Compilation of Incidents or Occurrences from 761013 to 761207
ML20086B904
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 10/13/1976
From:
VERMONT YANKEE NUCLEAR POWER CORP.
To:
Shared Package
ML20086B899 List:
References
NUDOCS 8311220046
Download: ML20086B904 (2)


Text

- - . - . . - - - . . . . . . . - .. . .. .;- - . . = . . . . . . ._

l Oo O . ._

FILE #5 50-271

  • PAGE 5 Docket Nue.ber '

Incidents or Occurrences VERMONT YANKEE .

Plant Name VERMONT YANKEE NUCLEAR POWER CORPORATION 40 I Date Description 271/74 OCCUR DTD WITH THE PLANT AT STEADY STATE POWER, CONTROL ROOM PERSONNEL RECEIVED A "UPS-1B 37 10/13/76 TROUBLE ALARM.

I 271/76 .

e g a g h

e 7 E e e e .

O g .

S e

= e l

6 4

l 8311220046 780405 PDR ADOCK 05000271 S PDR 1

e e

_ _ __.___.._.... _ .. ..._.___.__-._._._.a 1

bo O ..

FILE !/5 PAGE 6 50-271 ,

Docket Number .

" "8 # "*"

VERMONT YANKEE "'_,-

Plant Name

b. Date Description 271/ With the plant at steady state _ power, Control Room personnel were performing 76/ 11/18/76 r utine RHR MOV operability testing on the RHR-27E valve when UPS-1B tripped.

43 271/ During MSIV partial , closure surveillance testing, RPS relay 5A-K3f deenergized 76/

11/21/76 normally, but then . reset while the operator was still closing MSIV 2-80C.

44 .

77 11/23/76 .

At approximately 0755 on 11/23/76, the containment air sampling pump motor was ,

determined t9 be inoperable because it failed co htart after.it was automati-  ;

45 cally tripped during primary containment isolatio,n valve surveillance testing. ,

~ 7 During normal plant operation, Control Room personnel reported a. loss of voltage

! 11/29/76 , to Motor Control Center 89B. The loss of voltage .to MCC-89B causes the iopera- -

bility of the "B" LPCL subsystem.

271/ 11/30/76 While pecorming the quarterly Reactor Low Pressure-*ECCS Valve Permissive  :

76/ Functional Test (o.P 4340), it was discove' red that Switch No.1 of PS2-3-52D 47 did not actuate at its prescribed Tech. Spec. limit of 300 psig. When pressure was reapplied to the switch and again reduced, the switch actuated as required.

l MEMOS - REQUESTED TRANSFER OF LEAD RESPONSIBILITY ON HYDRAULIC SHOCK SUPPRESOR OPERABILITY CRITERIA, AND INFORMATION RELATIVE TO COMPLIANCE WITH TECH SPECS FOR OPERABILITY.0F HYD'RAULIC SNUBBERS. DTD OCT. 15, 1976-l l

271/ 12/7/76 CONTROL R000M PERSONNEL REPORTED THE TORUS PRESSURE INDICATION ON RECORDER 76/ PR-16-19-44 REPORTED TO BE INOPERABLE.

48 I

I i

L sg1 a 74 -9't'

~

'