Spec for Pressure Testing of Reactor Vessel Head Vent Sys, Revision 0.Actual Procedure Number 37276-1300-00-81
ML20052E812
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/04/1980
From: Snyder T
CATALYTIC, INC. (SUBS. OF AIR PRODUCTS & CHEMICALS
To:
Shared Package
ML17256A898 List:
References
37276-1300--8, 37276-1300-00-8, NUDOCS 8205110448
Download: ML20052E812 (9)


Text

9  %

CATALYTIC, INC.

as ssa-a vsp Enynearme Desertment PLANT: Ginna Nuclear Power Plant CATALYTIC CONTRACT NO. 36720 CLIENT: Rochester Gas & Electric' Corp. SPECIFICATION NO. 37276-1300-00-81 LOCATION: Onenrin- W u Ynrk SPECIFICATION for Pressure Testing of Reactor Vessel Head Vent System CONSISTING.OE O C O il S T P u C T I O N '

E -

s 2ND LEVEL LIMITED CO:ET UCT!O';: ASfl0TED REVIEW

ea stimit
; c - r cyr,ucno:4 COMPLETED Reference _ Attachments: - -

O L' o " -

u;r  ::

_=-_ F0RM REV. ENGR. DATE DATE RELE/ %D F'JR y

cNan. g 4,gg

  1. A/ g,- 4 C

ltem Number Description Safety Related D O

/ Non-Nuclear A

Safety Date- /b lh Approved -

~...,w Appr oved _

.. . /"O ,. .. ...

Date d- 6 - / 9 [r-O Approved Date 4 d- N i

, O L,1, Y A SURANCE E NGIN E E R Prepared By j Date b / 0

" La'ao anoanssa /

0 CD k 4/4/@ 2dt~ w A24' 4/4/so 121 4/4/u

~~

A 8 epod414/76 '

A Approved Date Approved Date Approved Date Approved Date Amendment

~ ~

8205110448 820507 PDR ADOCK 05000244 P PDR ___

CATALYTIC, INC.

te3 0-372c7 ENOlNEERING DEPARTMENT PRESSURE TESTING OF REACTOR SPECIFICATION NO. 37276-1300-00-81 VESSEL HEAD VENT SYSTEM TABLE OF CONTENTS i

SECTION DESCRIPTION PAGE 1.0 SCOPE 1 2.0 APPLICABLE DOCUMENTS 1 3.0 GENERAL 1 4.0 TEST PROCEDURES 2 5.0 PRECAUTIONS 2 6.0 PRESSURE TEST PROCEDURES AND RECORDS 3 7.0 TEST REQUIREMENTS 4 8.0 QUALITY ASSURANCE REQUIREMENTS 5

" PIPING PRESSURE TEST" SHEETS 6

C8he 37%P ENGINEE~ING DEPARTMENT

. PRESSURE TESTING OF REACTOR SPECIFICATION NO. 37276-1300-00-81 VESSEL HEAD VENT SYSTEM Page 1 1.0 SCOPE 1.1 This specification establishes the requirements for testing of ASME Section_III, Class 1 and 2 nuclear and ANSI B31.1 non-nuclear power piping systems for mechanical modifications at Rochester Gas & Elec-tric's Ginna Station.J 2.0 APPLICABLE DOCUMENTS 2.1 The following documents shall be considered as a part of this spec-ification to the extent specified. The specifications, codes and standards shall be the editions specified.

i a. ASME Boiler and Pressure Vessel Code,Section III, 1977 Edition with addenda through Summer 1979.

b. ASME Boiler and Pressure Vessel Code,Section XI, 1977 Edition with addenda through Summer 1979.
c. ANSI Code for Pressure Piping - Section B31.1, " Power

! Piping," 1977 Edition with addenda through Summer 1979.

d. ANSI N45.2.6 - 1978 " Qualification of Inspection, Exami-nation, and Testing Personnel for Nuclear Power Plants."
e. ANSI N45.2.8 - 1975, " Supplementary Quality Assurance Requirements for Installation, Inspection, and Testing of Hechanical Equipment and Systems for the Construction Phase of Nuclear Power Plants."

2.2 Nothing in this specification shall be interpreted as in any way per-mitting deviation from the requirements of the aft;rementioned codes and standards to the extent referenced herein.

3.0 GENERAL 3.1 All hydrostatic tests or initial service leak tests shall be in accordance with the requirements of Articles NB-6000 and NC-6000 of Section III; Paragrayn 137 of B31,1; or Articles IWA-5000, IWB-5000 and IWC-5000 of Section XI, as specified on the attached " Piping Pressure Test" sheets.

3.2 Test personnel shall be qualified in accordance with ANSI N 45.2.6.

3.3 Pressurizing ports and vent valves indicated on Pressure Test-sheets are recommended only. Alternate valves may be used to suit field testing requirements. Special materials shown on Pressure Test sheets are recommended only. Alternate equivalent materials may be used.

. s CATALYTIC, INC.

c o st o-s tr# ENGINEERING DEPARTMENT PRESSURE TESTING OF REACTOR SPECIFICATION No. 37276-1300-00-81

. VESSEL HEAD VENT SYSTEM Page 2 3.4 Gagging of relief valves may be substituted for removal and capping.

4.0 TEST PRESSURES 4.1 Tests shall be conducted at the pressure specified on the attached

" Piping Pressure Test" sheets.

4.2 Retesting of lines after repairs shall be done at pressures origi-nally specified for the test. The same requirements for records (Section 6.0) apply for retests as for original test.

5.0 PRECAUTIONS 5.1 Every precaution shall be taken during testing to insure the safety of the operator. The source of medium for testing shall be provided with calibrated relief valves and gauges to prevent overpressurization of the system being tested. The relief valves shall be set at 106% of test pressure as specified on the attached

" Piping Pressure Test" sheets.

5.2 System pressure gauges shall not be subjected to pressure in excess of their scale range. All pieces of equipment which do not have their test pressures indicated or whose test pressures are below the piping system test pressure shall be excluded from these tests.

5.3 Unless otherwise specified, system pressure relief valves shall be excluded from these tests.

5.4 All welded and flanged joints in the boundary of each test shall have been completed and, if required, non-destructive examined and stress relieved with satisfactory results prior to the performance of that test.

5.5 Before every test, the piping systems shall be visually inspected to assure that there are no visual defects and that all connections are tight, and that all supports are installed.

5.6 No repair welding shall be done on any section of piping that con-tains water, or is under pressure.

5.7 Inadvertent pressurization of any other system shall be avoided by proper valve line-up and venting of adjacent systems. (For valve line-ups, see attached " Piping Pressure Test" sheets).

I

CATALYTIC, INC. f Ce3ss-s n te ENGINEERING DEPARTMENT PRESSURE TESTING OF REACTOR SPECIFICATION NO. 37276-1300-00-81 l VESSEL HEAD VENT SYSTEM Page 3 5.8 Where valves are used for pressure boundary isolation, the valve shall be tagged to prevent unauthorized opening.

5.9 Test blinds shall be installed using gaskets specified on " Piping Pres-sure Test" sheets and shall be fully bolted with the. correct size and number of bolts allowed for by the flange design.

5.10 Suitable precautions shall be taken to eliminate hazards to personnel

'and safety-related equipment in the event of leakage in the proximity of lines being tested.

6.0 PRESSURE TEST PROCEDURES AND RECORDS 6.1 All tests shall be performed in accordance with detailed written procedures and/or checklists which clearly indicate the extent of each test.

6.2 Test pressures shall be maintained a sufficient length of time to permit thorough inspection of all joints. The minimum holding time shall be ten (10) minutes. Inspection shall not begin until after the holding time.

6.3 Test pressures shall not be applied until the piping system and the testing medium have reached thermal equilibrium.

6.4 The results' of all tests shall be recorded in accordance with the applicable specifications and codes. All such information shall be recorded as is required to completely identify the system tested, the results and all the actions taken, including but not necessarily limited to:

a. Line designation number (s)
b. Code or specification used for test
c. Extent of test or test number
d. Type of test
e. Test Pressure
f. Length of time held
g. Ambient and test medium temperature
h. Date of test

- 1. Test by/ witness

j. Results
k. Serial number and calibration date of the test gauge.

6.5 Control valves, unless being used for test boundary, shall be set and maintained in the wide open position.

. . _ . .m - . . - _ . - -

CATALYTIC, INC.

CCCis-37cp gNGINEE2fNG CEPARTMENr 6 PRESSURE TESTING OF REACTOR SPECIFICATION NO. 37276-1300-00-81 VESSEL HEAD VENT SYSTEM Page 4 6.6 Lines containing check valves shall have the pressure applied upstream of the check valve so that pressure is applied under the seat.

6.7 All in-line instruments, gauge glasses, flow meter pots, liquid level float gauges, and all other pressure parts of instruments shall be included in these tests, where feasible.

'6. 8 Test procedures shall be in accordance with ANSI N 45.2.8.

6.9 Initial service leak test, if specified on the " Piping Pressure Test" sheets, shall be conducted in the same manner as hydrostatic leak test except that the system need not be totally isolated as long as test pressure can be maintained.

7.0 TEST REQUIREMENTS 7.1 A test pump shall be available that is capable of at least 120%

of test p. essure.

7.2 Test pumps shall be used and controlled such that no pump that was used to pressurize oil / hydraulic systems will be used on water sys-tems or vice versa. Prior to connecting the test pump to a system, the pump and any hoses associated with it shall be flushed to ensure that the pump discharge will meet the hydro cleanliness requirements of the applicable specification.

7.3 An " official" test pressure gauge shall be installed on the test pump discharge line. This gauge shall be calibrated prior to test and have a range between 1 and 3 times the test pressure. This gauge shall be visible to the person controlling the pump.

7.4 Systems shall be vented during filling by use of vents provided for the purpose or by loosening flanged joints or instrument connections.

Small lines may be cleared of air by flushing with water.

7.5 Prior to application of pressure, water temperature shall be 60 F.

minimum and 100 F. maximum.

7.6 Demineralized water shall be used for testing.

I 7.7 Lines that are spring or counterweight supported and all gas and vapor lines shall be temporarily supported during test in order to support the hydrostatic load, if specified on the attached

" Piping Pressure Test" sheets.

7.8 System shall be brought up to test pressure slowly.

7.9 Test pressure shall be maintained a minimum of ten minutes before visual examination of joints begins, and then shall be maintained until all joints are examined.

l

CATALYTIC, INC.

, , selle anse ENGINEERING CEPARTMENT

. PRESSURE TESTING OF REACTOR SPECIFICATION NO. 37276-1300-00-81 VESSEL HEAD VENT SYSTEM Page 5 7.10 During the tests, hydrostatic pressures shall be monitored and corrections shall be made to compensate for thermal expansion or contraction. By this procedure the test pressure shall be kept between 100% and 105% of its intended value.

I 7.11 Acceptance Criteria 7.11.1 Following the application of the hydrostatic test pressure for a minimum of ten (10) minutes, visual examination for weeping or leaking shall be made of all joints and connections, and of all regions of high stress, such as regions around openings and thick-ness-transition section. The piping system exclusive of possible localized instances, such as at a pump or valve packing, shall show no visual evidence of weeping or leaking. Weeping or leaking at pump or valve packing shall be noted and evaluated after the test.

Wetting of s flanged joint gasket is acceptable; however, if weep-ing or leaking persists to a point where the tes't medium contin-ually flows, the joint shall be rejected.

7.12 Joints found to be defective shall be repaired and retested.

7.13 Tested systems shall be vented and drained immediately upon success-ful completion of the test and shall be blown dry with clean, oil free, dry air or nitrogen.

8.0 QUALITY ASSURANCE REQUIRDIENTS 8.1 Testing of Seismic Category I piping systems (as indicated on drawings) shall be in accordance with the Quality Assurance re-quirements of Rochester Gas & Electric Corporation.

l t

T CATALYTIC, INC.

. . esit tes ? M P EleOINEEDNG DEPAftTMENT PIPING PRESSURE TEST #1 SPECIFICATION NO. 37276-1300-00-81 Page 6 TEST TYPE: Hydrostatic TEST PRESSURE: 3125 PSIG + 150 PSIG O PSIG SYSTEM: Reactor Vessel Head Vent TEST MEDIUM: Demineralized Water i

EWR: 2447 APPLICABLE CODES: ASME III and ASME XI REF. DWG.: A-13651 VALVE LINE-UP: ,.

SV-590 Closed SV-591 Closed SV-592 Open

( SV-593 Open 3/4"-T58 Closed PREREQUISITES:

1. Electric power required to open solenoid valves.
2. Verify t hat electric power to SV-590 and SV-591 is locked out af ter vent-ing system.

,SPECIAL Mf.TERIALS:

1. 3/4" 2500 lb. S.O. flange, R.F., ASTM A105, ANSI B16.5.

, 2. 3/4" dia. x 6" long nipple, ASTM A106, Grade B, threaded one end, plain ene end, schedule 160 wall.

3. 3/4" 2500 lb. spiral wound gasket, 304 S.S., asbestos filled, Flexitallic type CG or equal.

SPECIAL INSTRUCTIONS:

1. This piping is Seismic Category I and test procedures must comply with RG&E Quality Assurance requirements.

83 I RV W V- lo 3- l '- D5' 6 ",

/ g,yi4 v- i o4 -1 "-og7 s i

e G

s OPEN tdHILE FILLIN G(To  ;

VEVT) AND CLOSE DUR)N(s- ,rANST 631.1

]

SV-591 TEST.

5V-590 " ASMEN CL 2 9

e SV-593 sy_g g gg 25

  • 3 open rog \./ OPEN FOR ;p g 5.5 P>arlRE TEST- %R sE en riRE TEST ..
  • m :;;

H jo 2

~

REMOVE EXIST BLIND y A5ME III CLA% 2- (TYP. ) 0 p"

F LG- AN D JNSTAt L TEMP -1 gggg a4g i

=

% 2500 LB 5.0 FLG WITH #8 '

% " DI A x (,' LG N IPPLE _

FROM REACTOR.

(oNE END THREADED), RHV-LOO-% *-K3N I O CONMECT TEST PUMP ro NET EXIST- Y CloSE' FOR ENTIRC y TttRD N) PPLE. ' RE PLACE asT p i

BLIN D FLG AFTER TEST, o

?

D/AGF<.AM OF RVW\/ SYSTEM TEST-

.- . . _ _ _ _ _ .