ML20086B890

From kanterella
Jump to navigation Jump to search
Compilation of Incidents or Occurrences from 750702 to 760629
ML20086B890
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 06/29/1976
From:
VERMONT YANKEE NUCLEAR POWER CORP.
To:
References
NUDOCS 8311220036
Download: ML20086B890 (5)


Text

K Pg. 5 G

FIL2 #4 h

50-271 D ckst Number cMents or Occunences VERMONT YANKEE Picat Name io.

Date Description t

R0 EVENT DURING SURVEILLANCE TESTING OF THE HIGH SUPPRESSION CHAMBER WATER LEVEL SWITCH 76-14 DATE IT WAS FOUND THAT LEVEL SWITCH 23-91A WOULD NOT ACTUATE AT ITS TECH SPEC.

5/19/76 RO EVENT WHILE PERFORMING WEEKLY SURVEILLANCE ON THE STACK CHARCOAL CARTRIDGE AND THE 76-15 DATE STAC PARTICULATE FILTER, A CHEMISTRY AND HEALTH PHYSICS TECHNICIAN INADVERTENTLY 5/25/76 SECURED BOTH PLANT STACK MONITORING SYSTEMS CONCURRENTLY.

PN EVENT BOMB THREAT.

22 DATE 6/4/76 7

s PN EVENT ORGANIZED DEMONSTRATION AT VERMONT YANKEF.

23 DATE '

6/4/76 RO EVENT DURING SURVEILLANCE TESTING OF THE HIGH SUPPRESSION CHAMBER WATER LEVEL SWITQH 76-10 DATE IT WAS FOUND THAT LEVEL SWITH 23-91A WOULD NOT ACTUATE AT ITS TECH. SPEC. TRIP 6/14/76 LEVEL SETTING OF 6 A INCHES.

lRO EVENT WHILE OPERATING AT A STEADY STATE POWER LEVEL OF 887., A STATION OPERATOR INAD-l 7 6-l'/

DATE VERTENLY DRAINED THE REFERENCE LEG OF A LEVEL INSTRUMENT WHICH IS PART OF THE 6/16/76 REACTOR VESSEL WATER LEVEL OCNIROL SYSTEM.

1 1

l RO EVENT WHILE PERFORMING SRM RESPONSE CHECKS IN ACCORDANCE WITH TECH. SPEC. 4.'12.B, THE 76-1F DATE CONTROL ROD BLOCK ASSOCIATED WITH THE "0NE CONTROL ROD WITHDRAWAL PERMIT CIRCUIT" 6/29/76 WAS FOUND TO BE INOPERABLE ~.

l 0311220036 760629 PDR ADOCK 05000271 S

PDR n

Pg. 4

~

FILE #4 I

)

50-271 Dockat Number

{

Incidents or Occurrences i

VERMONT YANKEE P1:nt Name No.

Date Description RO EVENT CONTROL ROOM OPERATOR OBSERVED A FLOW FAULT ALARMS FULL CLOSED INDICATION ON 76-7 DATE VALVE V-75-C1, AND LOSS OF POWER INDICATION ON THE CONTAINMENT AIR SAMPLING 3/2/76 (CAS) SYSTEM.

1 RO EVENT THE "A"

PCI SUBSYSTEM WAS DECLARED INOPERABLE AND THE ALTERNATE TESTING DEFINED l 76-8 DATE BY TECH. SPEC.

4/15/76 O

RO EVENT LEVEL SWITCH LS23-74 ASSOCIATED WITH THE LOW CST /HPCI SUCTION VALVE SWITCH CIR-76-9 DATE CUIT FAILED TO ACTUATE AT ITS REQUIRED SETPOINT.

~

4/21/76 f

Rd EVENT PRIOR TO AN IMPEDNDING ELECTRICAL STORM, REACTOR OPERATORS ATTEMPTED TO START, 76-10 DATE "B" DIESEL GENERATOR FROM THE CONTROL ROOM. WITHIN ONE MINUTE, THE UNIT TRIPPED 5/6/76 ON HIH CRANKCASE PRESSURE.

O RO EVENT THE RHR 27A & B VALVES WOULD NOT COMPLETELY OBTAIN THEIR' REQUIRED OPEN POSITION 76-11 DATE FROM THEIR NORMALLY CLOSED POSITION.

5/10/76 RO EVENT WHILE PERFORMING.THE MONTHLY HPCI SYSTEM PUMP OPERABILITY SURVEILLANCE TEST, 76-12 DATE THE HEAD GASKET ON THE GLAND SEAL CPONDENSER FAILED.

5/12/76 RO EVENT DURING THE PERFORMANCE OF 0.P. 4363, HPCI/ CONDENSATE STORAGE TANK LEVEL SWITCH 76-13 DATE FUNCTIONAL SURVEILLANCE TEST, IT WAS DETERMINED THAT LS 23-74 WOULD NOT ACTUATE 5/19/76 AT ITS REQUIRED SETPOINT OF 14 3/8 INCHES ABOVE TANK BOTTOM.

g,__3 -

FILE #4 O

(N1 b

50-271 Drcket Number Incidents or Occurrences VERMONT YANKEE

~.

Plant Name Ns.

Date Description A0 EVENT WHILE PERFORMING MONTHLY LPCI PUMP AND MOTOR OPERATED VALVE OPERABILITY SUR-75-24 DATE VEILLANCE TESTING, LPCI INJECTION VALVE V-10-25A FAILED TO RESPOND TO AN OPEN 12/12/75 SIGNAL GENERATED FROM IT REMOTE CONTROL SWITCH.

I R0 EVENT DURING PLANT STARTUP, BOTH CHANNELS OF THE AEOG RADIATION MGNITORS WERE DISCOV-76-1 DATE ERED TO BE READIN6 ABNORMALLY LOW DUE TO A PURGE VALVE BEING STUCK IN THE OPEN 1/18/76 POSITION.

RO EVENT A PLANT SHUTDOWN WAS INITIATED VOLUNTARILY AS A SAFETY PRECAUTION BEGINNING AT 76-2 DATE 2019 ON 1/26/76, WITH THE REACTOR BEING ON SHUTDOWN COOLING-AT 0336 ON 1/27/73.

1/26/76 R0 EVENT AT APPROXIMATAELY 0420 on 2/14/76, CONTROL ROOM PERSONNEL OBSERVED A FLOW FAULT 76-4 DATE ALARM AND LOSS OF POWER INDICATION ON THE SAMPLE PUMP ASSOCIATED WITH THE CON-2/14/76 TAINMENT AIK SAMPLING SYSTEM.

R0 EVENT SUBSEQUENT TO A REACTOR STARTUP, IT WAS DISCOVERED THAT A PORTION OE A PROCEDUR[a 76-5' DATE ASSOCIATED WITH SECURING FROM THE SHUTDOWN COOLING MODE OF OPERATION WAS NOT 2/17/76 PERFORMED.

R0 EVENT 10F THE 4 LOW-LOW WATER LEVEL SWITCHES ASSOCIATED WITH THE DIFFERENTIAL PRESi-76-6 DATE SURE INDICATING SENSOR 2-3-72A ACTUATED AT A VALUE LESS'iTHAN MINUS 50" 0F WATERc 2/25/76

+-

(

rs. 6 O:

FILE #4

~

50-271 D:cket Number Incidents or Occurrences VERMONT YANKEE Plent Name l

Eo.

Date Description PN-52 EVENT DURING A DRYWELL INSPECTUIB THE THE REACTOR AT OPERATING TEMPERATURE AND PRESSUR$

DATE LEAKAGE WAS NOTED FROM A RECIRC LOOP RISER 1-INCH INSTRUMENT LINE.

)

8/27/75 l

A0 EVENT DRUING ROUTINE SURVEILLANCE ON Tile RCIC SYSTEM, STEAM SUPPLY ISOLATION VALVE-75-18 DATE 13-15 WOULD NOT FULLY CLOSE.

9/1/75 9-A0 EVENT WHILE PERFORMING A ROUTINE SURVEILLANCE TEST, IT WAS DISCOVERED THAT THREE 75-19 DATE OF THE FOUR FIRST! STAGE TURBINE SCRAM BYPASS SWITCilES (5-14A, B AND C) ACTUA,TED 9/11/75 AT SET POINTS OF 231.'7, 229.7 AND 224.7 PSIA SESPECTIVELY.

A0 EVENT DURING SURVEILLANCE TEST, RPS RELAY 5A-K3A FAILED TO DEENERGIZE UPON PARTIAL 75-20 DATE CLOSURE OF MSIV 2-86A.

9/27/75 A0 EVENT DURING A REVIEW OF SURVEILLANCE RECORDS BY A CHEM & HP SUPERCISOR, UT BECAME, 75-21 DATE APPARENT TilAT A TECH. PEC. SURVEILLANCE (4.6.B.1.b) REQUIRING A ISOTOPIC 10/7/75 ANALYSIS OF A REACTOR COOLANT SAMPLE HAD BEEN INADVERTENTLY SIGNED OFF FOR THE MONTil 0F AUGUST.

A0 EVENT DURING Tile PERFORMANCE OF THE STARTUP TRANSFORMER LOADING TEST, TP75-04, WITH 75-22 DATE Ti!E PLANT IN A COLD SHUTDOWN CONDITION RHR VALVE 10-25B OPEN IN RESPONE TO THE 11/9/75 TEST INITIATED AUTO-OPEN SIGNAL.

l A0 EVENT AT APPROXIMATELY 08300 ON 12/4/75, CONTROL ROOM PERSONNEL OBSERVED A FLOW 75-23 DATE FAULT ALARM LOSS OF POWER INDICATION ON THE SAMPLE PUMP ASSOCIATED WITil THE 12/4/75 CONTAINMENT AIR SAMPLING SYSTEM.

e.

=

_, ~..... _.

50-271 D;cket Number Incidents or Occurrences

~

77 Picnt Name i

p.

Date Description PN-33 EVENT SPILL OF SODIUM HYPOCHLORITE INTO CONNECTICUT RIVER AND FISH KILL.

DATE 7/2/75 A0 EVENT WHILE PERFORMING ROUTINE SURVEILLANCE TESTING ON THE CORE SPRAY SYSTEM, INJECTION 76-13 DATE VALVE CS-11B FAILED 10 OPEN WHEN THE CONTROL SWITCH WAS PLACED IN THE OPEN 7/7/75 POSITION.

A0 EVENT WHILE PERFORMING THE MONTHLY HPCI SYSTEM PUMP OPERABILITY SURVEILLANCE TEST, THE 75-14 DATE HEAD GASKET ON THE CLAND SEAL EXHAUST CONDENSER' FAILED.

7/25/75 f

8 1

A0 EVENT DURING NORMAL OPERATION-AND. PLANT INSPECTION TOUR, VAPQR WAS OBSERVED LEAKING 75-15 DATE FROM A0G DRAIN TANK PIT HATCH COVER.

7/3/75.'

A0 EVENT DURING A ROUTINE NRC INSPECTION, THE INSPECTOR DISCOVERED THA THE ECCS LOW-LOW 75-16 DATE RX WATER LEVEL. INSTRUMENT 2-3-72C SETPOINI WAS.i8 INCHES BELOW THE TECH. SPEC.:

7/24/75

~

PN-4L EVENT ANTI-NUCLEAR DEMONSTRATION.

DATE 8/6/75 A0 EVENT WHILE PERFORMING AN INSPECTION ONITHE DRYWELL, A SMALL STEAM LEAK WAS OBSERVED 75-1; DATE ON A ONE INCH INSTRUMENT LINE THAT IS CONNECTED TO THE EXTERNAL PORTION OF ONE 8/27/75 JET PUMP INLET RISER.

m