1
,. l Wisconsin ,
1 Electnc POWER COMPANY Point Beoch Nuclear Plant (414)755-2321 6610 Nuclear Rd., Two Rivers, WI 54241 I
PBL 96-0123 June 5,1996 l
, 1 i Document Control Desk '
U. S. NUCLEAR REGULATORY COMMISSION Mail Station PI-137 Washington,DC 20555 Gentlemen:
DOCKETS 50-266 AND 50-301 MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 l
Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of May 19%.
Sincerely, L
l G. J. Maxfield l PBNP Manager smb I I
l Adachments l ,
oc: L. L. Smith, PSCW j NRC Regional Administrator, Region III
- NRC Resident inspector l
i I I 9606110358 960531 l PDR ADOCK 05000266 l R PDR 11003G
/y A swwn otuiuvauw tav axprouw s
l OPERATING DATA REPORT DOCKET NO. 50-266 ,,
i DATE: 06/04/96 -
A COMPLETED BY: B. J. Vander Velde , ,
TELEPHONE: 414-755-6681 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1 $NbES .
- 2. REPORTING PERIOD: May - 1996 .
- 3. LICENSED THERMAL POWER (MWT): 1518.5 .
l
- 4. NAMEPLATE RATING (GROSS MWE): 523.8 .
. i
- 5. DESIGN ELECTRICAL RATING (NET MWE): 497.0 .
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0 .
[
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0 ............ ............ ............ ;
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GiVE REASONS: '!
NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
- 10. REASONS FOR RESTRICTIONS, (IF ANY):
NA THIS MONTH YEAR TO DATE CUMULATIVE i
- 11. HOURS IN REPORTING PERIOD 744.0 3,647.0 224,135.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 3,082.5 187,736.9
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3 s
- 14. HOURS GENERATOR ON LINE 744.0 3,036.6 184,518.0
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,128,464.0 4,539,218.0 261,755,367.0 -
- 17. GROSS ELECTRICAL ENERGY GENERATED 386,430.0- 1,548,180.0 88,454,550.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 370,044.0 1,479,803.0 84,332,887.5
- 19. UNIT SERVICE FACTOR 100.0 % 83.3 % 82.3 % -
- 20. UNIT AVAILABILITY FACTOR 100.0 % 83.3 % 82.7 %
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 102.6 % 83.7 % 77.2 %
- 22. UNIT CAPACITY FACTOR (USING DER NET) 100.1 % 81.6 % 75.7 %
- 23. UNIT FORCED OUTAGE RATE O.0% 0.0% 1.5%
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
None
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22,1977 i f!
~~
POWT BEACH NUCLEAR PLANT DOCKET NO. 50-266 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach. Unit 1 MONTH MAY- 1996 DATE 6/4/96
~
COMPLETED BY B. J. Vander Velde TELEPHONE 414/682-5168 AVERAGE AVERAGE AVEnAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 497 11 498 21 497 2 497 12 496 22 497 3 497 13 494 23 498 4 498 14 499 24 498 5 498 15 49u 25 498 6 498 16 499 26 497 7 499 17 498 27 497 8 499 18 498 28 490 9 499 19 498 29 497 10 498 20 498 30 497 31 498 f
POLNT BEACH NUCLEAR PLANT Docket No. 50-266 . .
Unit Name Point Beach. Unit 1 UNIT SHUTDOWNS AND POWER REDUCTIONS Date June 4.1996 Completed By B. J. Vander Velde .,
REPORT MONTH MAY - 1996 Telephone No. 414/755-6681 Method of Ucensee Event Duration Reactor Report No. Systent Cornponent 2
Cause and Conective Action No. Date Type' (Hours) ' Reas n Shutdown' Code' Code' To Prevesa Recunence NA NA- NA NA NA NA NA N#. NA NA
'F: Forced ' Reason: ' Method: ' Exhibit G - L.L xness S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuadon of
, E - Operator Traimag & Previous Shutdown Licensing Exam 5 - Reduced lead F- Administrative 6 - Other (explain) ' Exhibit I - Same Source G - Operational Error (explain)
H - Other (explain)
PBF-0028b (03 C )
I
L ,
- l. ,
, DOCKET NO. 50-266
! UNIT NAME ' Point Beach Unit 1 l i
DATE 6/5/96 '
COMPLETED BY B. J. Vander Velde l TELEPHONE 414/755-6681 l
Unit 1 operated at an average of 497 MWe net for the May,1996 report period.
l Licensee Event Report 266/96-001, Inadvertent ESF Actuation in Train B due to DC System Ground, l was submitted.
l Licensee Event Report 266/96-002, Auxiliary Feedwater Pump Discharge Valves Found Shut When Critical, was submitted.
1 Safety-related maintenance included:
- 1. P-032A and P-032B service water pump, packing adjusted.
- 2. G-02 emergency diesel generator, relay replaced.
l 3. G-03 emergency diesel generator lube oil recirc pump, coupling tightened. i j- 1
- 4. P-14A/B spray pump seal water heat exchanger shell side out ft low side manifold, manifold replaced. i
- 5. HX-3 A/B shell side FI-601 outlet high side root valve, valve replaced.
- 6. P-002B charging pump, nipple repaired. l i
l l
l l
i i
I
OPERATING DATA REPORT DOCKET NO. 50-266 .
DATE: 06/05/96 COMPLETED BY: B. J. Vander Velde .
TELEPHONE: 414-755-6681 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2 - '
NOTES
- 2. REPORTING PERIOD: May - 1996 .
- 3. LICENSED THERMAL POWER (MWT): 1518.5 .
- 4. NAMEPLATE RATING (GROSS MWE): 523.8 .
- 5. DESIGN ELECTRICAL RATING (NET MWE):- 497.0 .
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0 .
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0 ............ ............ ............
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): Power 90%
- 10. REASONS FOR RESTRICTIONS, (IF ANY):
- Self-imposed restriction because of SG tube plugging, pending further evaluation.
THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744.0 3,647.0 208,920.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 728.5 3,631.5 182,958.6
- 13. REACTOR RESERVE SHUTDOWN HOURS O.0 0.0 233.9
- 14. HOURS GENERATOR ON LINE 724.9 3,627.9 180,482.3
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 982,095.0 4,948,129.0 259,480,282.0
- 17. GROSS ELECTRICAL ENERGY GENERATED 336,510.0 1,696,900.0 88,200,160.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 320.011.0 1,617,697.0 84,082,346.5
- 19. UNIT SERVICE FACTOR 97.4 % 99.5 % 86.4 %
- 20. UNIT AVAILABILITY FACTOR 97.4 % 99.5 % 86.5 %
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 88.7 % 91.5 % 82.4 %
- 22. UNIT CAPACITY FACTOR (USING DER NET) 86.5 % 89.2 % 81.0 %
- 23. UNIT FORCED OUTAGE RATE 2.6% 0.5% 0.9%
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EAC"h ,
Refueling /SGRP, 10/05/96, 70 days
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22,1977 f
- r i POINT BEACH NUCLEAR PLANT DOCKET NO. 50-301 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach, Unit 2 MONTH MAY- 1996 DATE 6/4/96 COMPLETED BY B. J. Vander Velde i~
TELEPHONE 414/682-5168 AVERAGE AVERAGE AVERAGE l DAILY DAILY DAILY '
POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 445 11 448 21 447 2 444 12 448 22 447 '
i 3 444 13 448 23 449 4 445 14 446 24 446 5 446 15 446 25 448 i 6 446 16 446 26 447 7 446 17 446 27 447 :
1 l
8 446 18 206 28 448 9 446 19 178 29 446 j 10 448 20 448 30 447 -
31 448 f
- POINT BEACH NUCLEAR PLANT Docket No. 50-301 -
Unit Name Point Beach. Unit 2
. UNIT SHUTDOWNS AND POWER REDUCTIONS Date 6/5/96 Completed By B. J. Vander Velde **
REPORT MONTH MAY - 1996 Telephone No. 414/755-6681 Method of Licensec Evers Duration Reactor Report No. Syssem Component Cause and Cometive Action ,
No. Date Type' (Hours) Reasoe* Shut Down' Code
- Code s
To Prevent Recumace 1 5/18/96 F 19.1 H 3 301/96-001 HE V/LVEX T' mine trip occumd causing a reactor trip fan turbine stop valve closure. All saf:ty related equipment functioned as designed. ha main turbine evnergency trip EH fluid solenoid valve (20ET) was replaced. Investigation of the root cause is in progress.
~ 'F: Forced ' Reason: ' Method: ' Exhibit G - Instructions S: Scheduled A - Equipernt Failure (explain) 1 - Manual for pteparation of B - Maintenance or Terting 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic fcram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continus4a of E - Operator Training & Previous Shutdown Licensing Exam 5 - Reduced load F- Administrative 6 - Other (explain) Txhibit I- Same Source G - Operational Enor (explain)
H - Other (explain)
PBF-0(n8b (03-50)
I[
DOCKET NO. 50-301 UNIT NAME Point Beach Unit 2 DATE 6/5/96 COMPLETED BY B. J. Vander Velde TELEPHONE 414/755-6681 Unit 2 operated at an average of 430 MWe net for the May,1996 report period.
Safety-related maintenance included:
- 1. 2P2C controller cabinet, cooling fan installed.
- 2. P-001 A-M reactor coolant pump motor, oil added.
s I
.