Text
,
DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 8/07/96 COMPLETED BY: R. Harris TELEPHONE: (609) 339-1106 OPERATING DATA REPORT OPERATING STATUS l 1. Reporting Period July 1996 Gross Hours in Report Period 744 l
l 2. Currently Authorized Power Level (MWt) 3293 Max, Depend. Capacity (MWe-Net) M Design Electrical Rating (MWe-Net) 1067
- 3. Power Level to which restricted (if any) (MWe-Net) Nong l 4. Reasons for restriction (if any) l l
l This Month Yr To Date Cumulative
- 5. No. of hours reactor was critical 744.0 3249.2 70173.1
- 6. Reactor reserve shutdown hours kg 0.0 0.0
- 7. Hours generator on line 744 3091 4 69033.0
- 8. Unit reserve shutdown hours 0.0 0.0 0.0
- 9. Gross thermal energy generated (MWH) 2417604 9680632 220454882
- 10. Gross electrical energy generated (MWH) 799780 3231451 73057073 l 11. Net electrical energy generated (MWH) 770485 3074084 69791319
- 12. Reactor service factor 100.0 63.6 83.3
- 13. Reactor availability factor 100.0 63.6 83.3
- 14. Unit service factor 100.0 60.5 81.9 l 15. Unit availability factor 100.0 60.5 81.9 l
- 16. Unit capacity factor (using MDC) 100.4 58.3 80.3
- 17. Unit capacity factor (using Design MWe) 97.1 56.4 77.6
- 18. Unit forced outage rate 00 0.0 4.9
- 19. Shutdowns scheduled over next 6 months (type, date, & duration):
- 20. If shutdown at end of report period, estimated date of start-up:
9608270361 960815 DR ADOCK 050003 4
)
DOCKET NO.: 50-354 UNIT: Hone Creek DATE: 8/07/96 COMPLETED BY; R. Harris TELEPHONE: (609)339-1106 OPERATING DATA REPORT UNIT SIIUTDOWNS AND POWER REDUCTIONS MONTil JUIN 1996 METHOD OF SHUTTING DOWN THE TYPE REACTOR OR F= FORCED DURATION REASON REDUCING CORRECTIVE NO. DATE S= SCHEDULED (HOURS) (1) POWER (2) ACTION / COMMENTS n/a
.- . . _ - . - ~.- - -- -. -
DOCKET NO.: 50-354
( .
UNIT: Hope Creek DATE: 8/07/96 i COMPLETED BY: R. Harris TELEPIlONE: (609) 339-1106 AVERAGE DAILY UNIT POWER LEVEL MONT11 JULY 1996 i
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1037 17 1062 2 1031 18 1008 3 1028 19 1040 l 4 1053 20 1056 i i
5 1040 21 1061 i 6 1033 22 1060 i
7 1015 23 .l_060 l
! 8 1033 24 1055 l
l 9 1036 25 1053 l
10 1026 26 1056 11 1040 27 1023 j i
q 12 1040 28 1047 j i 13 1035 29 1036 i 14 1016 30 1039 15 1024 31 936
, 16 1025 l
l J
i j
l
- l. :
i l _.
I I
DOCKET NO.: 50-354
. UNIT: Hope Creek DATE: 8/07/96 COMPLETED BY: L, Keolev TELEPHONE: (609) 339-1106 REFUELING INFORMATION MONTil JULY 1996
- 1. Refueling information has changed from last month:
Yes _ No X
- 2. Scheduled date for next refueling (RF07): 9/6/97
- 3. Scheduled date for restart following refueling: 11/5/97 4A. Will Technical Specification changes or other license amendments be required?
Yes - No X B. Ilas the Safety Evaluation covering the COLR been reviewed by the Station Operating -
Review Committee (SORC)?
Yes _
No X If no, when is it scheduled? To Be Determined for Cycle 8 COLR
- 5. Scheduled date(s) for submitting proposed licensing action: ;
Not reauired.
- 6. Important licensing considerations associated with refueling: )
l N/A I I
! 7. Number of Fuel As emblies:
l A. Incore 764 i B. In Spent Fuel Storage 1472
- 8. Present licensed spent fuel storage capacity: 4006 Future spent fuel storage capacity: 4006
- 9. Date oflast refueling that can be discharged 5/3/2006 l to spent fuel pool assuming the present licensed capacity; (EOCl3)
(Does allow for full-core off-load)
- (Assumes 244 bundle reloads every 18 months until then)
(Does D91 allow for smaller reloads due to improved fuel) l l
I l .
l i
! DOCKET NO.: 50-354 l UNIT: Hope Creek l
\ DATE: 8/07/96 l COMPLETED BY: R. Harris l TELEPHONE: (609) 339-1106 l MONTIILY OPERATING
SUMMARY
MONTH JULY 1996 i e The Hope Creek Generating Station remained on-line for the entire month and operated at essentially 100% power for the month of July 1996 except one load reduction identified below.
. Power was reduced to 87% on July 7,1996 starting at 0301 hours0.00348 days <br />0.0836 hours <br />4.976852e-4 weeks <br />1.145305e-4 months <br /> to perform monthly turbine valve testing. The load reduction was extended 22 minutes due to the load dispatcher's minimum generation alert. The unit was returned to 100% power on July 7,1996 at 0640.
. At the end of the month the unit had been on-line for 129 days. i l