March 2004 Monthly Operating Report for Beaver Valley, Units 1 & 2
ML041070402
Person / Time
Site: Beaver Valley
Issue date: 04/07/2004
From: Pearce L
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-04-052
Download: ML041070402 (3)


Text

FENOC fsrSey re&rar OperaM oCnpn Beaver Valley Power Station P. 0. Box 4 Shiippingport,PA 15077 L-04-052 April 7, 2004 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit-2 z-Docket No. 50412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and' Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of March, 2004. This information has also been inputted into the INPO Consolidated Data Entry (CDE) System. No regulatory commitments are contained in this submittal.

Respectfully,

\v. Pearce Vice-President BVPS DTJ/jmm Enclosures cc: NRC Regional Office  ::- '  :

King of Prussia, PA' -:.' . . - ._

., ., .,",..,5 Z

OPERATING DATA REPORT DOCKET NO. 50-334 UNIT NAME Beaver Valley 1 DATE April01,2004 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIC March 2004

1. Design Electrical Rating 835.00
2. Maximum Dependable Capacity (MWe-Net) 821.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 2,184.00 170,211.27
4. Number of Hours Generator On-line 744.00 2,184.00 167,681.82
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. NetElectridhl Energy Generated (MWHrs) _ - 590,960.00 1,802,080.00 126,443;452.0 ---

UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments NONE.

1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

SUMMARY

Be -

The Unit began the report period operating at a nominal value of 100% output. On 3/12/04 at 2007 hours0.0232 days <br />0.558 hours <br />0.00332 weeks <br />7.636635e-4 months <br />, the Unit began a power reduction to approximately 90% output in order to clean the Main Unit Condenser waterboxes and to repair any tube leaks. An output of approximately 90%

was achieved at 2130 hours0.0247 days <br />0.592 hours <br />0.00352 weeks <br />8.10465e-4 months <br /> on 3/12/04. The Unit continued to operate at approximately 90%

output while waterbox cleaning and tube leak repair continued. Following the repair of two tube leaks in the "D"waterbox and the cleaning of all four wateboxes in the Main Unit Condenser, the Unit commenced to return to full power at 0103 hours0.00119 days <br />0.0286 hours <br />1.703042e-4 weeks <br />3.91915e-5 months <br /> on 3/28104. A nominal value ot 100%

output was achieved at 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> on 3/28/04. The Unit continued to operate at a nominal value of 100% output for the remainder of the report period.

Page 1 of 1

OPERATING DATA REPORT DOCKET NO. 50-412 UNIT NAME Beaver Valley 2 DATE April 01,2004 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERID March 2004

1. Design Electrical Rating 836.00
2. Maximum Dependable Capacity (MWe-Net) 831.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 2,184.00 119,792.48
4. Number of Hours Generator On-line 744.00 2,184.00 119,048.38
5. Reserve Shutdown Hours 0.00 0.00 0.00 6.NNet'Electrical EnergyG e-rated-(MWHrs) - 629,-418.00 1,847,897.00-93,667,295'CO UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments NONE.

1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

SUMMARY

The Unit operated at a nominal value of 100% output for the entire report period.

Page 1 of 1

Text

FENOC fsrSey re&rar OperaM oCnpn Beaver Valley Power Station P. 0. Box 4 Shiippingport,PA 15077 L-04-052 April 7, 2004 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit-2 z-Docket No. 50412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and' Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of March, 2004. This information has also been inputted into the INPO Consolidated Data Entry (CDE) System. No regulatory commitments are contained in this submittal.

Respectfully,

\v. Pearce Vice-President BVPS DTJ/jmm Enclosures cc: NRC Regional Office  ::- '  :

King of Prussia, PA' -:.' . . - ._

., ., .,",..,5 Z

OPERATING DATA REPORT DOCKET NO. 50-334 UNIT NAME Beaver Valley 1 DATE April01,2004 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIC March 2004

1. Design Electrical Rating 835.00
2. Maximum Dependable Capacity (MWe-Net) 821.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 2,184.00 170,211.27
4. Number of Hours Generator On-line 744.00 2,184.00 167,681.82
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. NetElectridhl Energy Generated (MWHrs) _ - 590,960.00 1,802,080.00 126,443;452.0 ---

UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments NONE.

1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

SUMMARY

Be -

The Unit began the report period operating at a nominal value of 100% output. On 3/12/04 at 2007 hours0.0232 days <br />0.558 hours <br />0.00332 weeks <br />7.636635e-4 months <br />, the Unit began a power reduction to approximately 90% output in order to clean the Main Unit Condenser waterboxes and to repair any tube leaks. An output of approximately 90%

was achieved at 2130 hours0.0247 days <br />0.592 hours <br />0.00352 weeks <br />8.10465e-4 months <br /> on 3/12/04. The Unit continued to operate at approximately 90%

output while waterbox cleaning and tube leak repair continued. Following the repair of two tube leaks in the "D"waterbox and the cleaning of all four wateboxes in the Main Unit Condenser, the Unit commenced to return to full power at 0103 hours0.00119 days <br />0.0286 hours <br />1.703042e-4 weeks <br />3.91915e-5 months <br /> on 3/28104. A nominal value ot 100%

output was achieved at 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> on 3/28/04. The Unit continued to operate at a nominal value of 100% output for the remainder of the report period.

Page 1 of 1

OPERATING DATA REPORT DOCKET NO. 50-412 UNIT NAME Beaver Valley 2 DATE April 01,2004 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERID March 2004

1. Design Electrical Rating 836.00
2. Maximum Dependable Capacity (MWe-Net) 831.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 2,184.00 119,792.48
4. Number of Hours Generator On-line 744.00 2,184.00 119,048.38
5. Reserve Shutdown Hours 0.00 0.00 0.00 6.NNet'Electrical EnergyG e-rated-(MWHrs) - 629,-418.00 1,847,897.00-93,667,295'CO UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments NONE.

1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

SUMMARY

The Unit operated at a nominal value of 100% output for the entire report period.

Page 1 of 1