ML030070208

From kanterella
Revision as of 04:01, 26 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Summary Report - Ncrs Initiated Since 03/27/2002
ML030070208
Person / Time
Site: Crystal River 
Issue date: 04/03/2002
From:
- No Known Affiliation
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2003-0059
Download: ML030070208 (1)


Text

CR3 For Information Only.

Crystal River Nuclear Facility Summary Report - NCRs Initiated Since 3127102 Sorted by Origination Date, Ar Number, Priority Selection Cnteria. AR Type = NCR and AR Status not = Canceled with Attribute of 1A POTL OPER/REPORT AR Subject Orig. Date AR Status Priority Potential Oper/Report NCR Owner AR# Originator WBSB-2 QUICK CONNECTS WILL NOT 20020401 APPROVED 2 N CR3 MAINTENANCE 00058555 PAUL GILMAN ENGAGE UNIT EVALUATOR GROUP QUICK CONNECTS. THIS EQIP MENT IS WHILE PERFORMING STEP 4.1.5 OF PT-160A, THE CHEMISTRY TECH WAS UNABLE TO ENGAGE THE WSSB-2 0737 AND REGULATORY GUIDE 1. 97 COMMITMENTS FOR PASS. W/R 44398 WRITTEN.

REQUIRED TO MEET NUREG NAS C-SC-02-01, SS-307 ON ADMIN HOLD 20020401 APPROVED 5 N CR3 SECURITY UNIT 00058558 AUGUST DOWLING EXCESSIVE TIME GROUP ON HOLD SINCE JULY 24, 2001. SS-307 W AS REPLACED DURING NAB C-SC-02-01,A FINDING RESULTED DUE TO SECURITY PR OCEDURE SS-307 BEING SS-307 NEEDS TO BE CANCELLED.

WITH A SERIES OF CSP-NGGC'S PROCEDURES.

N CR3 ENIiINEEHINLi DANIEL JOPUNG RWH-36 & 73 DO NOT MEET CODE 20020401 COMPLETE 2 N CR3 DESIGNENGINEERI*NG UNIT EVAL 00058559 REQUIREMENTS BUT ARE OPERABLE GROUP THIS CALCULATION WAS DEVELOPED AS PAR T OF THE CALCULATIONS M-74-0009 RWH-36 AND RWH-73 AND DETERMINED THE Y ARE OPERABLE ONLY.

THE IDENTIFICATION OF SUPPORTS THAT ARE NOT FULLY QUALIFIED TO THE CR-3 LICENSING BASES WAS AN EXPECTED LARGE BORE PIPING PROGRAM.

THE OPERABIL IT:Y DETERMINATION WAS IN ACCORDANCE WITH MDG-002, WHICH IS BASED ON GL 91-18, AND IEBIS 79-02 RESULT OF THE PROGRAM.

ANTICIPATED SUPPORT NON-CONFORMANCES.

AND 79-14. THE LBPP DEV ELOPED DR-JCO 97-0048 WHICH PROVIDED A GENERIC ASSESSMENT 0 F 20020401 APPROVED Z N iwIJ PRESSURISER LEVEL CONTROL NOT 20020401 APPROVED 2 N UNITEVAL 00058572 ANTHONY WASHINGTON RESPONDING ADEQUATELY.

& THE MUT LEVEL INCREASED ACCORDINGLY WH ILE IN AUTO AFTER MAKING A HYDROGEN ADDITION TO THE MUT THE PRESSURISER LEVEL FELL TO 209 CONTROLING LOW AT 214. THE RO ADUSTED SETPOINT UP AND THEN HAD TO ADJUST THE WITH SETPOINT AT220. ONCE THE LEVEL RECOVERED I T WAS TO THE ORIGINAL 220 SETPOINT TO HAVE MUV-31 CONTROL LEVEL AT 220.

SETPOINT BACK Y CR3 E&RC HADIATIUN MCCALLUM HEALTHY SEA TURTLES RESCUED FROM 20020401 APPROVED I Y CR3 E&RC RADIATION UNIT EVAL 00058575 GUY CONTROL BAR RACKS GRP A LIVE HEALTHY TURTLE WAS RESCUED FROM THE INTAKE BAR RACKS . SITE SECURITY NOTIFIED THE CONTROL ROOM OF THE RESCUE AT 1940 ON 4/01/02. THE TURTLE HAS BEEN TRANSPORTED TO THE M ARICULTURE CENTER FOR IDENTIFICATION. 2 2UPDATE: 2AN ADDITI ONAL TURTLE HAS BEEN AT 2120 ON 4/01/02. THE RESCUED FROM THE BAR RACKS. SITE SECU RITY NOTIFIED THE CONTROL ROOM OF THE RESCUE OF THE SECOND TURTLE TURTLE HAS BEEN TRANSPORTE D TO THE MARICULTURE CENTER FOR IDENTIFICATION.

Run Date/Trme: 4/3/02 4:07:29 AM Page 11 of 13 Report Name: RpLATNCRslntLast7a_CR3, Created from SrceThlAT_NCRsindtLast7a