MONTHYEARML24052A3062024-04-0808 April 2024 Issuance of Amendment Nos. 331 & 310, Regarding Adoption of Title 10 of Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants ML24031A5402024-03-26026 March 2024 Issuance of Amendment Nos. 330 and 309 Regarding Implementation of TSTF 505,Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 RA-21-0320, License Amendment Request (LAR) to Revise the Applicability Term for Pressure and Temperature Limit Curves of Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits2021-12-20020 December 2021 License Amendment Request (LAR) to Revise the Applicability Term for Pressure and Temperature Limit Curves of Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits ML18355A6102019-01-25025 January 2019 Issuance of Amendments to Revise the Licensing Basis for Protection from Tornado Generated Missiles ML18318A3582019-01-16016 January 2019 Issuance of Amendment Nos. 311 and 290 to Correct Non-Conservative Technical Specification 3.4.11, Pressurizer Power Operated Relief Valves Porvs) RA-17-0051, Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating2017-11-21021 November 2017 Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating ML17269A0552017-10-25025 October 2017 McGuire, Units 1 and 2 - Issuance of Amendments Adopting Technical Specification Task Force Traveler TSTF-283-A, Revision 3 (CAC NOS. MF9098 and MF9099) ML17248A4692017-08-29029 August 2017 Tech Spec and Tech Spec Bases TS-LOEP & TSB-LOES ML17237A0472017-08-17017 August 2017 Document Transmittal Form Regarding Technical Specification - List of Effected Pages (Rev. 111) RA-17-0001, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2017-07-18018 July 2017 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules ML17066A3742017-04-26026 April 2017 Issuance of Amendments Re. Application to Revise TSs to Adopt TSTF-427, Rev. 2, Using the Consolidated Line Item Improvement Process (CAC Nos. MF8039 Through MF8049) ML17087A2732017-03-22022 March 2017 Issue Tech Specification List of Affected Pages (Loep), Revision 108 ML17087A2722017-03-22022 March 2017 Renewed Facility Operating License - Amendment 293 ML16236A0532016-09-26026 September 2016 Issuance of Amendments Regarding One-Time Extension of Appendix J Type a Integrated Leakage Rate Test Interval ML16243A3532016-08-17017 August 2016 Technical Specifications 5.5, Revision 1 - Amendment No. 276/256 ML16139A4612016-05-10010 May 2016 Technical Specification 3.3.1, Rev. 001, Amendments 283 and 262 ML16075A3012016-04-26026 April 2016 Issuance of Amendments Regarding the Revision of the Steam Generator Technical Specifications to Reflect the Adoption of TSTF-510(CAC Nos. MF6139,MF6140,MF6141,MF6142,MF6143,MF6144. ML16067A2292016-04-0808 April 2016 Issuance of Amendments Regarding Removal of Obsolete Technical Specification Requirements MNS-15-068, License Amendment Request to Technical Specification (TS) 3.6.13, Ice Condenser Doors.2016-03-24024 March 2016 License Amendment Request to Technical Specification (TS) 3.6.13, Ice Condenser Doors. ML15306A1412016-03-16016 March 2016 Issuance of License Amendment Regarding Nuclear Service Water System Allowed Outrage Time Extension ML16004A3522016-02-0303 February 2016 Issuance of Amendment Request to Revise Technical Specification for Residual Heat Removal System Air Handler Unit 1 ML15174A1732015-08-24024 August 2015 Issuance of Amendments Regarding Technical Specification Definition of Rated Thermal Power ML15133A4532015-06-11011 June 2015 McGuire Nuclear Station, Oconee Nuclear Station - Issuance of Amendments Regarding Changes to Cyber Security Plan Implementation Schedule Milestone 8 ML15063A2712015-04-14014 April 2015 Issuance of Amendments Technical Specification 3.1.3, Moderator Temperature Coefficient and TS 5.6.5, Core Operating Limits Report. ML15119A2182015-04-0707 April 2015 Technical Specification (TS) and Tech Spec Bases (Tsb) Manual ML15027A3662015-03-25025 March 2015 Issuance of Amendments DPC-NE-3001-P, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology MNS-15-013, Submits a License Amendment Request for the Renewed Facility Operating Licenses and Technical Specifications to Remove a Superseded TS Requirement2015-03-23023 March 2015 Submits a License Amendment Request for the Renewed Facility Operating Licenses and Technical Specifications to Remove a Superseded TS Requirement ML15002A3242015-02-12012 February 2015 McGuire Nuclear Station, and Oconee Nuclear Station - Issuance of Amendments Regarding Changes to Organization, Unit Staff Responsibility, Unit Staff Qualifications, Programs and Manuals, and High Radiation Areas ML14231A6342014-09-10010 September 2014 Issuance of Amendments Regarding Technical Specification 3.8.4, DC Sources-Operating, ML14211A4032014-08-27027 August 2014 Issuance of Amendments Regarding Technical Specification 3.3.2 in Support of Compliance with NRC Order EA-12-049 ML14142A0112014-05-0505 May 2014 Technical Specification & Technical Specification Bases ML13316A0072013-10-31031 October 2013 Updated Technical Specifications Manual and Bases ML13277A3602013-09-24024 September 2013 Technical Specifications Bases ML13135A1332013-04-25025 April 2013 Annual Radioactive Effluent Release Report ML12340A4062012-11-27027 November 2012 Technical Specifications & Technical Specification Bases Updates. Includes Tsb Loes (Revision 114) & Tsb 3.6.15 (Entire Section) Rev 125 ML12240A1962012-09-29029 September 2012 Issuance of Amendments, Regarding Changes to Diesel Generator Starting Air Pressure Limits ML12229A1462012-08-0909 August 2012 License Amendment Request for One-Time Change to Technical Specification 3.8.4, DC Sources-Operating for Battery Replacement ML12082A2102012-03-0505 March 2012 License Amendment Request for Measurement Uncertainty Recapture Power Uprate ML11341A1102011-12-0505 December 2011 License Amendment Request for Changes to Technical Specification Table 3.3.1-1, Reactor Trip System Instrumentation, Function 16(e) ML11318A1172011-11-0909 November 2011 License Amendment Request for Temporary Changes to Technical Specifications and Limited Duration Use of NUREG-0800, Section 3.5.1.3, Revision 3, to Allow Nuclear Service Water System (Nsws) 'A' Train Repair ML11131A1332011-09-12012 September 2011 License Amendment, Issuance of Amendments Regarding Technical Specification Changes to Allow Manual Operation of the Containment Spray System ML11140A0882011-05-12012 May 2011 Request for Exemption from Certain Requirements of 10 CFR 72.212(a)(2), 72.212(b)(2)(i), 72.212(b)(7) and 72.214 ML1106603442011-02-28028 February 2011 Technical Specification and Tec Spec Bases Updates ML1103200662011-01-24024 January 2011 Notice of Enforcement Discretion Request (Noed), Technical Specification (TS) Limiting Condition for Operation (LCO) 3.0.3 ML1032700962010-12-20020 December 2010 License Amendment, Issuance of Amendments Regarding Revision of Technical Specification (TS) 3.8.4 DC (Direct Current) Sources - Operating. ML1032706582010-11-18018 November 2010 Response to Request for Additional Information to Application for Technical Specification Change Re Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements ML1022803352010-08-0404 August 2010 Technical Specification Updates ML1019504512010-08-0202 August 2010 Issuance of Amendments Regarding Replacement of Source Range and Intermediate Range Encore Detection Systems with Equivalent Neutron Monitoring Systems Using Fission Chamber Detectors (TAC ME1749 & ME1750) ML1021503242010-06-28028 June 2010 Technical Specifications and Technical Specifications Bases Updates 2024-04-08
[Table view] |
Text
Reportability 5.1 5.0 ADMINISTRATIVE CONTROLS 5.1 Responsibility 5.1.1 The Station Manager shall be responsible for overall unit operation and shall delegate in writing the succession to this responsibility during his absence.
5.1.2 The Control Room Senior Reactor Operator (CRSRO) shall be responsible for the control room command function. During any absence of the CRSRO from the control room while the unit is in MODE 1, 2, 3, or 4, an individual [other than the Shift Technical Advisor (STA)] with an active Senior Reactor Operator (SRO) license shall be designated to assume the control room command function. During any absence of the CRSRO from the control room while the unit is in MODE 5 or 6, an individual with an active SRO license or Reactor Operator license shall be designated to assume the control room command function.
On occasion when there is a need for both the CRSRO and the relief SRO to be absent from the control room in MODE 1, 2, 3, or 4, the STA shall be allowed to assume the control room command function and serve as the SRO in the control room provided that:
- a. the CRSRO or the relief SRO is available to return to the control room within 10 minutes,
- b. the assumption of SRO duties by the STA is limited to periods not in excess of 15 minutes duration and a total time not to exceed 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> during any shift, and
- c. the STA has a SRO license on the unit.
McGuire Units 1 and 2 5.1-1 213 and 194
Organization 5.2 5.2 Organization 5.2.2 Unit Staff (continued)
- 2. An individual should not be permitted to work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in any 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period, nor more than 28 hours3.240741e-4 days <br />0.00778 hours <br />4.62963e-5 weeks <br />1.0654e-5 months <br /> in any 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period, nor more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> In any 7 day period, all excluding shift turnover time;
- 3. A break of at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> should be allowed between work periods, including shift turnover time;
- 4. Except during extended shutdown periods, the use of overtime should be considered on an individual basis and not for the entire staff on a shift.
Any deviation from the above guidelines shall be authorized in advance by the Station Manager or his designee, In accordance with approved administrative procedures, or by higher levels of management, in accordance with established procedures and with documentation of the basis for granting the deviation.
Controls shall be Included in the procedures such that individual overtime shall be reviewed monthly by the Station Manager or his designee to ensure'that excessive hours have not been assigned.
Routine deviation from the above guidelines is not authorized.
- f. The Operations Manager shall hold or have held an SRO license.
- g. The Shift Technical Advisor (STA) shall provide advisory technical support to the Control Room Senior Reactor Operator (CRSRO) inthe areas of thermal hydraulics, reactor engineering, and plant analysis with regard to the safe operation of the unit.
(continued)
McGuire Units 1 and 2 5.2-3 213 and 194
Unit Staff Qualifications 5.3 5.0 ADMINISTRATIVE CONTROLS 5.3 Unit Staff Qualifications 5.3.1 Each member of the unit staff shall meet or exceed the minimum qualifications of ANSI-N18.1-1971 for comparable positions, except the Radiation Protection Manager, who shall meet or exceed the qualifications of Regulatory Guide 1.8, September 1975. l McGuire Units 1 and 2 5.3-1 213 and 194
High Radiation Area 5.7 5.0 ADMINISTRATIVE CONTROLS 5.7 High Radiation Area 5.7.1 Pursuant to 10 CFR 20, paragraph 20.1601 (c), in lieu of the requirements of 10 CFR 20.1601, each high radiation area, as defined in 10 CFR 20, in which the intensity of radiation is > 100 mrem/hr but < 1000 mremlhr at 30 cm (12 in.) from the radiation source or from any surface which the radiation penetrates, shall be barricaded and conspicuously posted as a high radiation area and entrance thereto shall be controlled by requiring issuance of a Radiation Work Permit (RWP). Individuals qualified in radiation protection procedures (e.g., Radiation Protection Technicians) or personnel continuously escorted by such individuals may be exempt from the RWP issuance requirement during the performance of their assigned duties in high radiation areas with exposure rates 5 1000 mrem/hr, provided they are otherwise following plant radiation protection procedures for entry into such high radiation areas.
Any individual or group of individuals permitted to enter such areas shall be provided with or accompanied by one or more of the following:
- a. A radiation monitoring device that continuously indicates the radiation dose rate in the area.
- b. A radiation monitoring device that continuously integrates the radiation dose rate in the area and alarms when a preset integrated dose is received. Entry into such areas with this monitoring device may be made after the dose rate levels in the area have been established and personnel are aware of them.
- c. An individual qualified in radiation protection procedures with a radiation dose rate monitoring device, who is responsible for providing positive control over the activities within the area and shall perform periodic radiation surveillance at the frequency specified by the Radiation Protection Manager in the RWP.
5.7.2 In addition to the requirements of Specification 5.7.1, areas with radiation levels
> 1000 mrem/hr at 30 cm (12 in.) from the radiation source or from any surface which the radiation penetrates shall be provided with locked or continuously guarded doors to prevent unauthorized entry and the keys shall be maintained under the administrative control of the Operations Shift Manager, Radiation Protection Manager, or his or her designee. Doors shall remain locked except during periods of access by personnel under an approved RWP that shall specify the dose rate levels in the Immediate work areas and the maximum allowable stay times for individuals in those areas. In lieu of the stay time specification of the RWP, direct or remote (such as closed circuit TV cameras) continuous surveillance may be made by personnel qualified in radiation protection procedures to provide positive exposure control over the activities being performed within the area.
(continued)
McGuire Units 1 and 2 5.7-1 213 and 194