PECO ENERGY Sanatoga. PA 19464 0920 T.S.6.9.1.6 May 15, 1995 ,
7 Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 ;
i
Subject:
Limerick Generating Station Monthly Operating I f
Report For Units 1 and 2 Enclosed are the monthly operating reports for Limerick ;
Units 1 and 2 for the month of April 1995 forwarded pursuant to Technical Specification 6.9.1.6. j Very truly yours, ANV. -
J es A. Muntz i Director - Site Engineering ,
I drh l Enclosures i
cc: T. T. Martin, Administrator, Region I, USNRC l N. S. Perry, USNRC Senior Resident Inspector LGS ,
W. G. MacFarland, Vice President, LGS 8 9505190301 950430 -
PDR ADOCK 05000352
, R PDR
-)
i 3
Docket No. 50-352 Attachment to MontNy 1
Operating Report for
~
Apr51995 Limerick Generating Station Unit 1 AprN 1 through AprE 30,1995
- 1. Narrative Summary of Operating Exoorlences l J
Unit 1 began the month of AprH at a nominal 100% of rated thermal power (RTP).
On AprH 4,1995, at 1223 hours0.0142 days <br />0.34 hours <br />0.00202 weeks <br />4.653515e-4 months <br />, power was reduced to 97.5% RTP due to high turbine backpressure. Power was restored to 100% RTP at 1850 hours0.0214 days <br />0.514 hours <br />0.00306 weeks <br />7.03925e-4 months <br />.
On AprH 9,1995, at 0244 hours0.00282 days <br />0.0678 hours <br />4.034392e-4 weeks <br />9.2842e-5 months <br />, power was reduced to 92% RTP 'or main turbine valve testing.
Power was restored to 100% RTP at 0420 hours0.00486 days <br />0.117 hours <br />6.944444e-4 weeks <br />1.5981e-4 months <br />.
On AprH 9,1005, beginning at 1525 hours0.0177 days <br />0.424 hours <br />0.00252 weeks <br />5.802625e-4 months <br />, power was reduced a number of times due to high turbine backpressure, to a minimum of 96% RTP, Power was restored to 100% RTP at 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br />.
On AprH 11,1995, at 2105 hours0.0244 days <br />0.585 hours <br />0.00348 weeks <br />8.009525e-4 months <br />, power was reduced to 90% RTP in order to remove the 'C' low pressure feedwater hester string from service due to a drain cooler tube leak. Power was restored to 100% RTP at 0030 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> on AprH 12,1995.
On AprN 12,1995, beginning at 1700 hours0.0197 days <br />0.472 hours <br />0.00281 weeks <br />6.4685e-4 months <br />, power was reduced a number of times due to high j turbine backpressure, to a minimum of 90% RTP. Power was restored to 100% RTP at 2235 hours0.0259 days <br />0.621 hours <br />0.0037 weeks <br />8.504175e-4 months <br />.
On AprH 19,1995, beginning at 1130 hours0.0131 days <br />0.314 hours <br />0.00187 weeks <br />4.29965e-4 months <br />, power was reduced a number of times due to high j turbine backpressure, to a minimum of 88% RTP. Power was restored to 100% RTP at 0117 l hours on April 20,1995.
On Apri 22,1995, at 1220 hours0.0141 days <br />0.339 hours <br />0.00202 weeks <br />4.6421e-4 months <br />, power was reduced to 88% RTP due to high turbine backpressure. Power was restored to 100% RTP at 1535 hours0.0178 days <br />0.426 hours <br />0.00254 weeks <br />5.840675e-4 months <br />.
1
-I On AprR 24,1995, at 1935 hours0.0224 days <br />0.538 hours <br />0.0032 weeks <br />7.362675e-4 months <br />, the 'A' reactor feedpump tripped due to a faulty suction pressure switch. Both reactor recirculation pumps ranback por design, reactor pressure vessel level increased to 40 inches and retumed its normal 35 inches, and power stabitzed at 77%
RTP. The faulty pressure switch was replaced and power was restored to 100% RTP at 0750 1' hours on AprH 25,1995.
l On AprN 27,1995, at 1447 hours0.0167 days <br />0.402 hours <br />0.00239 weeks <br />5.505835e-4 months <br />, power was reduced to 95% RTP due to high turbine i backpressure. Power was restored to 100% RTP at 0017 hours1.967593e-4 days <br />0.00472 hours <br />2.810847e-5 weeks <br />6.4685e-6 months <br /> on AprH 28,1995.
Unit 1 ended this operating period at 100% of RTP.
- 11. Challenoes to Main Steam Safety Relief Valves l l: There were no challenges to the Main Steam Safety Relief Valves during the month of Apri. j l
.1
~
QVEROGE DOILV UNIT POWER LEUEL ' -e DOCKET NO. 50 - 352 ,
UNIT LIMERICK UNIT 1 DATE MAY 11 1995 COMPANY PECO ENERGY COMPANY DAVID R. HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3772 MONTH APRIL 1995 DAY AVERAGE OAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (MwE-NET) 1 1061 17 1036 2 1013 18 1024 3 1058 19 975 4 1044 20 1024 5 1066 21 1025 6 1062 22 1017 7 1054 23 1033 8 1062 24 992 9 1037 25 985 10 1054 26 1025 11 1042 27 1005 12 1008 28 1026 13 1029 29 1029 14 1037 30 1030 s 15 1033 16 1033 i
I l
l t
l
OPEROTING DOVQ REPORT
- DOCKET NO. 50 - 352 .
DATE MAY 11, 1995 COMPLETED BY PECO ENERGY COMPANY DAVID R. HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3772 OPERATING STATUS 1 UNIT NAME: LIMERICK UNIT 1 ( NOTES: THERE WAS 1 LOAD DROP
- 2. REPORTING PERIOD: APRIL. 1995 ' GREATER THAN 20% THIS MONTH
- 3. LICENSED THERMAL POWER (MwT): 3293 DUE TO A REACTOR FEEDPUMP TRIP 4 NAMEPLATE RATING (GROSS MwE): 1092
- 5. DESIGN ELECTRICAL RATING (NET MWE): 1055
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): lb92
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): Ib5b
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTIONS. IF ANY:
THIS MONTH VR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 719 2.879 81.023
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 719.0 2.859.5 66 967
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 14 HOURS GENERATOR ON-LINE 719.b 2.841.2 65.866.7
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2.349.718 9.305.436 203.621.974
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 766.2bb 3.b42.bbb bkI226.78b-
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 741.991 2.942.605 63.586.611
-= - ----...--..- ..-
PAGE 1 OF 2
, em<r ,6 . - - --y- ,---4-- ..e-- w w. .-w.s # , ,,w- wien , *-%-- .-s w v--r -- - , -a --.-.ew--*,--en.-..%d.-+wu---*
- = --- -------- - _ _--- - - - m_m_$
~;
OPERQTING DATO REPORT (CONTINUED) DOCKEY NO. 30 - 352 -
DATE MAY 11 1995 THIS MONTH VR-TO-DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 100.0 98.7 81.3
- 20. UNIT AVAILABILITY FACTOR 100.0 98.7 Rt.3
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 97.8 96.9 74.4
- 22. UNIT CAPACITY FACTOR (USING DER NET) 97.8 96.9 74.4
- 23. UNIT FORCED OUTAGE RATE O.0 1.3 4.1 24 5HUTDOWNS SCHEDULED OVER NEXT 6 MONTMS (TYPE. DATE. AND DURATION OF EACH):
A 4 DAY PLANNED OUTAGE IS SCHEDULED fos; May 7 1995 FOR BOP ISSUES: DRAIN COOLER HEPAIR AND CONDENSER CLEANING.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITV 12/19/84 12/22/84 INITIAL ELECTRICITY MID APRIL 85 4/13/85 COMMERCIAL OPERATION IST QTR 86 2/01/86 PAGE 2 OF 2
_ _ _ __ - ___-_.a
UNIT SNUTDOWNS CWD POWER REDUCTIONS DOCCIET NO. 50 - 3S2 "
UNIT NAME LIMERICK UNIT 1 DATE MAY 11 1995 REPORT MONTH APRIL, 1995 COMPLETED BY PECO ENERGY COMPANY DAVID R. HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3772 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO. DATE (1)L (HOURS) (2) REACTOR (3) REPORT * (4) (5) PREVENT RECURRENCE 55 950404 S 000.0 B 4 N/A HC HTEXCH REACTOR POWER WAS eZDUCED TO 97.5% DUE 4 TO HIGH TURBINE BACK PRESSURE. 4 56 950409 S 000.0 B 4 N/A HA VALVEX REACTOR POWER WAS REDUCED TC 92% FOR 4 MAIN TURBINE VALVE TESTING. 4 57 950409 5 000.0 B 4 N/A HC HTEXCH REACTOR POWER WAS REDUCED TO 96% DUE 4 TO HIGH TURBINE BACK PRESSURE. 4-58 950411 F 000.0 A 4 N/A HH HTEXCH REACTOR POWER WAS REDUCED TO 90% DUE TO 4 DRAIN COOLER TUBE LEAK. 4 59 950412 S 000.0 B 4 N/A HC HTEXCH REACTOR POWER WAS REDUCED TO 90% DUE TO 4 HIGH TURBINE BACK PRESSURE. 4 60 950419 S 000.0 B 4 N/A HC HTEXCH REACTOR POWER WAS REDUCED TO 88% DUE TO 4 HIGH TURBINE BACK PRESSURE. 4 61 950422 S 000.0 B 4 N/A HC HTEXCH REACTOR POWER WAS REDUCED TO 88% DUE TO 4 HIGH TURBINE BACK PRESSRE. 4 1
62 l 950424 F 000.0 A 4 N/A CM PUMPXX l REACTOR POWER WAS REDUCED TO 77% DUE TO 4 t
t (1) (2) (3) (4)
F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) ' FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION
- F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE i
i 2 m___ _ _u _ . _-__w w- -+ - _m _ . . ,n- . -..---+-w -
-= . r * - * . w w %v- . __ . s _m
x UNIT SHUTDOWNS AND POWER REDUCTIONS DOCCET NO. 50 - 352 -
, g UNIT NAME LIMERICK. UNIT-1 .,
-= - .. ,
DATE MAY 11 1995 7 REPORT MONTH APRIL. 1995 COMPLETED BY PECO ENERGY COMPANY DAVID R. HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) T18-3TT2 METHOD OF LICENSEE SYSTEM : COMPONENT CAUSE AND CORRECTIVE
'I - TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO. DATE (1). (HOURS)! (2) REACTOR (3) REPORT # (4) (5) PREVENT RECURRENCE
- REACTOR FEEDPUMP TRIP. 4 .
63 950427 5 000.0 8 4 N/A HC HTEXCH REACTOR POWER WAS REDUCED TO 95% DUE TO 4 +
i HIGH TURBINE BACM PRESSURE. 4 4 i t
i (1) (2) (3) (4)
F = FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS
- S - SCHEDULED A - EOUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE '
C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG-0181) .
E - OPERATOR TRAINING + LICENSE EXAMINATION !
F - ADMINISTRATIVE '(5) ;[
G - OPERATIONAL ERROR (EXPLAIN)
H- OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE i
1
'i i.
t
_ m m , - . . _ . . ~ . , , , ,, . ..w.u ...w ,,..m #w- . , , , - . ,, ,.-% .-+s -- .,,y.e-i~. v1me,. we -ce-.. s.. ,m., .r,e m . . . , . = _ _ _ _ _ _
m
~t' . l
. . l Docket No. 50-353 Attachment to Monthly .
Operating Report for Apr51995 Limerick Generating Station Unit 2 April 1 through AprH 30,1995
- 1. Narrative Summary of Operating Experiences ,
Unit 2 began the month of AprH at a nominal 100% of rated thermal power (RTP).
On AprH 2,1995, at 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />, power was reduced to 75% RTP for a control rod pattom adjustment and main turbine valve testing. Power was restored to 100% RTP at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br />. ,
On AprH 4,1995, beginning at 1330 hours0.0154 days <br />0.369 hours <br />0.0022 weeks <br />5.06065e-4 months <br />, power was reduced a number of times due to high turbine backpressure, to a minimum of 88% RTP. Power was restored to 100% RTP at 0040 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> on Apru 5,1995.
On AprH 9,1995, beginning at 1550 hours0.0179 days <br />0.431 hours <br />0.00256 weeks <br />5.89775e-4 months <br />, power was reduced a number of times due to high ,
turbine backpressure, to a minimum of 95% RTP. Power was restored to 100% RTP at 1800 !
hours. ,
On April 19,1995, beginning at 1635 hours0.0189 days <br />0.454 hours <br />0.0027 weeks <br />6.221175e-4 months <br />, power was reduced a number of times due to high turbine backpressure, to a minimum of 95% RTP. Power was restored to 100% RTP at 2237 hours0.0259 days <br />0.621 hours <br />0.0037 weeks <br />8.511785e-4 months <br />.
9 On AprH 22,1995, at 1310 hours0.0152 days <br />0.364 hours <br />0.00217 weeks <br />4.98455e-4 months <br />, power was reduced to 95% RTP due to high turbine backpressure. Power was restored to 100% RTP at 1443 hours0.0167 days <br />0.401 hours <br />0.00239 weeks <br />5.490615e-4 months <br />.
On AprH 29,1995, at 0455 hours0.00527 days <br />0.126 hours <br />7.523148e-4 weeks <br />1.731275e-4 months <br />, the 'B' motor-generator drrse motor breaker opened, resulting in the trip of the 'B' reactor recirculation pump. The cause of this trip was due to a low lube ou pressure trip. Power was reduced, per procedure, and power was stabuized at 27% RTP. Lube oH pressure was increased and the motor generator set was started. Power was restored to 100% RTP at 0026 hours3.009259e-4 days <br />0.00722 hours <br />4.298942e-5 weeks <br />9.893e-6 months <br /> on AprH 30,1995.
On AprH 30,1995, at 2011 hours0.0233 days <br />0.559 hours <br />0.00333 weeks <br />7.651855e-4 months <br />, power was reduced to 91% for a control rod pattem adjustment. Power was restored to 100% RTP at 2355 hours0.0273 days <br />0.654 hours <br />0.00389 weeks <br />8.960775e-4 months <br />. :
Unit 2 ended this operating period at 100% of RTP.
- 11. Challenges to Main Steam Safety Relief Valves There were no challenges to the Main Steam Safety Relief Valves during the month of Aprl.
i
\
l
1 AVERACE DOILY UNIT PODER LEVEL -
DOCKET NO. 50 - 353
- UNIT LIMERICK UNIT 2 DATE MAY 11, 1995 COMPANY PECO ENERGY COMPANY
.-~~-.
DAVID R. HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3772 MONTH APRIL 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 1133 17 1126 2 1031 18 1114 3 1129 19 1106 4 1080 20 1131 5 1133 21 1102 6 1132 22 1114 7 1120 23 1123 8 1128 24 1122 9 1112 25 1122 10 1130 26 1118 11 1130 27 1110 12 1118 28 1118 13 1126 29 617 14 1122 30 1113 15 1126 16 1122
. - - - -. .. . > > wu .., .
3 v -1..
I OPERATING DQVO REPORT
, 6 i . .
DOCKET NO. 50 - 353 .
DATE MAY 11 1995 COMPLETED BY PECO ENERGY COMPANY .
DAVID R. HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION.
, TELEPHONE (610) 718-3772 OPERATING STATUS
- 1. UNIT NAME: LIMERICK UNIT 2 NOTES: THERE WERE 2 LOAD DROPS 4
- 2. REPORTING PERIOD: APRIL. 1995 GREATER THAN 20% THIS MONTH'
- 3. LICENSED THERMAL POWER (MwT): '
, 3458 DUE TO ROD PATTERN ADJUSTMENT 4 NAMEPLATE RATING (GROSS MWE): 1163 AND REACTOR RECIRCULATION 1 '
- 5. DESIGN ELECTRICAL RATING (NET MWE): 11 -PUMP TRIP. t
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MwE): 1155 "f
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MwE): 1115 i 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS -
- 9. POWER LEVEL TO wHICH RESTRICTED, IF ANY (NET MWE):
{
- 10. REASONS FOR RESTRICTIONS. IF ANY:
'i
, THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 719 -2.879 46.535 .;
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 719.0- 2.359.4 41.722.4 *
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 -r
- 14. HOURS GENERATOR ON-LINE 719.b 2 h51.8 ' 40.856.7
- 15. UNIT RESERVE SHUTDOWN HOURS OO OO O.0
--- = >
i
- 16. GROSS THERMAL ENERGY GENERATED (MwH) 2.446.284 6.508.539 128.738,122
- 17. GROSS ELECTRICAL ENERGY GENERATED (MwH) 817.700 - 2.159.900 42.543.480-
- 18. NET ELECTRICAL ENERGY GENERATED (MwH) 792.169 2.081.386 40.983.586.
PAGE 1 OF 2 a 1
L
_ . _ _ m ._4__.s.___a_a___m _._:n.m_.__--__..--,.___-_.m .a-m_-_ _ _ _ _ _ _ _ _ _ _ - _ _ _ - - _____________m_$_s- '
_ _ 7 p ye 4 ..% y e 'ytv ww w-y+ . ygw -
b OPERATING DATA REPORT (CONTINUED) DOCKEV NO. 50 - 333 -
T
.eee_-- _--:
DATE MAY 11, 1995
__._._..._..._ _ - = ..
THIS MONTH YR-TO-DATE CUMULATIVE
{
- 19. UNIT SERVICE FACTOR 100.0 78.2 87.8 l _-__ _. _... _-.._-_._-__ ___.____-_--
- 20. UNIT AVAILABILITY FACTOR 100.0 78.2 87.8
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 98.8 65.5 83.3
- 22. UNIT CAPACITY FACTOR (USING DER NET) 98.8 65.5 83.3
- 23. UNIT FORCED OUTAGE RATE O.0 3.4 3.5 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 08/12/89 08/12/89 INITIAL ELECTRICITY 09/01/89 09/01/89 COMMERCIAL OPERATION 02/01/90 01/08/90 PAGE 2 OF 2
y
+
2
, . 3 UNIT SHUTDOWNS sMD POWER REDUCTIONS DOCKET NO. 50 - 353 **
i UNIT NAME LIMERICK UNIT 2 DATE MAY 11 1995 REPORT WONTH APRIL. 1995 COMPLETED BV PECO ENERGY COMPANY DAVID R. HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3772 METHOD OF LICENSEE SYSTEM COMPONENT ' CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE COOE ACTION TO j NO. DATE (1)! (HOURS) (2) REACTOR (3) REPORT * (4) (5) PREVENT RECURRENCE 42 950402 S 000.0 B 4 N/A RB CONROD REACTOR POWER WAS REDUCED TO 75% DUE TO 4 CONTROL ROD PATTERN ADJUSTMENT AND MAIN 4
, TURBINE VALVE TESTING. 4 i 43 950404 S 000.0 B 4 N/A HC HTEXCH REACTOR POWER WAS REDUCED TO 88% DUE TO 4 HIGH TURBINE BACK PRESSURE. 4 44 950409 5 000.0 B- 4 N/A HC HTEXCH REACTOR POWER WAS REDUCED TO 95% DUE TO 4 HIGH TURBINE BACK PRESSURE. 4 45 950419 5 000.0 8 4 N/A HC HTEXCH REACTOR POWER WAS REDUCED TO 95% DUE TO 4 HIGH TURBINE BACK PRESSURE. 4 43 950422 S 000.0 B 4 N/A HC HTEXCH REACTOR POWER WAS REDUCED TO 95% DUE TO 4 HIGH TURBINE BACK PRESSURE. 4 47 950429 F 000.0 A 4 N/A CB PUMPXX REACTOR POWER WAS REDUCED TO 27% DUE TO 4 REACTOR RECIRC PUMP TRIP. 4 48 950430 S 000.0 B 4 N/A RB CONROD P ".* CTOR POWER WAS REDUCED TO 91% OUE TO 4 CONTROL ROD PATTERN ADJUSTMENT. 4 1 4 t
(1) (2) (3) (4)
F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE