FILE #5 50-271
- PAGE 5 Docket Nue.ber '
Incidents or Occurrences VERMONT YANKEE .
Plant Name VERMONT YANKEE NUCLEAR POWER CORPORATION 40 I Date Description 271/74 OCCUR DTD WITH THE PLANT AT STEADY STATE POWER, CONTROL ROOM PERSONNEL RECEIVED A "UPS-1B 37 10/13/76 TROUBLE ALARM.
I 271/76 .
e g a g h
e 7 E e e e .
O g .
S e
= e l
6 4
l 8311220046 780405 PDR ADOCK 05000271 S PDR 1
e e
_ _ __.___.._.... _ .. ..._.___.__-._._._.a 1
bo O ..
FILE !/5 PAGE 6 50-271 ,
Docket Number .
" "8 # "*"
VERMONT YANKEE "'_,-
Plant Name
- b. Date Description 271/ With the plant at steady state _ power, Control Room personnel were performing 76/ 11/18/76 r utine RHR MOV operability testing on the RHR-27E valve when UPS-1B tripped.
43 271/ During MSIV partial , closure surveillance testing, RPS relay 5A-K3f deenergized 76/
11/21/76 normally, but then . reset while the operator was still closing MSIV 2-80C.
44 .
77 11/23/76 .
At approximately 0755 on 11/23/76, the containment air sampling pump motor was ,
determined t9 be inoperable because it failed co htart after.it was automati- ;
45 cally tripped during primary containment isolatio,n valve surveillance testing. ,
~ 7 During normal plant operation, Control Room personnel reported a. loss of voltage
! 11/29/76 , to Motor Control Center 89B. The loss of voltage .to MCC-89B causes the iopera- -
bility of the "B" LPCL subsystem.
271/ 11/30/76 While pecorming the quarterly Reactor Low Pressure-*ECCS Valve Permissive :
76/ Functional Test (o.P 4340), it was discove' red that Switch No.1 of PS2-3-52D 47 did not actuate at its prescribed Tech. Spec. limit of 300 psig. When pressure was reapplied to the switch and again reduced, the switch actuated as required.
l MEMOS - REQUESTED TRANSFER OF LEAD RESPONSIBILITY ON HYDRAULIC SHOCK SUPPRESOR OPERABILITY CRITERIA, AND INFORMATION RELATIVE TO COMPLIANCE WITH TECH SPECS FOR OPERABILITY.0F HYD'RAULIC SNUBBERS. DTD OCT. 15, 1976-l l
271/ 12/7/76 CONTROL R000M PERSONNEL REPORTED THE TORUS PRESSURE INDICATION ON RECORDER 76/ PR-16-19-44 REPORTED TO BE INOPERABLE.
48 I
I i
L sg1 a 74 -9't'
~
'