L-02-085, July 2002 Monthly Operating Report for Beaver Valley Units 1 & 2

From kanterella
Revision as of 00:41, 26 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
July 2002 Monthly Operating Report for Beaver Valley Units 1 & 2
ML022270602
Person / Time
Site: Beaver Valley
Issue date: 08/07/2002
From: Bezilla M
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-02-085
Download: ML022270602 (5)


Text

FENOC Beaver Valley Power Station P. 0. Box 4 Shippingport,PA 15077 L-02-085 August 7, 2002 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Conunission Document Control Desk Washington, DC 20555 Gentlemen:

In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of July 2002.

Respectfully, M. B. Bezilla Vice-President DTJ/caj Enclosures cc: NRC Regional Office King of Prussia, PA

UNIT SHUTDOWNS DOCKET NO. 50-334 UNIT NAME BVPS Unit #1 DATE August 1, 2002 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: July 2002 No. Date Type Duration Reason Method of Cause / Corrective Actions (Y/M/D) F: Forced (Hours) (1) Shutting S: Scheduled Down (2) Comments NONE (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Ucense Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

The Unit operated at a nominal value of 100% output for the entire report period.

OPERATING DATA REPORT DOC*ET 10. : 50-334 UNIT NAME: rVPS UNIT #1 REPORT DATE: 08/01/02 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962 ffg&*l: Rated thermal power at

  • la. REPORTING PERIOD: JULY 2002
  • Bws-1 was uprated from 2652 uit*

to 2689 M*t on 10/20/01. Net *

1. DESIGN ELECTRICAL RATING (Net Mie): 835
  • DC wa also uprated from
  • 810 lWe to 821 MWe. *
2. Mime): 821 MAX. DPZENDABLZ CAPACITY (Net * * ** * * * ** *1 * *V * *t *b
  • THIS MONTH YEAR TO DATE CUMULATIVE 744.0 5087.0 230111.0 3a. HOURS IN REPORTING PERIOD:

744.0 5087.0 157168.5

3. NO. OF HRS. REACTOR WAS CRITICAL:

744.0 5087.0 154708.9

4. SERVICE HOURS GENERATOR ON LINE:

0.0 0.0 0.0

5. UNIT RESERVE SHUTDOWN HOURS:

606770.0 4185640.0 115851783.0

6. NET ELECTRICAL ENERGY GEN. (MKE):

643340.0 4430860.0 123697646.0

7. GROSS ELECT. ENERGY GEN. (MWH):

1997832.0 13548211.0 381183016.5

8. GROSS THERL ENERGY N. (KWH):

100.0 100.0 68.7

9. UNIT AVAILABILITY FACTOR (M):

100.2 64.0 99.3

10. UNIT CAPACITY FACTOR (MDC) (M):

0.0 0.0 16.0

11. UNIT FORCED OUTAGE RATE (M):

UNIT SHUTDOWNS DOCKET NO. 50-412 UNIT NAME BVPS Unit #2 DATE August 1, 2002 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: July 2002 No. Date Type Duration Reason Method of Cause / Corrective Actions (YIMID) F: Forced (Hours) (1) Shutting S: Scheduled Down (2) Comments NONE (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B- Maintenance or Test 2 - Manual Trip / Scram C- Refueling 3 - Automatic Trip I Scram D- Regulatory Restriction 4 - Continuation E- Operator Training / Ucense Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

The Unit operated at a nominal value of 100% output for the entire report period.

OPERATING DATA REPORT DOCKET NO.: 50-412 UNIT NAME: BVPS UNIT #2 REPORT DATE: 08/01/02 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962

  • Noeta: Rated thermal power at
  • la. REPORTING PERIOD: JULY 2002
  • BVPS-2 was uprated from 2652 MWt*
  • to 2689 Mwt on 10/30/01. Net *
1. DESIGN ELECTRICAL RATING (Net MV.): 836
  • MDC was also uprated from
  • 831
  • 820 MVe to 831 MEe. *
2. MAX. DEPENDABLE CAPACITY (Net MO): * * * * * * * * * * * * * * * * *
  • THIS MONTE YEAR TO DATE CUMULATIVE 744.0 5087.0 128894.0 3a. HOURS IN REPORTING PERIOD:

744.0 4527.6 105882.1

3. NO. OF ERS. REACTOR WAS CRITICAL:

744.0 4460.9 105153.5

4. SERVICE HOURS GENERATOR ON LINE:

0.0 0.0 0.0

5. UNIT RESERVE SHUTDOWN HOURS:

614578.0 3570459.0 82148551.0

6. NET ELECTRICAL ENERGY GEN. (MWE):

647267.0 3768654.0 86843397.0

7. GROSS ELECT. ENERGY GEN. (MWE):

11474467.0 264882048.0 1997512.0

a. GROSS THERMAL ENERGY GEN. (MUE):

87.7 81.6 100.0

9. UNIT AVAILABILITY FACTOR (M):

84.5 77.1 99.4

10. UNIT CAPACITY FACTOR (MDC) (M):

0.4 10.1 0.0

11. UNIT FORCED OUTAGE RATE (M):

Text

FENOC Beaver Valley Power Station P. 0. Box 4 Shippingport,PA 15077 L-02-085 August 7, 2002 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Conunission Document Control Desk Washington, DC 20555 Gentlemen:

In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of July 2002.

Respectfully, M. B. Bezilla Vice-President DTJ/caj Enclosures cc: NRC Regional Office King of Prussia, PA

UNIT SHUTDOWNS DOCKET NO. 50-334 UNIT NAME BVPS Unit #1 DATE August 1, 2002 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: July 2002 No. Date Type Duration Reason Method of Cause / Corrective Actions (Y/M/D) F: Forced (Hours) (1) Shutting S: Scheduled Down (2) Comments NONE (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Ucense Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

The Unit operated at a nominal value of 100% output for the entire report period.

OPERATING DATA REPORT DOC*ET 10. : 50-334 UNIT NAME: rVPS UNIT #1 REPORT DATE: 08/01/02 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962 ffg&*l: Rated thermal power at

  • la. REPORTING PERIOD: JULY 2002
  • Bws-1 was uprated from 2652 uit*

to 2689 M*t on 10/20/01. Net *

1. DESIGN ELECTRICAL RATING (Net Mie): 835
  • DC wa also uprated from
  • 810 lWe to 821 MWe. *
2. Mime): 821 MAX. DPZENDABLZ CAPACITY (Net * * ** * * * ** *1 * *V * *t *b
  • THIS MONTH YEAR TO DATE CUMULATIVE 744.0 5087.0 230111.0 3a. HOURS IN REPORTING PERIOD:

744.0 5087.0 157168.5

3. NO. OF HRS. REACTOR WAS CRITICAL:

744.0 5087.0 154708.9

4. SERVICE HOURS GENERATOR ON LINE:

0.0 0.0 0.0

5. UNIT RESERVE SHUTDOWN HOURS:

606770.0 4185640.0 115851783.0

6. NET ELECTRICAL ENERGY GEN. (MKE):

643340.0 4430860.0 123697646.0

7. GROSS ELECT. ENERGY GEN. (MWH):

1997832.0 13548211.0 381183016.5

8. GROSS THERL ENERGY N. (KWH):

100.0 100.0 68.7

9. UNIT AVAILABILITY FACTOR (M):

100.2 64.0 99.3

10. UNIT CAPACITY FACTOR (MDC) (M):

0.0 0.0 16.0

11. UNIT FORCED OUTAGE RATE (M):

UNIT SHUTDOWNS DOCKET NO. 50-412 UNIT NAME BVPS Unit #2 DATE August 1, 2002 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: July 2002 No. Date Type Duration Reason Method of Cause / Corrective Actions (YIMID) F: Forced (Hours) (1) Shutting S: Scheduled Down (2) Comments NONE (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B- Maintenance or Test 2 - Manual Trip / Scram C- Refueling 3 - Automatic Trip I Scram D- Regulatory Restriction 4 - Continuation E- Operator Training / Ucense Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

The Unit operated at a nominal value of 100% output for the entire report period.

OPERATING DATA REPORT DOCKET NO.: 50-412 UNIT NAME: BVPS UNIT #2 REPORT DATE: 08/01/02 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962

  • Noeta: Rated thermal power at
  • la. REPORTING PERIOD: JULY 2002
  • BVPS-2 was uprated from 2652 MWt*
  • to 2689 Mwt on 10/30/01. Net *
1. DESIGN ELECTRICAL RATING (Net MV.): 836
  • MDC was also uprated from
  • 831
  • 820 MVe to 831 MEe. *
2. MAX. DEPENDABLE CAPACITY (Net MO): * * * * * * * * * * * * * * * * *
  • THIS MONTE YEAR TO DATE CUMULATIVE 744.0 5087.0 128894.0 3a. HOURS IN REPORTING PERIOD:

744.0 4527.6 105882.1

3. NO. OF ERS. REACTOR WAS CRITICAL:

744.0 4460.9 105153.5

4. SERVICE HOURS GENERATOR ON LINE:

0.0 0.0 0.0

5. UNIT RESERVE SHUTDOWN HOURS:

614578.0 3570459.0 82148551.0

6. NET ELECTRICAL ENERGY GEN. (MWE):

647267.0 3768654.0 86843397.0

7. GROSS ELECT. ENERGY GEN. (MWE):

11474467.0 264882048.0 1997512.0

a. GROSS THERMAL ENERGY GEN. (MUE):

87.7 81.6 100.0

9. UNIT AVAILABILITY FACTOR (M):

84.5 77.1 99.4

10. UNIT CAPACITY FACTOR (MDC) (M):

0.4 10.1 0.0

11. UNIT FORCED OUTAGE RATE (M):