March 7, 2013
NRC INFORMATION NOTICE 2013-04: SHIELD BUILDING CONCRETE SUBSURFACE LAMINAR CRACKING CAUSED BY MOISTURE INTRUSION AND FREEZING
ADDRESSEES
All holders of an operating license or construction permit for a nuclear power reactor under Title 10 of the Code of Federal Regulations (10 CFR) Part 50, "Domestic Licensing of Production and Utilization Facilities," except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vesse All holders of an operating license for a non-power reactor (research, test reactor, or critical assembly) under 10 CFR Part 50, "Domestic Licensing of Production and Utilization Facilities," except those who have permanently ceased operations. All holders of and applicants for a power reactor early site permit, combined license, standard design certification, standard design approval, or manufacturing license under 10 CFR Part 52, "Licenses, Certifications, and Approvals for Nuclear Power Plants."
PURPOSE
The U.S. Nuclear Regulatory Commission (NRC) is issuing this information notice (IN) to inform addressees of the occurrence of laminar subsurface cracks in the reinforced concrete shield building (SB) of the containment system at the Davis-Besse Nuclear Power Station caused by moisture intrusion and freezin The NRC expects that recipients will review the information for applicability to their facilities and consider actions, as appropriate, to avoid similar problem However, suggestions contained in this IN are not NRC requirements; therefore, no specific action or written response is required. DESCRIPTION OF CIRCUMSTANCES On October, 10 2011, the shield building (SB) of Davis-Besse's containment was cut open to permit removal of the old reactor vessel head and installation of the replacement vessel hea At that time, the licensee discovered subsurface cracking located near the outer rebar mat, which extended to adjacent areas of the SB that have not been modified since original constructio A manual chipping process was applied to the cracked area in an initial attempt to determine the extent of the crack Using this method, crack indications along the vertical edge of the containment access opening essentially disappeared, but a crack at the top horizontal cut for the opening did not disappea The licensee investigated and confirmed, through the use of impulse response (IR) mapping and core boring samples (CBS), that subsurface laminar cracking had occurred along the outer rebar mat in the SB flute shoulder areas and at the top of the SB near the junction with the ML12352A052 IN 2013-04
|
---|
|
list | - Information Notice 2013-01, Emergency Action Level Thresholds Outside The Range Of Radiation Monitors (13 February 2013)
- Information Notice 2013-01, Emergency Action Level Thresholds Outside the Range of Radiation Monitors (13 February 2013)
- Information Notice 2013-02, Issues Potentially Affecting Nuclear Facility Fire Safety (19 March 2013, Topic: Fire Protection Program)
- Information Notice 2013-03, Recent Issue with the Definition of Core Quadrant (5 March 2013)
- Information Notice 2013-03, Recent Issue With the Definition of Core Quadrant (5 March 2013)
- Information Notice 2013-04, Concrete Subsurface Laminar Cracking Caused by Moisture Intrusion and Freezing (7 March 2013, Topic: Nondestructive Examination, Moisture barrier)
- Information Notice 2013-04, Concrete Subsurface Laminar Cracking Caused By Moisture Intrusion and Freezing (7 March 2013)
- Information Notice 2013-05, Battery Expected Life and Its Potential Impact on Surveillance Requirements (19 March 2013, Topic: Emergency Lighting, Nonconservative Technical Specifications)
- Information Notice 2013-06, Issues With Air and Water Interaction in Fire Protection Sprinkler Systems (25 March 2013, Topic: Aging Management, Fire Protection Program)
- Information Notice 2013-06, Issues with Air and Water Interaction in Fire Protection Sprinkler Systems (25 March 2013, Topic: Aging Management, Fire Protection Program)
- Information Notice 2013-07, Premature Degradation of Spent Fuel Storage Cask Structures and Components from Environmental Moisture (16 April 2013)
- Information Notice 2013-08, Enclosulist of Recently Issued FSME Generic Communications (19 March 2013)
- Information Notice 2013-08, EnclosuList of Recently Issued FSME Generic Communications (19 March 2013)
- Information Notice 2013-09, Compressed Flammable Gas Cylinders and Hazards (3 June 2013, Topic: Fire Protection Program)
- Information Notice 2013-10, Programs for Monitoring Boiling-Water Reactor Steam Dryer Integrity (14 June 2013, Topic: Aging Management)
- Information Notice 2013-11, OFFICIAL EXHIBIT - NYS000551-00-BD01 - NRC Information Notice 2013-11: Crack-Like Indication at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes (July 3, 2013) (3 July 2013)
- Information Notice 2013-11, Crack-like Indications at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes (3 July 2013)
- Information Notice 2013-11, Official Exhibit - NYS000551-00-BD01 - NRC Information Notice 2013-11: Crack-Like Indication at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes (July 3, 2013) (3 July 2013)
- Information Notice 2013-12, Improperly Sloped Instrument Sensing Lines (3 July 2013)
- Information Notice 2013-13, Rev.1, Deficiencies with Effluent Radiation Monitoring System Instrumentation (15 April 2015, Topic: Offsite Dose Calculation Manual, Process Control Program, Maintenance Rule Program)
- Information Notice 2013-13, Rev.1, Deficiencies With Effluent Radiation Monitoring System Instrumentation (15 April 2015, Topic: Offsite Dose Calculation Manual, Process Control Program)
- Information Notice 2013-14, Potential Design Deficiency in Motor-Operated Valve Control Circuitry (23 August 2013)
- Information Notice 2013-14, Potential Design Deficiency In Motor-Operated Valve Control Circuitry (23 August 2013)
- Information Notice 2013-15, Willful Misconduct / Record Falsification and Nuclear Safety Culture (23 August 2013, Topic: Chernobyl, Fire Protection Program, Fire Watch, Hourly Fire Watch)
- Information Notice 2013-16, Importance of Verification of Treatment Parameters for High Dose-Rate Remoter Afterloader Administrations (12 August 2013)
- Information Notice 2013-17, Significant Plant Transient Induced by Safety-Related Direct Current Bus Maintenance at Power (6 September 2013, Topic: Safe Shutdown, Fitness for Duty)
- Information Notice 2013-17, Significant Plant Transient Induced By Safety-Related Direct Current Bus Maintenance At Power (6 September 2013, Topic: Safe Shutdown, Fitness for Duty)
- Information Notice 2013-18, Refueling Water Storage Tank Degradation (13 September 2013, Topic: Boric Acid, Aging Management)
- Information Notice 2013-20, Official Exhibit - NYS000538-00-BD01 - NRC Information Notice 2013-20: Steam Generator Channel Head and Tubesheet Degradation (October 3, 2013) (ML13204A143) (3 October 2013, Topic: Boric Acid)
- Information Notice 2013-20, OFFICIAL EXHIBIT - NYS000538-00-BD01 - NRC Information Notice 2013-20: Steam Generator Channel Head and Tubesheet Degradation (October 3, 2013) (ML13204A143) (3 October 2013, Topic: Boric Acid)
- Information Notice 2013-20, Steam Generator Channel Head and Tubesheet Degradation (3 October 2013, Topic: Boric Acid)
- Information Notice 2013-21, Welding Problems during Fabrication of Reactor Plant Components (21 November 2013, Topic: Nondestructive Examination)
- Information Notice 2013-21, Welding Problems During Fabrication of Reactor Plant Components (21 November 2013, Topic: Nondestructive Examination)
|
---|