ML20086B904

From kanterella
Jump to navigation Jump to search
Compilation of Incidents or Occurrences from 761013 to 761207
ML20086B904
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 10/13/1976
From:
VERMONT YANKEE NUCLEAR POWER CORP.
To:
Shared Package
ML20086B899 List:
References
NUDOCS 8311220046
Download: ML20086B904 (2)


Text

-

...;- -.. =......._

l Oo O

FILE #5 50-271 PAGE 5 Docket Nue.ber Incidents or Occurrences VERMONT YANKEE Plant Name VERMONT YANKEE NUCLEAR POWER CORPORATION 40 Date Description I

271/74 OCCUR DTD WITH THE PLANT AT STEADY STATE POWER, CONTROL ROOM PERSONNEL RECEIVED A "UPS-1B 37 10/13/76 TROUBLE ALARM.

I 271/76 e

g h

g a

e 7

E e

e e

O g.

S e

=

e l

6 4

l 8311220046 780405 PDR ADOCK 05000271 S

PDR 1

e e

..._.___.__-._._._.a 1

bo O

FILE !/5 PAGE 6 50-271 Docket Number "8

VERMONT YANKEE Plant Name b.

Date Description 271/

With the plant at steady state _ power, Control Room personnel were performing 76/ 11/18/76 r utine RHR MOV operability testing on the RHR-27E valve when UPS-1B tripped.

43 271/

During MSIV partial, closure surveillance testing, RPS relay 5A-K3f deenergized 11/21/76 76/

normally, but then. reset while the operator was still closing MSIV 2-80C.

44 77 At approximately 0755 on 11/23/76, the containment air sampling pump motor was,

11/23/76 determined t9 be inoperable because it failed co htart after.it was automati-45 cally tripped during primary containment isolatio,n valve surveillance testing.

7 During normal plant operation, Control Room personnel reported a. loss of voltage

~

to Motor Control Center 89B. The loss of voltage.to MCC-89B causes the iopera- -

11/29/76 bility of the "B" LPCL subsystem.

271/

11/30/76 While pecorming the quarterly Reactor Low Pressure-*ECCS Valve Permissive 76/

Functional Test (o.P 4340), it was discove' red that Switch No.1 of PS2-3-52D 47 did not actuate at its prescribed Tech. Spec. limit of 300 psig. When pressure was reapplied to the switch and again reduced, the switch actuated as required.

l MEMOS - REQUESTED TRANSFER OF LEAD RESPONSIBILITY ON HYDRAULIC SHOCK SUPPRESOR OPERABILITY CRITERIA, AND INFORMATION RELATIVE TO COMPLIANCE WITH TECH SPECS FOR OPERABILITY.0F HYD'RAULIC SNUBBERS. DTD OCT. 15, 1976-l l

271/

12/7/76 CONTROL R000M PERSONNEL REPORTED THE TORUS PRESSURE INDICATION ON RECORDER 76/

PR-16-19-44 REPORTED TO BE INOPERABLE.

48 I

I i

L sg1 74 -9't'

~

a

-