Application for Amend to License NPF-5,proposing Tech Spec Changes to Reflect Implementation of TMI Action Plan Item II.K.3.22, RCIC Suction Automatic Transfer, as Required by Generic Ltr 83-02
ML20076K705
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 09/09/1983
From: Causey J
GEORGIA POWER CO.
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML20076K711 List:
References
RTR-NUREG-0737, TASK-2.K.3.22, TASK-TM GL-83-02, NED-83-413, TAC-51680, TAC-51681, TAC-52640, NUDOCS 8309150240
Download: ML20076K705 (2)


Text

1

, Goorg.a Power Company 333 P:edmont Aanae

, Atwta. Geo<g a 30308 Telephone 404 526 7895 Mawg Address Post ott:ce Box 4545 Atlanta. Gerg a 30302 h Georgia Power J.c.causey v.ce Prea*m NED-83-413 FossJ and H,to Generatan September 9, 1983 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operatirg Reactors Branch No. 4 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555 NRC DOCKET 50-366 OPERATING LICENSE NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNIT 2 REQUEST TO AMEND TECHNICAL SPECIFICATIONS Gentlemen:

By your letter of January 10,1983 (Generic Letter 83-02), Georgia Power Conpany (GPC) was requested to propose Technical Specification changes to reflect the implementation of certain DiI Action Plan items. Items in that letter which were not yet implemented were requested to be addressed at the time of their completion. In our response dated April 22, 1983, appropriate changes were proposed for all of the items addressed in Generic Intter 83-02 with the exception of Item II.K.3.22 (RCIC Suction Automatic Transfer) for Hatch Unit 2. 'Itat item was not implemented at the time of our subnittal but has recently been completed.

In accordance with the provisions of 10 CFR 50.90 as required by 10 CFR 50.59 (c) (1) , GPC proposes to amend Plant Hatch Unit 2 'Ibchnical Specifications (Appendix A to Operating License NPF-5) to reflect the implementation of Item II.K.3.22. Pursuant to 10 CFR 50.92, J. L. Iedbetter of the Georgia Department of Natural Resources will be sent a copy of this subnittal. The proposed change would add operability requirements for the

-automatic suction transfer to the RCIC system operability criteria. In addition, the Condensate Storage Tank level switches (which transfer RCIC suction to the Suppression Pool on low level) and the Suppression Pool level switches (which transfer RCIC suction to the Suppression Pool on high level) would be added to the list of instrumentation which controls the RCIC system. Specific instructions for incorporation of the change and the proposed change are included as Enclosure 1.

8309150240 830909 Oh ul 0 PDR ADOCK 05000366 p PDR k i\

=

Georgia Power d Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 Septanber 9,1983 Page Two The proposed change has been reviewed and approved by the Plant Review Board and the Safety Review Board and has been determined not to constitute an unreviewed safety question. The probability of occurrence and the consequences of an accident or malfunction of equipnent important to safety would not be increased above those analyzed in the FSAR because the operation of safety-related equipnent is not affected by the proposed change. The possibility of an accident or malfunction of a different type than any analyzed in the FSAR would not result from this change because no new mode of failure is introduced. %e margin of safety as defined in the basis for any Technical Specification would not be reduced by this change because operation of the plant would remain within previously analyzed limits. %e proposed change has been evaluated and determined not to involve significant hazards considerations. This evaluation is documented in Enclosure 2.

A determination of amendment class is included as Enclosure 3. We have determined this to be a Class III amendment and have enclosed the appropriate payment. ,

l This sutrnittal completes GPC's response to Generic Letter 83-02. Please contact this office if there are any questions.

J. C. Causey states that he is a Vice President of Georgia Power Company and is authorized to execute this oath on behalf of Georgia Power Company arrl that to the best of his knowledge and belief the facts set forth in this letter are true.

GE0lGIA POWER COMPANY l

by , e M(:t m

'j C. Causey Sworn to nd subscribed ore me this 9th day of September, 1983.

Notary Public. Georgia, State at Large My Commission 6pires Sept. 20,1983 Notary Public JH/ym Enclosure xc: J. T. Beckham, Jr. l H. C. Nix, Jr.

Senior Resident Inspector l J. P. O'Reilly (tGC-Region II J. L. Ledbetter 700775