Text
_ _ _
l Attachment 2 Proposed Changes to Technical Specification Pages Unit 1 3/4.1-14 Unit 2 3/4.1-14 8402220516 840217 PDR ADOCK 05000348 P PDR
l REACTIVITY CONTROL SYSTEMS l
3/4.1.3 MOVABLE CONTROL ASSEhBLIES GROUP HEIGHT LIMITING CONDITION FOR OPERATION 3.1.3.1 All full length (shutdown and control) rods shall be OPERABLE and positioned within + 12 steps (indicated position) of their group step counter demani position.
APPLICABILITY: MODES 1* and 2*
ACTION:
- a. With one.or more full length rods inoperable due to being immovable as a result of excessive friction or mechanical interference or known to be untrippable, determine that the SHUTDOWN MARGIN requircnent of Specification 3.1.1.1 is satisfied within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />,
- b. With more than one full length rod misaligned from the group step counter demand position by more than 112 steps (indicated position), be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
- c. With more than one full length rod trippable but inoperable for greater than 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />, be in HOT STANDBY within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
- d. With one full length rod inoperable due to causes other than addressed by ACTION a, above, or misaligned from its group step l counter demand height by more than + 12 steps (indicated position),
POWER OPERATION may continue provided that within one hour either:
- 1. The rod is restored to OPERABLE status within the above alignment requirements, or
- 2. The remainder of the rods in the group with the inoperable rod are aligned to within + 12 steps of the inoperable rod within
( te hour while maintaining the rod sequence and insertion limits of Figures 3.1-1 and 3.1-2; the THERMAL POWER level shall be restricted pursuant to Spacification 3.1.3.6 during subsequent operation, or
- 3. The rod is declared inoperable and the SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied. POWER OPERATION may then continue provided that:
a) A reevaluation of each accident analysis of Table 3.1-1 is perfonned within 5 days; this reevalution shall confim that the previously analyzed results of these accidents remain valid for the duration of operation under these conditions.
- See Special Test Exceptions 3.10.2 and 3.10.3 FARLEY-UNIT 1 3/4 1-14 AMENDMENT N0.
l
- REACTIVITY CONTROL SYSTEMS 3/4.1.3 MOVABLE CONTROL ASSEMBLIES GROUP HEIGHT LIMITING CONDITION FOR OPERATION 3.1.3.1 All full length (shutdown and control) rods shall be OPERABLE and positioned within + 12 steps (indicated position) of their group step counter demani position.
APPLICABILITY: H0 DES 1* and 2*
ACTION:
- a. With one or more full length rods inoperable due to being immovable as a result of excessive friction or mechanical interference or known to be untrippable, determine that the SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
- b. With nore than one full length rod misaligned from the group step counter demand position by more than 112 steps (indicated position), be in H0T STANDBY within G hours.
- c. With more than one full length rod trippable but inoperable for greater than 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />, be in HOT STANDBY within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
- d. With one full length rod inoperable due to causes other than addressed by ACTION a, above, or misaligned from its group step counter demand height by more than + 12 steps (indicated position),
POWER OPERATION may continue provided that within one hour either:
- 1. The rod is restored to OPERABLE status within the above alignment requirements, or
- 2. The remainder of the rods in the group with the inoperable rod are aligned to within + 12 steps of the inoperable rod within one hour while maintaining the rod sequence and insertion limits of Figures 3.1-1 and 3.1-2; the THERMAL POWER level shall be restricted pursuant to Specification 3.1.3.6 during subsequent operation, or
- 3. The rod is declared inor-?rable and the SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied. POWER OPERATION may then continue provided that:
a) A reevaluation of each accident analysis of Table 3.1-1 is performed within 5 days; this reevalution shall confirm that the previously analyzed results of these accidents remain valid for the duration of operation under these conditions.
- See Special Test Exceptions 3.10.2 and 3.10.3 FARLEY-UNIT 2 3/4 1-14 AMENDMENT NO.