ML18017A614

From kanterella
Revision as of 15:55, 6 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Final Deficiency Rept Re Failure to post-weld Heat Treat Containment Mechanical Penetration Assemblies
Date released: 08/31/2018 Download: ML18017A614


Final Deficiency Rept Re Failure to post-weld Heat Treat Containment Mechanical Penetration Assemblies.Eleven Penetrations stress-relieved on 790608-09.All Required Documentation Performed
ML18017A615
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/03/1979
From:
CAROLINA POWER & LIGHT CO.
To:
References
Download: ML18017A615 (11)
Forwards Final Deficiency Rept Re Failure to post-weld Heat Treat Containment Mechanical Penetration Assemblies
ML18017A613
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/03/1979
From: Chiangi N
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18017A613 (2)