May 2003 Monthly Operating Report for Beaver Valley, Units 1 & 2
ML031690051
Person / Time
Site: Beaver Valley
Issue date: 06/06/2003
From: Pearce L
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-03-096
Download: ML031690051 (6)


Text

FENOC Beaver Valley Power Station P.O. Box 4 Shippingport, PA 15077 L-03-096 June 6, 2003 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of May, 2003.

Respectfully, W. Pearce Vice-President BVPS DTJ/cmg Enclosures cc: NRC Regional Office King of Prussia, PA 1g2f{~~~~~~

UNIT SHUTDOWNS DOCKET NO. 50-334 UNIT NAME BVPS Unit #1 DATE June 2, 2003 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: May 2003 No. Date Type Duration Reason Method of Cause / Corrective Acions (Y/MID) F: Forced (Hours) (1) Shutting

.___ _ s: Scheduled _ __. Down (2) Comments NONE.

(1) Reason (2) Meftiod A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Tp / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Conbnuation E - Operator Training / Ucense Examination 5- Other (Explain)

F - Administrabve G - Operational Enor (Explain)

H - Other (Explain)

SUMMARY

The Unit began the report period operating at approximately 29% output for fuel preconditioning and to complete obtaining core power distribution data for startup testing following its 15h refueling outage. Following completion of a flux map, the Unit began power ascension at approximately 0600 hours0.00694 days <br />0.167 hours <br />9.920635e-4 weeks <br />2.283e-4 months <br /> on 5/1/03 for fuel preconditioning. At 1355 hours0.0157 days <br />0.376 hours <br />0.00224 weeks <br />5.155775e-4 months <br /> on 5/1/03, power ascension was halted at approximately 45% output in order to allow chemistry conditions in the Steam Generators to retum to specifications. At approximately 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br /> on 5/2103, the Unit resumed power ascension for fuel preconditioning. Power ascension was halted at approximately 73% output at 2315 hours0.0268 days <br />0.643 hours <br />0.00383 weeks <br />8.808575e-4 months <br /> on 5/2/03 in order to obtain additional core power distribution data and power range calibration data. Following completion of a flux map, power ascension was resumed at 1317 hours0.0152 days <br />0.366 hours <br />0.00218 weeks <br />5.011185e-4 months <br /> on 5/4/03. Power ascension was halted at approximately 88% output at 2130 hours0.0247 days <br />0.592 hours <br />0.00352 weeks <br />8.10465e-4 months <br /> on 5/4/03 in order to perform calibration of nuclear instrumentation. Following this calibration, the Unit resumed power ascension at 2057 hours0.0238 days <br />0.571 hours <br />0.0034 weeks <br />7.826885e-4 months <br /> on 5/6/03. Power ascension was halted at approximately 95% output at 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> on 5/6/03 in order to perform calibration of Delta-tlravg instrumentation. Following this calibration, the Unit commenced to increase output to full power at 0145 hours0.00168 days <br />0.0403 hours <br />2.397487e-4 weeks <br />5.51725e-5 months <br /> on 5/7/03. At 0225 hours0.0026 days <br />0.0625 hours <br />3.720238e-4 weeks <br />8.56125e-5 months <br /> on 517/03, power ascension was halted due to a 'Main Unit Generator Hot Gas Temperature High Deviation" alarm. Output was reduced approximately 1% at 0534 hours0.00618 days <br />0.148 hours <br />8.829365e-4 weeks <br />2.03187e-4 months <br /> on 5/7/03 in order to clear the alarm. Following resolution of the problem, power ascension to full power was resumed at 1321 hours0.0153 days <br />0.367 hours <br />0.00218 weeks <br />5.026405e-4 months <br /> on 5/7/03. A nominal value of 100% output was achieved at approximately 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br /> on 5/7/03.

UNIT SHUTDOWNS DOCKET NO. 50-334 UNIT NAME BVPS Unit #1 DATE June 2, 2003 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: May 2003

SUMMARY

(continued):

The Unit continued to operate at a nominal value of 100% output until 1510 hours0.0175 days <br />0.419 hours <br />0.0025 weeks <br />5.74555e-4 months <br /> on 5/11/03 when output was reduced to approximately 94% at 1515 hours0.0175 days <br />0.421 hours <br />0.0025 weeks <br />5.764575e-4 months <br /> in order to stabilize Main Unit Condenser hotwell conditions due to low Condenser vacuum caused by tube fouling. As conditions in the Condenser hotwell improved, output was increased incrementally beginning at 1645 hours0.019 days <br />0.457 hours <br />0.00272 weeks <br />6.259225e-4 months <br /> on 5/11/03. A nominal value to 100% output was achieved at 2337 hours0.027 days <br />0.649 hours <br />0.00386 weeks <br />8.892285e-4 months <br /> on 5/11/03.

The Unit.continued to operate at a nominal value of 100% output until 0010 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> on 5/14/03 when a planned reduction was begun to clean the Main Unit Condenser waterboxes. An output of approximately 90% was achieved at 0129 hours0.00149 days <br />0.0358 hours <br />2.132936e-4 weeks <br />4.90845e-5 months <br /> on 5/14/03. Upon completion of cleaning the Main Unit Condenser waterboxes, the Unit commenced to increase output to full power at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> on 5/22/03. A nominal value to 100% output was achieved at 1758 hours0.0203 days <br />0.488 hours <br />0.00291 weeks <br />6.68919e-4 months <br /> on 5/22/03.

The Unit continued to operate at a nominal value of 100% output for the remainder of the report period.

OPERATING DATA REPORT DOC[ZE NO. s 50-334 UNIT IWM t BVP8 UNIT 1 REPORT DATE: 06/02/03 COMPLETED By: DAVID T. JONES TELEPEONE: (724) 682-4962

  • Notes: Rated ther-al power at
  • la. REPORTING PERIOD: MAY 2003
  • 8VPS-1 was uprated from 2652 KWt*
1. DESIGN ELECTRICAL RATING (Not KWe): 835
  • to 2689 KWt on 10/20/01. Net *
  • YDC was also uprated from
2. 3AX. DEPENDABLE CAPACITY (Net MWe)t 821
  • 810 MWe to 21 KMW.
  • THIS MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 744.0 3623.0 237407.0
3. NO. OF ERS. REACTOR WAS CRITICAL: 744.0 2322.5 162914.0
4. SERVICE HOURS GENERATOR ON LINE: 744.0 2294.5 160406.5
5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
6. NET ELECTRICAL ENERGY GEN. (KWH): 559950.0 1742068.0 120398075.0
7. GROSS ELECT. EERGY GEN. (MWE): 593100.0 1855756.0 128525346.0 B. GROSS THERMAL ENERGY GEN. (KWH): 1827829.0 5664202.0 395935511.5
9. UNIT AVAILABILITY FACTOR (): 100.0 63.3 69.0
10. UNIT CAPACITY FACTOR (MDC) (b): 91.7 58.6 64.4
11. UNIT FORCED OUTAGE RATE l%): 0.0 2.5 15.5

UNIT SHUTDOWNS DOCKET NO. 50-412 UNIT NAME BVPS Unit #2 DATE June 2,2003 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: Mav 2003 No. Date Type Duration Reason Method of Cause I Corrective Actions (Y/MD) F: Forced (Hours) (1) Shuffing S: Scheduled _ Down (2) Comments NONE.

(1)Reason (2)Meftiod A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trp I Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restricon 4 - Coninuation E - Operator Training I Ucense Examinaton 5 - Other (Explain)

F - Adninistratve G- Operafonal Error (Explain)

H - Other (Explain)

SUMMARY

The Unit began the report period operating at a nominal value of 100% output. At 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> on 5/22103, a planned reduction was begun to clean the Main Unit Condenser waterboxes. An output of approximately 75% was achieved at 2233 hours0.0258 days <br />0.62 hours <br />0.00369 weeks <br />8.496565e-4 months <br /> on 5/22/03. Upon completion of cleaning the B" and D" waterboxes in the Main Unit Condenser, the Unit commenced to increase output to full power at 1049 hours0.0121 days <br />0.291 hours <br />0.00173 weeks <br />3.991445e-4 months <br /> on 5/25/03. A nominal value to 100% output was achieved at 1700 hours0.0197 days <br />0.472 hours <br />0.00281 weeks <br />6.4685e-4 months <br /> on 5/25/03. The Unit continued to operate at a nominal value of 100%

output for the remainder of the report period.

OPERATING DATA REPORT DOCKET NO.: 50-412 UIT NE BYPS UNIT 12 REPORT DATE: 06/02/03 COMPLETED BY: DAVID T. JONES TELEPHONE  : (724) 682-4962

  • 3okes: Rated thermal power at la. REPORTING PERIOD: KAY 2003
  • BVPS-2 was uprat-d from 2652 XWt*
1. DESIGN ELECTRICAL RATING (Net We): 836
  • to 2689 Mwt on 10/30/01. Net *
  • NDC was alo uprated from *
2. MA. DEPENDABLE CAPACITY (Net We): 831
  • 820 We to 831 We.
  • THIS MONTE YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 744.0 3623.0 136190.0
3. NO. OF RS. REACTOR WAS CRITICAL: 744.0 3623.0 113178.1
4. SERVICE BOURS GENERATOR ON LINE: 744.0 3623.0 112449.5
5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
6. NET ELECTRICAL ENERGY GEN. (KWH)s 610290.0 3043655.0 88226058.0
7. GROSS ELECT. ENERGY GEN. (KWH): 641579.0 3198909.0 93230954.0
8. GROSS THERMAL ENERGY GEN. (KWH): 1953657.0 9684373.0 284283984.0
9. UNIT AVAILABILITY FACTOR (): 100 .0 100.0 82.6
10. UNIT CAPACITY FACTOR (KDC) (): 98.7 101.1 77.8
11. UNIT FORCED OUTAGE RATE (): 0.0 0.0 9.5

Text

FENOC Beaver Valley Power Station P.O. Box 4 Shippingport, PA 15077 L-03-096 June 6, 2003 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of May, 2003.

Respectfully, W. Pearce Vice-President BVPS DTJ/cmg Enclosures cc: NRC Regional Office King of Prussia, PA 1g2f{~~~~~~

UNIT SHUTDOWNS DOCKET NO. 50-334 UNIT NAME BVPS Unit #1 DATE June 2, 2003 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: May 2003 No. Date Type Duration Reason Method of Cause / Corrective Acions (Y/MID) F: Forced (Hours) (1) Shutting

.___ _ s: Scheduled _ __. Down (2) Comments NONE.

(1) Reason (2) Meftiod A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Tp / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Conbnuation E - Operator Training / Ucense Examination 5- Other (Explain)

F - Administrabve G - Operational Enor (Explain)

H - Other (Explain)

SUMMARY

The Unit began the report period operating at approximately 29% output for fuel preconditioning and to complete obtaining core power distribution data for startup testing following its 15h refueling outage. Following completion of a flux map, the Unit began power ascension at approximately 0600 hours0.00694 days <br />0.167 hours <br />9.920635e-4 weeks <br />2.283e-4 months <br /> on 5/1/03 for fuel preconditioning. At 1355 hours0.0157 days <br />0.376 hours <br />0.00224 weeks <br />5.155775e-4 months <br /> on 5/1/03, power ascension was halted at approximately 45% output in order to allow chemistry conditions in the Steam Generators to retum to specifications. At approximately 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br /> on 5/2103, the Unit resumed power ascension for fuel preconditioning. Power ascension was halted at approximately 73% output at 2315 hours0.0268 days <br />0.643 hours <br />0.00383 weeks <br />8.808575e-4 months <br /> on 5/2/03 in order to obtain additional core power distribution data and power range calibration data. Following completion of a flux map, power ascension was resumed at 1317 hours0.0152 days <br />0.366 hours <br />0.00218 weeks <br />5.011185e-4 months <br /> on 5/4/03. Power ascension was halted at approximately 88% output at 2130 hours0.0247 days <br />0.592 hours <br />0.00352 weeks <br />8.10465e-4 months <br /> on 5/4/03 in order to perform calibration of nuclear instrumentation. Following this calibration, the Unit resumed power ascension at 2057 hours0.0238 days <br />0.571 hours <br />0.0034 weeks <br />7.826885e-4 months <br /> on 5/6/03. Power ascension was halted at approximately 95% output at 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> on 5/6/03 in order to perform calibration of Delta-tlravg instrumentation. Following this calibration, the Unit commenced to increase output to full power at 0145 hours0.00168 days <br />0.0403 hours <br />2.397487e-4 weeks <br />5.51725e-5 months <br /> on 5/7/03. At 0225 hours0.0026 days <br />0.0625 hours <br />3.720238e-4 weeks <br />8.56125e-5 months <br /> on 517/03, power ascension was halted due to a 'Main Unit Generator Hot Gas Temperature High Deviation" alarm. Output was reduced approximately 1% at 0534 hours0.00618 days <br />0.148 hours <br />8.829365e-4 weeks <br />2.03187e-4 months <br /> on 5/7/03 in order to clear the alarm. Following resolution of the problem, power ascension to full power was resumed at 1321 hours0.0153 days <br />0.367 hours <br />0.00218 weeks <br />5.026405e-4 months <br /> on 5/7/03. A nominal value of 100% output was achieved at approximately 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br /> on 5/7/03.

UNIT SHUTDOWNS DOCKET NO. 50-334 UNIT NAME BVPS Unit #1 DATE June 2, 2003 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: May 2003

SUMMARY

(continued):

The Unit continued to operate at a nominal value of 100% output until 1510 hours0.0175 days <br />0.419 hours <br />0.0025 weeks <br />5.74555e-4 months <br /> on 5/11/03 when output was reduced to approximately 94% at 1515 hours0.0175 days <br />0.421 hours <br />0.0025 weeks <br />5.764575e-4 months <br /> in order to stabilize Main Unit Condenser hotwell conditions due to low Condenser vacuum caused by tube fouling. As conditions in the Condenser hotwell improved, output was increased incrementally beginning at 1645 hours0.019 days <br />0.457 hours <br />0.00272 weeks <br />6.259225e-4 months <br /> on 5/11/03. A nominal value to 100% output was achieved at 2337 hours0.027 days <br />0.649 hours <br />0.00386 weeks <br />8.892285e-4 months <br /> on 5/11/03.

The Unit.continued to operate at a nominal value of 100% output until 0010 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> on 5/14/03 when a planned reduction was begun to clean the Main Unit Condenser waterboxes. An output of approximately 90% was achieved at 0129 hours0.00149 days <br />0.0358 hours <br />2.132936e-4 weeks <br />4.90845e-5 months <br /> on 5/14/03. Upon completion of cleaning the Main Unit Condenser waterboxes, the Unit commenced to increase output to full power at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> on 5/22/03. A nominal value to 100% output was achieved at 1758 hours0.0203 days <br />0.488 hours <br />0.00291 weeks <br />6.68919e-4 months <br /> on 5/22/03.

The Unit continued to operate at a nominal value of 100% output for the remainder of the report period.

OPERATING DATA REPORT DOC[ZE NO. s 50-334 UNIT IWM t BVP8 UNIT 1 REPORT DATE: 06/02/03 COMPLETED By: DAVID T. JONES TELEPEONE: (724) 682-4962

  • Notes: Rated ther-al power at
  • la. REPORTING PERIOD: MAY 2003
  • 8VPS-1 was uprated from 2652 KWt*
1. DESIGN ELECTRICAL RATING (Not KWe): 835
  • to 2689 KWt on 10/20/01. Net *
  • YDC was also uprated from
2. 3AX. DEPENDABLE CAPACITY (Net MWe)t 821
  • 810 MWe to 21 KMW.
  • THIS MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 744.0 3623.0 237407.0
3. NO. OF ERS. REACTOR WAS CRITICAL: 744.0 2322.5 162914.0
4. SERVICE HOURS GENERATOR ON LINE: 744.0 2294.5 160406.5
5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
6. NET ELECTRICAL ENERGY GEN. (KWH): 559950.0 1742068.0 120398075.0
7. GROSS ELECT. EERGY GEN. (MWE): 593100.0 1855756.0 128525346.0 B. GROSS THERMAL ENERGY GEN. (KWH): 1827829.0 5664202.0 395935511.5
9. UNIT AVAILABILITY FACTOR (): 100.0 63.3 69.0
10. UNIT CAPACITY FACTOR (MDC) (b): 91.7 58.6 64.4
11. UNIT FORCED OUTAGE RATE l%): 0.0 2.5 15.5

UNIT SHUTDOWNS DOCKET NO. 50-412 UNIT NAME BVPS Unit #2 DATE June 2,2003 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: Mav 2003 No. Date Type Duration Reason Method of Cause I Corrective Actions (Y/MD) F: Forced (Hours) (1) Shuffing S: Scheduled _ Down (2) Comments NONE.

(1)Reason (2)Meftiod A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trp I Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restricon 4 - Coninuation E - Operator Training I Ucense Examinaton 5 - Other (Explain)

F - Adninistratve G- Operafonal Error (Explain)

H - Other (Explain)

SUMMARY

The Unit began the report period operating at a nominal value of 100% output. At 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> on 5/22103, a planned reduction was begun to clean the Main Unit Condenser waterboxes. An output of approximately 75% was achieved at 2233 hours0.0258 days <br />0.62 hours <br />0.00369 weeks <br />8.496565e-4 months <br /> on 5/22/03. Upon completion of cleaning the B" and D" waterboxes in the Main Unit Condenser, the Unit commenced to increase output to full power at 1049 hours0.0121 days <br />0.291 hours <br />0.00173 weeks <br />3.991445e-4 months <br /> on 5/25/03. A nominal value to 100% output was achieved at 1700 hours0.0197 days <br />0.472 hours <br />0.00281 weeks <br />6.4685e-4 months <br /> on 5/25/03. The Unit continued to operate at a nominal value of 100%

output for the remainder of the report period.

OPERATING DATA REPORT DOCKET NO.: 50-412 UIT NE BYPS UNIT 12 REPORT DATE: 06/02/03 COMPLETED BY: DAVID T. JONES TELEPHONE  : (724) 682-4962

  • 3okes: Rated thermal power at la. REPORTING PERIOD: KAY 2003
  • BVPS-2 was uprat-d from 2652 XWt*
1. DESIGN ELECTRICAL RATING (Net We): 836
  • to 2689 Mwt on 10/30/01. Net *
  • NDC was alo uprated from *
2. MA. DEPENDABLE CAPACITY (Net We): 831
  • 820 We to 831 We.
  • THIS MONTE YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 744.0 3623.0 136190.0
3. NO. OF RS. REACTOR WAS CRITICAL: 744.0 3623.0 113178.1
4. SERVICE BOURS GENERATOR ON LINE: 744.0 3623.0 112449.5
5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
6. NET ELECTRICAL ENERGY GEN. (KWH)s 610290.0 3043655.0 88226058.0
7. GROSS ELECT. ENERGY GEN. (KWH): 641579.0 3198909.0 93230954.0
8. GROSS THERMAL ENERGY GEN. (KWH): 1953657.0 9684373.0 284283984.0
9. UNIT AVAILABILITY FACTOR (): 100 .0 100.0 82.6
10. UNIT CAPACITY FACTOR (KDC) (): 98.7 101.1 77.8
11. UNIT FORCED OUTAGE RATE (): 0.0 0.0 9.5