4 6-41 3/4 6-41 t
5 l
l
, -004125 l-HL-2962 7-1 9211170361 921110 PDR ADOCK ODOOO366 P> PDR
.. - . . . ,- ... . , , -- -. -- . - . _ -. ~ ~ . .. . -- .
. . .p,
- a. , CONTAINMENT SY$1tMS
=)/4.6.6 CONTAINMENT ATMOSPHERf CONTROL STANDBY CAS TRf.! MENT SYSIQj LIMITING COWITION f08t OPERATION 3.6.6.1 Two Hatch-Unit 2 independent standby gas treatment subsystems and two Hatch-Unit 1 independent standby gas treatment subsystems shall be OPERABLE.
APPLICABILITY: CONDITIONS 1, 2, 3, and *. l M11LLD
- a. With one of the above recuired standby gas treatment subsystems inoperatie, restore the inoperable subsvLtem to OPERABLE status within 7 days or be in at least HOT $HUTuvWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 1 and in (OLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />,
- b. With two or more of the above required standby is treatment subsystems ine erable be in at least HOT $HUIDOWN within z hours and in COLD SH'i!DOWNw!thinthenext24 hours,exceptasalowedbyActionc,
- c. With both of the Hatch-Unit I indeoendent standby gas treatment subsystems inoperable for installation of the Unit I torus hardened vent, unit 2 l operation may continue for a cumulative total of up to 7 days provided all 1 of the following requirements are met: )
- 1. Prior to removing either Unit I standby ans trsatment subsystem from
-service, demonstrate that a neastive pretfure can be maintained in the Unit 2 secondary containment and the Unit I modified secondary contait, ment under the following conditions: ,
- The Unit I secondary containment is in the modified mode.
- Both Unit 2 standby ont treatment subsystems are aligned with suction from both of ific subject areas and are operating with each filter train flow rate not more than 4000 cfm.
- Calm wind conditions (< 5 mph) exist.
- 2. Maintain both Unit 2 standby gas treatment subsystems OPERABLE.
- 3. Maintain Unit 2 secondary containment integrity, except for Unit I standby gas treatment system OPERABilliY requirements.
- 4. Maintain Unit I modified secondary containment integrity, except for Unit I standby gas treatment system OPERABILITY reuniraments.
- 5. Allow no Unit 1 CORE ALTERATIONS.
6.
Allownahandlingofirraparycontainmentlated the modified Uni 1 secon fuel or spent fuel shipping casks in if both Unit I stantby gas treatment subsystems are not restored to OPERABLE status within the allowable cumulative time period of 7 days or. if any of the above requirements cannot be met, be in at least HOT SHUTDONN within the next
- 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
$URVEILLANCE RE001PEMENTS _
4.6.6.1.1 Each Hatch Unit 2' standby gas treatnent subsystem shall be demonstrated OPERABLE:
a, from the control room, flow through the HEPA l}yinitiatingbarcoaladsorbersandverifyingthatthesystem Oters and c egeratesforatleastatotalo{l0hourseach31dayswith.
t e heaters on automatic contro
- b. At least once per 18 months or (1) after an structural main-tenance on the HEPA filter or charco41 adso ber housings, or following painting (2)ionzonecommunicatlngwiththesystemby: fire or chemical rt ease in any venti-lat ,
- 1. Verifying that the cleanup system satisfies the in-place -
testing acceptance criteria and uses the test procedures
~of Reaulatory Positions C.S a C 5.c and C.S.d of Regula-tory Guide 1.52 Revision I duly 1976,andthesystem flow rate is 4000+0,-1000cfm.
- 2. Verifying within 31 days after removal that a lWratory.
analysis of a representative carbon sample obtained in accordance with Regulato Position ~C.6.b of Regulatory Guide 1.52 Revision.1, meets the laboratory
.testingcrIteriaofkecu tory ly 1976,ition Pos C.6.a of Regula-tory Guide 1.$2, Revision 1 Duly 1976.
- When performin inservice h tatic or leak testing with the reactor coo ant temper ture above 2 liATCH - UNIT 2 --3/4 6-40 K:\wp\techsp\h\92-17U2/91
. ~ _ _.. _ _ . _ , _ . . , , _ ~ _ _ . _ _ _ _ _ . _ . _ , . _ , _ _ __ _ ,
j, *
~ CONTAHENT SYSTEMS
] .-
- 3/4.6.6 CONTAINMENT ATMO5PHERE CONTROL l l STANDBY GAS TREATMENT SYSTEM j
~) :
[i LIMITING CONDITION FOR OPERATION
- ~
l
[ -
( l
~3.6.6.1 Two Hatch-Unit 2 independent standby gas treatment subsystems
. and two Hatch-Unit'1 independent standby gas treatment subsystems shall be' OPERABLE.
,} ;
e APPLICABILITY: CONDITIONS 1, 2, 3, and *.
ACTION:
)
! a. With one of the above required standby gas treatment subsystems ]-
inoperable, restore the inoperable subsystem to OPERABLE status within 7 days or be in at least HOT $HUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. i
- b. With two or more of the above required standby gas treatment subsystems inoperable, be in at least HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD
~
SHUTDOWN within the next 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />sy - tyr//r 4 5 f u oW4 #/ g ewd c, .
SURVEILLANCE REQUIREMENTS
/25e secMY}4c.4 i 4.6.6.1.1 Each Hatch-Unit 2 standby gas treatment subsystem shall be )
demonstrated OPERABLE: '
- a. By initiating, from the control room, flow through the HEPA filters and charcoal adsorbers and verifying that the system operates for at least a total'of 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> each 31 days with p the heaters on automatic control. 1
, b. At least once perJ8 months or (1) after any structural main- '
> 4enance on the NEPA filter or 1 charcoal adsorber housings, or L (2) following painting, fire or chemical release in any venti-
?
i 1ation zone communicating with the system by:
i 1. Verifying that the cleanup system satisfies the in place l testing acceptance criteria and sses the test procedures )
, of Regulatory Positions C.S.a. C.S.c and C.5.d of-Regula-tory Guide 1.52, Revision 1, July 1976, and the system l
flow rate is 4000 + 0, -1000 cfa.
I 2. Verifying within 31 days after removal that a laboratory L f analysis of a representative carbon sample obtained in J l + accordance with Regulatory Position C.6.b of Regulatory l- Guide 1.52, Revision 1, July 1976, meets the. laboratory testing criteria of Regulatory Position C.6.a of Reguia-tory Guide 1.52, Revision 1. July 1976.
I
-*When performing inservice hydrostatic or leak testing with the reactor '
coolant temperature above 212'F. '
. l)Cc,C '73-/> .
HAT - UNIT 2 5/4 6 Amendment No. 91
.x .
f, -;
.* , j
~k Ul1@l [
-f
- c. With both of the Hatch-Unit 1 independent standby gas treatment f subsystems inoperable for installation of the Unit I torus hardened vent, Unit 2 operation may continue for a cumulative total of up to 7 days provided all of the following requirements are met:
- 1. Prior to removing either Unit I standby gas treatment subsystem i from service, demonstrate that a negative pressure can be -i maintained in the Unit 2 secondary containment and the Unit 1 -
modified secondary containment under the following conditions: j o The Unit I secondary containment is in the modified mode. !
o Both Unit 2 standby gas treatment subsystems are aligned with -i suction from both of the subject areas and are operating with each filter train flow rate not more than 4000 cfm. ,
o Calm wind conditions (< 5 mph) exist.
- 2. Maintain both Unit 2 standby gas treatment subsystems OPERABLE.
- 3. Maintain Unit 2-secondary containment integrity, except for Unit 1 ,
standby gas treatment system OPERABILITY requirements.
4, Maintain Unit 1 modified secondary containment integrity, except for Unit I standby gas treatment system OPERABILITY requirements.
9
- 5. All?w no Unit 1 CORE ALTERATIONS.
- 6. Allow no handling of irradiated fuel or spent fuel shipping casks in the inodified Unit I secondary containment.
If both Unit I standby gas treatment- subsystems are not restored to l OPERABLE status within the allowable cumulative time period of 7 days, I
or if any of the above requirements cannot be met,- be in at least HOT SHU100kN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and- in COLD SHUTDOWN within the' ,
following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
i y '
y ,v,,rv,..rr-,--ew ,. mm m,.m a.w - w.+-r, b _, ' re v - m 4,4.-----e
- e--..%-,,-----,-,_~,--w <e-