ML18003A653

From kanterella
Revision as of 18:40, 6 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Interim Rept Re Deficiencies in Procurement, Fabrication & Insp of Engineered Plates for Concrete Embedment & Support of safety-related Loads.Final Rept to Be Submitted by 791102
Date released: 08/31/2018 Download: ML18003A653


Interim Rept Re Deficiencies in Procurement,Fabrication & Insp of Engineered Plates for Concrete Embedment & Support of safety-related Loads.Caused by Misinterpretation of Design Documents by Site & Vendor Personnel
ML18003A654
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/04/1979
From:
CAROLINA POWER & LIGHT CO.
To:
References
Download: ML18003A654 (5)
Forwards Interim Rept Re Deficiencies in Procurement, Fabrication & Insp of Engineered Plates for Concrete Embedment & Support of safety-related Loads.Final Rept to Be Submitted by 791102
ML18003A652
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/05/1979
From: Chiangi N
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18003A652 (3)