L-2003-132, Steam Generator Tube Plugging Report

From kanterella
Revision as of 12:01, 22 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Steam Generator Tube Plugging Report
ML031490089
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 05/26/2003
From: Jefferson W
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2003-132
Download: ML031490089 (1)


Text

Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 0

FPL May 26, 2003 L-2003-1 32 10 CFR 50.36 10 CFR 50.4 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Unit 2 Docket No. 50-389 Special Report Steam Generator Tube Pluging Report This letter is being sent pursuant to St. Lucie Unit 2 Technical Specification 4.4.5.5.a. The number of tubes plugged in each steam generator during the Unit 2 refueling outage (SL2-14) is listed below.

Steam Generator 2A - 197 Steam Generator 2B - 333 Cumulative tubes plugged during this outage and previous outages:

Steam Generator 2A - 671 Steam Generator 2B - 872 Please contact us should you have any questions regarding this information.

William effersc Vice President St. Lucie Plant WJ/spt A4D1 an FPL Group company