ML040690593

From kanterella
Revision as of 01:36, 19 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Technical Specifications, Primary Containment Isolation Instrumentation
ML040690593
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 03/05/2004
From:
NRC/NRR/DLPM
To:
Macon W, NRR/DLPM,415-3965
Shared Package
ML040690451 List:
References
TAC MB8462, TAC MB8463
Download: ML040690593 (3)


Text

Primary Containment Isolation Instrumentation 3.3.6.1 Table 3.3.6.1-1 (page 1 of 4)

Primary Containment Isolation Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION C.1 REQUIREMENTS VALUE

1. Main Steam Line Isolation
a. Reactor Vessel Water 1,2.3 2 SR 3. 3.6. 1.1 2 -137.0 inches Level-Low Low Low, SR 3.3.6.1.2 Level 1 SR 3.3.6.1.4 SR 3.3.6. 1.5 SR 3.3.6. 1.6
b. Main Steam Line 1 2 SR 3. 3.6. 1.2 2 826.5 psig Pressure-Low SR 3.3.6.1.3 SR 3.3.6.1.5 SR 3. 3.6. 1.6
c. Main Steam Line 1,2,3 2 per MSL D SR 3.3.6. 1.2 5 128.0 psid Flow-High SR 3. 3.6. 1.3 SR 3.3. 6. 1.5 SR 3.3.6.1.6
d. Condenser Vacuum-Low 1,2Va), 2 SR 3.3.6.1.2 2 3.8 inches SR 3.3.6.1.4 Hg vacuum 3(4a SR 3.3.6.1.5
e. Main Steam Line Tunnel 1,2.3 2 0 SR 3.3.6.1.1 s 66.41F Differential SR 3.3.6.1.2 Temperature-High SR 3.3.6.1.4 SR 3.3.6.1.5
f. Manual Initiation 1,2,3 2 G SR 3.3.6.1.5 NA
2. Primary Containment Isolation
a. Reactor Vessel Water 1,2,3 2 H SR 3.3.6.1.2 2 -58.0 inches Level-Low Low, SR 3.3.6.1.4 Level 2 SR 3. 3.6. 1.5
b. Drywell Pressure-High 1,2,3 2 H SR 3.3.6. 1.2 5 1.93 psig SR 3.3. 6. 1. 4 SR 3. 3.6. 1.5
c. Reactor Building 1,2.3 2 F SR 3.3.6.1.1 s 42.0 mR/hr Ventilation Exhaust SR 3.3.6.1.2 Plenum Radiation-High SR 3.3.6.1.4 SR 3.3.6.1.5
d. Fuel Pool Ventilation 1,2.3 F SR 3. 3.6. 1.1

(a) With any turbine stop valve not closed.

LaSalle 1 and 2 3.3.6. 1-6 Amendment No. 166/152

Primary Containment Isolation Instrumentation 3.3.6.1 Table 3.3.6.1-1 (page 2 of 4)

Primary Containment Isolation Instrumentation APPLICABLE CONDITIONS MODES OR REGUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION C.1 REOUIREMENTS VALUE

2. Primary Containment Isolation (continued)
e. Reactor Vessel Water 1,2,3 2 F SR 3.3.6.1.1 2 -137.0 inches Level-Low Low Low, SR 3.3.6.1.2 Level 1 SR 3 .3.6. 1.4 SR 3.3.6.1.5
f. Reactor Vessel Water 1,2,3 2 F SR 3.3.6.1.1 2 11.0 inches Level-Low, Level 3 SR 3. 3.6. 1.2 SR 3.3.6.1.4 SR 3.3.6. 1.5
g. Manual Initiation 1,2,3 1 G SR 3.3.6.1.5 NA
3. Reactor Core Isolation Cooling (RCIC) System Isolation
a. RCIC Steam Line 1,2.3 1 F SR 3.3.6.1.2 s 176.0 inches Flow-High SR 3.3.6.1.3 water SR 3.3.6.1.5
b. RCIC Steam Line 1,2,3 1 F SR 3.3.6.1.2 2 2.6 seconds and Flow-Timer SR 3.3.6.1.4 s 5.5 seconds SR 3.3.6.1.5
c. RCIC Steam Supply 1,2,3 2 F SR 3.3.6.1.2 2 58.2 psig Pressure-Low SR 3.3.6.1.4 SR 3.3.6.1.5
d. RCIC Turbine Exhaust 1,2,3 2 F SR 3.3.6.1.2 5 300 inches water Diaphragm Pressure-High SR 3.3.6.1.4 SR 3.3.6.1.5
e. RCIC Equipment Room 1,2,3 F SR 3.3.6.1.1 s 291.0°F I Temperature-High SR 3.3.6.1.2 SR 3.3. 6. 1.4 SR 3.3.6. 1.5
f. RCIC Equipment Room 1,2,3 F SR 3.3.6.1.1 s 189.0°F I Differential SR 3.3.6.1.2 Temperature-High SR 3.3. 6. 1.4 SR 3.3.6. 1.5
g. RCIC Steam Line Tunnel 1,2,3 F SR 3.3.6.1.1 s 277.0°F Temperature-High SR 3.3.6.1.2 SR 3.3.6.1.4 SR 3.3. 6. 1.5
h. RCIC Steam Line Tunnel 1,2,3 F SR 3.3.6.1.1 s 155.0°F Differential SR 3.3.6.1.2 Temperature-High SR 3.3.6.1.4 SR 3.3.6.1.5
i. Drywell Pressure-High 1,2,3 F SR 3.3.6.1.2 s 1.77 psig SR 3.3.6. 1.4 SR 3.3.6.1.5 (continued)

LaSalle 1 and 2 3.3.6.1- 7 Amendment No. 166/152

Primary Containment Isolation Instrumentation 3.3.6.1 Table 3.3.6.1-1 (page 3 of 4)

Primary Containment Isolation Instrumentation APPLICABLE CONDITIONS MODES OR REFERENCED OTHER REQUIRED FROM SPECIFIED CHANNELS PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS TRIP SYSTEM ACTION C.l REQUIREMENTS VALUE

3. RCIC System Isolation (continued)
j. Manual Initiation 1,2,3 1(b) SR 3.3.6.1.5 NA
4. Reactor Water Cleanup (RWCU)

System Isolation

a. Differential Flow-High 1,2,3 1 F SR 3.3.6. 1.1 s 82.8 gpm SR 3.3.6.1.2 SR 3.3.6.1.4 SR 3.3.6.1.5
b. Differential 1,2,3 1 F SR 3.3.6.1.2 s 48.9 seconds Flow-Timer SR 3.3.6.1.4 SR 3.3.6. 1.5
c. RWCU Heat Exchanger Area 1.2,3 I per area F SR 3.3. 6.1.1 s 157.0°F I Temperature-High SR 3.3.6.1.2 SR 3.3.6.1.4 SR 3.3.6. 1.5 RWCU Heat Exchanger Area 1,2,3
d. 1 per area F SR 3.3.6.1.1 s 38.5°F I Ventilation Differential SR 3.3.6. 1.2 Temperature-High SR 3.3.6.1.4 SR 3.3.6.1, 5
e. RWCU Pump and Valve Area 1,2,3 1 per area F SR 3.3. 6.1.1 s 209.0°F I Temperature-High SR 3.3.6.1.2 SR 3.3.6. 1.4 SR 3.3.6.1.5
f. RWCU Pump and Valve Area 1,2,3 1 per area F SR 3.3.6.1.1 s 91.0°F I Differential SR 3.3. 6.1.2 Temperature-High SR 3.3.6.1.4 SR 3.3.6.1.5
g. RWCU Holdup Pipe Area 1,2,3 F SR 3.3.6.1.1 s 209.0°F Temperature-High SR 3.3.6.1.2 SR 3.3. 6.1.4 SR 3.3.6. 1.5
h. RWCU Holdup Pipe Area 1,2,3 1 F SR 3.3.6.1.1 s 91.0°F I Ventilation Differential SR 3.3.6. 1.2 Temperature-High SR 3.3.6.1.4 SR 3.3.6.1.5
i. RWCU Filter/ 1,2,3 1 F SR 3.3.6. 1.1 s 209.0°F Demineralizer Valve Room SR 3.3.6. 1.2 Area Temperature-High SR 3.3.6.1 .4 SR 3.3.6.1.5
j. RWCU Filter/ 1,2,3 1 3.3.6.1.1 s 91.0°F F SR I Demineralizer Valve Room SR 3.3.6.1.2 Area Ventilation SR 3.3.6.1.4 Differential SR 3.3.6.1.5 Temperature-High (continued)

(b) Only inputs into one of two trip systems.

LaSalle 1 and 2 3.3.6.1-8 Amendment No. 166/152