MONTHYEARML17173A1392017-06-0909 June 2017 Engine Systems, Inc. - Transmittal of 10CFR21 Reporting of Defects and Non-Compliance - Report No. 10CFR21-0117, Rev. 0 ML15183A0092015-04-0202 April 2015 Photos, Audit Summary, 3/31 to 4/2/15 Audit of Systems, Structures and Equipment at STP Facility; Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 ML13323B2072013-09-16016 September 2013 Attachment 10: CHLE-018, Rev. 2, Results of Bench Tests to Assess Corrosion of Aluminum in STP Containment Conditions. ML13323B2012013-01-22022 January 2013 Attachment 7: CHLE-014, Rev. 2, T2 LBLOCA Test Report. ML13323B2022013-01-15015 January 2013 Attachment 8: CHLE-015, Rev. 3, Summary of Chemical Effects Testing in 2012 for STP GSI-191 License Submittal. ML13323B2002013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Figure 53 Through End ML13323B1992013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Cover Through Figure 52 ML13323B1982012-08-19019 August 2012 Attachment 5: CHLE-010, Rev. 2, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition. ML13323B1942012-08-11011 August 2012 Attachment 3: CHLE-007, Rev. 3, Debris Bed Requirements and Preparation Procedures. ML1112504292011-04-26026 April 2011 Annual Environmental and Annual Radiological Environmental Operating Reports, Part 2 of 2 NOC-AE-11002668, Annual Environmental and Annual Radiological Environmental Operating Reports, Part 1 of 22011-04-26026 April 2011 Annual Environmental and Annual Radiological Environmental Operating Reports, Part 1 of 2 ML0407701682004-04-15015 April 2004 Draft Information Input Photos-Attachment 9 2017-06-09
[Table view] |
Text
Hole at position 9-Right Piece of master rod showing fracture surface Crack Initiation Site Fracture Surface
,Trip
Fracture surface Showing beach marks and "tiger stripes"
DG 22 Being Removed from its Bay at STP
DG22 arrives at EDC and is offloaded to repair shop floor.
DG22 Disassembly Centerframe removal from base.
DG22 Repair 9R repair window complete and machined for door gasket.
DG22 Inspection Rotor removed from generator to inspect stator
DG22 Reassembly Cylinder liner preassembly in block