ML20054L016

From kanterella
Revision as of 14:24, 15 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Ro:Review of Records for Performing Various Reactor Function Checks & Calibrs Indicated Incorrect Interval for Control Rod Drop Times Documented on Record as 12-month Interval Instead of 6-month Interval
ML20054L016
Person / Time
Site: 05000192
Issue date: 06/23/1982
From: Bauer T
TEXAS, UNIV. OF, AUSTIN, TX
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 8207070070
Download: ML20054L016 (1)


Text

O THE UNIVERSITY OF TEX AS COLLEGE OF ENGINEERING AUSTIN, TEX AS 787I2 Department of AledwricalEngineering

& dear Engineering Program 517-ni M M June 23,1982 Region IV USNRC Office of Inspection and Enforcement 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76012

Dear Sir:

RE: R-92 An examination of records for perfonning various reactor function checks and calibrations indicates a variation from Technical Specifica-tions in a recent year. The recording sheet kept for administrative monitorir.g of various checks was developed in 1979. Unfortunately, an incorrect interval for control rod drop times was documented on the record sheet as 12 month interval instead of the required semi-annual check. Review of the sheets indicated that despite the error only one semiannual check of drop times was missed in the fall of 1981. The error on the record sheet for check interval has been corrected and current rod drops times are as scheduled. A review of past rod drop measurements indicate that no significant variations have occurred in the drop times over periods of several years. It is expected that correction of the interval value on the record sheet will suffice to insure continued proper surveillance.

Sincerely yours, X f. h T. L. Bauer

  • l Reactor Supervisor I S0P #3664 1

TLB:mgm hN cc: H. Marcus N -

D. Klein 'd 5 M28 N '

i hL.._ . - - - J-1 O '

05000