ML17277B035

From kanterella
Revision as of 22:03, 7 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Procedure to Ensure Operability of ESF Sys Following Removal from Svc Per NUREG-0737,Items II.K.1.10 & II.K.1.5.Confirmatory Issue 22 Considered Closed
Date released: 06/27/2018 Download: ML17277B035


Rev 6 to Administrative Procedure 1.5.1, Tech Spec Surveillance Testing Program.
ML17277B042
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/07/1983
From: Martin J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
References
Download: ML17277B042 (33)
Rev 3 to Administrative Procedure 1.3.9, Control of Electrical & Mechanical Jumpers & Lifted Leads.
ML17277B041
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/31/1983
From: Martin J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
References
Download: ML17277B041 (16)
Rev 6 to Administrative Procedure 1.3.8, Equipment Clearance & Tagging.
ML17277B040
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/07/1983
From: Martin J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
References
Download: ML17277B040 (32)
Rev 4 to Administrative Procedure 1.3.7, Maint Work Request.
ML17277B039
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/31/1983
From: Martin J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
References
Download: ML17277B039 (40)
Rev 2 to Administrative Procedure 1.3.6, Shift Turnover.
ML17277B038
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/15/1983
From:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
References
Download: ML17277B038 (12)
Rev 2 to Administrative Procedure 1.3.4, Operating Data Logs.
ML17277B037
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/30/1983
From: Martin J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
References
Download: ML17277B037 (15)
Rev 5 to Administrative Procedure 1.3.1, Standing Orders/ Night Orders.
ML17277B036
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/07/1983
From: Martin J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
References
Download: ML17277B036 (8)
Forwards Procedure to Ensure Operability of ESF Sys Following Removal from Svc Per NUREG-0737,Items II.K.1.10 & II.K.1.5.Confirmatory Issue 22 Considered Closed
ML17277B034
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/11/1983
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: SCHWENCER A
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.K.1, TASK-TM
Download: ML17277B034 (5)