ML18225A335
From kanterella
ML18225A335 | |
Person / Time | |
---|---|
Site: | 05200046 |
Issue date: | 08/13/2018 |
From: | Korea Electric Power Corp, Korea Hydro & Nuclear Power Co, Ltd |
To: | Office of New Reactors |
Shared Package | |
ML18225A333 | List: |
References | |
APR1400-K-X-ER-14001-NP, Rev 2 | |
Download: ML18225A335 (252) | |
Similar Documents at 05200046 | |
---|---|
Category:Environmental Monitoring Report
MONTHYEARML18225A3352018-08-13013 August 2018
[Table view]APR1400-K-X-ER-14001-NP, Rev. 2, Applicant'S Environmental Report - Standard Design Certification. 2018-08-13 Category:Report MONTHYEARML18235A1562018-08-31031 August 2018
[Table view]APR1400-E-P-NR-14006-NP, Rev. 2, Severe Accident Mitigation Design Alternatives (Samdas) for the APR1400. ML18235A1072018-08-31031 August 2018 APR1400-K-O-NR-14001-NP, Rev. 3, Deviation Report Between NUREG-1432 Rev. 4.0 and APR1400 Technical Specifications. ML18225A3352018-08-13013 August 2018 APR1400-K-X-ER-14001-NP, Rev. 2, Applicant'S Environmental Report - Standard Design Certification. ML18212A3452018-07-31031 July 2018 APR1400-E-I-NR-14001-NP, Rev. 4, Human Factors Engineering Program Plan. ML18214A5632018-07-31031 July 2018 Enclosure 9 to MKD/NW-18-0107L, APR1400-E-X-NR-14001-NP, Revision 4, Equipment Qualification Program ML18225A3402018-07-31031 July 2018 APR1400-Z-A-NR-14019-NP, Rev. 3, CCF Coping Analysis. ML18199A5632018-06-30030 June 2018 CPC Setpoint Analysis Methodology for APR1400, Revision 3 ML18199A5652018-06-30030 June 2018 Loss of Large Area Analysis Report, Revision 2 ML18214A5572018-05-31031 May 2018 Enclosure 3 to MKD/NW-18-0107L, APR1400-Z-J-NR-14002-NP, Revision 3, Diversity and Defense-in-Depth ML18178A2202018-05-31031 May 2018 Enclosure 23 - APR1400-E-X-NR-14001-NP, Rev. 3, Equipment Qualification Program ML18212A3432018-05-31031 May 2018 APR1400-Z-J-NR-14012-NP, Rev. 3, Control System CCF Analysis. ML18212A3412018-05-31031 May 2018 APR1400-Z-J-NR-14001-NP, Rev. 3, Safety I&C System. ML18212A3382018-05-31031 May 2018 APR1400-Z-A-NR-14007-NP, Rev. 2, Mass and Energy Release Methodologies for LOCA and Mslb. ML18178A2242018-05-31031 May 2018 Enclosure 9 - APR1400-E-I-NR-14006-NP, Rev. 3, Treatment of Important Human Actions Implementation Plan ML18178A2232018-05-31031 May 2018 Enclosure 7 - APR1400-E-I-NR-14004-NP, Rev. 3, Task Analysis Implementation Plan ML18178A2222018-05-31031 May 2018 Enclosure 5 - APR1400-E-I-NR-14001-NP, Rev. 3, Human Factors Engineering Program Plan ML18178A2212018-05-31031 May 2018 Enclosure 3 - APR1400-E-S-NR-14006-NP, Rev. 5, Stability Check for Ni Common Basemat ML18214A5592018-05-31031 May 2018 Enclosure 5 to MKD/NW-18-0107L, APR1400-Z-J-NR-14003-NP, Revision 3, Software Program Manual ML18214A5612018-05-31031 May 2018 Enclosure 7 to MKD/NW-18-0107L, APR1400-Z-A-NR-14011-NP, Revision 3, Criticality Analysis of New and Spent Fuel Storage Racks ML18178A2172018-05-31031 May 2018 Enclosure 19 - APR1400-E-B-NR-16002-NP, Rev. 1, Evaluation of Safety Injection and Shutdown Cooling Piping Applied to the Graded Approach for the APR1400 ML18178A2142018-05-31031 May 2018 Enclosure 15 - APR1400-E-I-NR-14011-NP, Rev. 3, Basic Human-System Interface ML18178A2132018-05-31031 May 2018 Enclosure 13 - APR1400-E-I-NR-14008-NP, Rev. 3, Human Factors Verification and Validation Implementation Plan ML18178A2122018-05-31031 May 2018 Enclosure 11 - APR1400-E-I-NR-14007-NP, Rev. 3, Human-System Interface Design Implementation Plan ML18120A2882018-04-30030 April 2018 APR1400-E-E-NR-14001-NP, Rev.4, Onsite AC Power System Analysis. ML18102B3382018-04-12012 April 2018 APR1400-K-O-NR-14001-NP, Rev. 2, Deviation Report Between NUREG-1432 Rev. 4.0 and APR1400 Technical Specifications. ML18086B7502018-03-27027 March 2018 APR1400-E-N-NR-14005-NP, Rev. 1, Shutdown Evaluation Report ML18067A8562018-03-0808 March 2018 APR1400-E-E-NR-14001-NP, Rev.3, Onsite AC Power System Analysis. ML18067A8542018-03-0808 March 2018 APR1400-E-X-NR-14001-NP, Rev.2, Equipment Qualification Program. ML18057B5292018-02-28028 February 2018 APR1400-E-P-NR-14006-NP, Rev. 1, Severe Accident Mitigation Design Alternatives (Samdas) for the APR1400. ML18057B5322018-02-28028 February 2018 APR1400-E-N-NR-14001-NP, Rev.3, Design Features to Address GSI-191. ML18087A1082018-01-31031 January 2018 Enclosure 13 - APR1400-Z-J-NR-14012-NP, Rev. 2, Control System CCF Analysis ML18081A0822018-01-31031 January 2018 APR1400-E-I-NR-14006-NP, Rev.2, Treatment of Important Human Actions Implementation Plan ML18081A0842018-01-31031 January 2018 APR1400-E-I-NR-14007-NP, Rev.2, Human-System Interface Design Implementation Plan ML18081A0862018-01-31031 January 2018 APR1400-E-I-NR-14008-NP, Rev. 2, Human Factors Verification and Validation Implementation Plan ML18081A0882018-01-31031 January 2018 APR1400-E-I-NR-14010-NP, Rev.2, Human Factors Verification and Validation Scenarios ML18081A0902018-01-31031 January 2018 APR1400-E-I-NR-14011-NP, Rev. 2, Basic Human-System Interface ML18081A0912018-01-31031 January 2018 APR1400-E-I-NR-14003-NP, Rev. 2, Functional Requirements Analysis and Function Allocation Implementation Plan ML18081A0932018-01-31031 January 2018 APR1400-E-I-NR-14004-NP, Rev.2, Task Analysis Implementation Plan ML18081A0962018-01-31031 January 2018 APR1400-E-I-NR-14012-NP, Rev. 2, Style Guide ML18081A0982018-01-31031 January 2018 APR1400-E-P-NR-14003-NP, Rev. 2, Severe Accident Analysis Report ML18081A0992018-01-31031 January 2018 APR1400-E-I-NR-14001-NP, Rev.2, Human Factors Engineering Program Plan ML18081A1012018-01-31031 January 2018 APR1400-E-I-NR-14002-NP, Rev.2, Operating Experience Review Implementation Plan ML18087A1122018-01-31031 January 2018 Enclosure 17 - APR1400-Z-M-NR-14008-NP, Rev. 1, Pressure-Temperature Limits Methodology for RCS Heatup and Cooldown ML18086B7572018-01-31031 January 2018 APR1400-Z-J-NR-14004-NP, Rev. 2, Uncertainty Methodology and Application for Instrumentation ML18086B7592018-01-31031 January 2018 APR1400-Z-J-NR-14002-NP, Rev. 2, Diversity and Defense-in-Depth ML18087A1102018-01-31031 January 2018 Enclosure 15 - APR1400-Z-J-NR-14013-NP, Rev. 2, Response Time Analysis of Safety I&C System ML18087A1142018-01-31031 January 2018 Enclosure 19 - APR1400-Z-M-NR-14016-NP, Rev. 1, Leak-Before-Break Evaluation of the Surge Line ML18087A1172018-01-31031 January 2018 Enclosure 21 - APR1400-Z-A-NR-14020-NP, Rev. 0, Pressurizer Sizing and Overpressure Protection Evaluation ML18087A1192018-01-31031 January 2018 Enclosure 3 - APR1400-Z-A-NR-14011-NP, Rev. 2, Criticality Analysis of New and Spent Fuel Storage Racks. ML18087A1212018-01-31031 January 2018 Enclosure 5 - APR1400-Z-A-NR-14014-NP, Rev. 1, ATWS Evaluation 2018-08-31 Category:Technical MONTHYEARML18235A1562018-08-31031 August 2018
[Table view]APR1400-E-P-NR-14006-NP, Rev. 2, Severe Accident Mitigation Design Alternatives (Samdas) for the APR1400. ML18235A1072018-08-31031 August 2018 APR1400-K-O-NR-14001-NP, Rev. 3, Deviation Report Between NUREG-1432 Rev. 4.0 and APR1400 Technical Specifications. ML18225A3352018-08-13013 August 2018 APR1400-K-X-ER-14001-NP, Rev. 2, Applicant'S Environmental Report - Standard Design Certification. ML18212A3452018-07-31031 July 2018 APR1400-E-I-NR-14001-NP, Rev. 4, Human Factors Engineering Program Plan. ML18214A5632018-07-31031 July 2018 Enclosure 9 to MKD/NW-18-0107L, APR1400-E-X-NR-14001-NP, Revision 4, Equipment Qualification Program ML18225A3402018-07-31031 July 2018 APR1400-Z-A-NR-14019-NP, Rev. 3, CCF Coping Analysis. ML18199A5632018-06-30030 June 2018 CPC Setpoint Analysis Methodology for APR1400, Revision 3 ML18199A5652018-06-30030 June 2018 Loss of Large Area Analysis Report, Revision 2 ML18214A5572018-05-31031 May 2018 Enclosure 3 to MKD/NW-18-0107L, APR1400-Z-J-NR-14002-NP, Revision 3, Diversity and Defense-in-Depth ML18178A2202018-05-31031 May 2018 Enclosure 23 - APR1400-E-X-NR-14001-NP, Rev. 3, Equipment Qualification Program ML18212A3432018-05-31031 May 2018 APR1400-Z-J-NR-14012-NP, Rev. 3, Control System CCF Analysis. ML18212A3412018-05-31031 May 2018 APR1400-Z-J-NR-14001-NP, Rev. 3, Safety I&C System. ML18212A3382018-05-31031 May 2018 APR1400-Z-A-NR-14007-NP, Rev. 2, Mass and Energy Release Methodologies for LOCA and Mslb. ML18178A2242018-05-31031 May 2018 Enclosure 9 - APR1400-E-I-NR-14006-NP, Rev. 3, Treatment of Important Human Actions Implementation Plan ML18178A2232018-05-31031 May 2018 Enclosure 7 - APR1400-E-I-NR-14004-NP, Rev. 3, Task Analysis Implementation Plan ML18178A2222018-05-31031 May 2018 Enclosure 5 - APR1400-E-I-NR-14001-NP, Rev. 3, Human Factors Engineering Program Plan ML18178A2212018-05-31031 May 2018 Enclosure 3 - APR1400-E-S-NR-14006-NP, Rev. 5, Stability Check for Ni Common Basemat ML18214A5592018-05-31031 May 2018 Enclosure 5 to MKD/NW-18-0107L, APR1400-Z-J-NR-14003-NP, Revision 3, Software Program Manual ML18214A5612018-05-31031 May 2018 Enclosure 7 to MKD/NW-18-0107L, APR1400-Z-A-NR-14011-NP, Revision 3, Criticality Analysis of New and Spent Fuel Storage Racks ML18178A2172018-05-31031 May 2018 Enclosure 19 - APR1400-E-B-NR-16002-NP, Rev. 1, Evaluation of Safety Injection and Shutdown Cooling Piping Applied to the Graded Approach for the APR1400 ML18178A2142018-05-31031 May 2018 Enclosure 15 - APR1400-E-I-NR-14011-NP, Rev. 3, Basic Human-System Interface ML18178A2132018-05-31031 May 2018 Enclosure 13 - APR1400-E-I-NR-14008-NP, Rev. 3, Human Factors Verification and Validation Implementation Plan ML18178A2122018-05-31031 May 2018 Enclosure 11 - APR1400-E-I-NR-14007-NP, Rev. 3, Human-System Interface Design Implementation Plan ML18120A2882018-04-30030 April 2018 APR1400-E-E-NR-14001-NP, Rev.4, Onsite AC Power System Analysis. ML18102B3382018-04-12012 April 2018 APR1400-K-O-NR-14001-NP, Rev. 2, Deviation Report Between NUREG-1432 Rev. 4.0 and APR1400 Technical Specifications. ML18086B7502018-03-27027 March 2018 APR1400-E-N-NR-14005-NP, Rev. 1, Shutdown Evaluation Report ML18067A8562018-03-0808 March 2018 APR1400-E-E-NR-14001-NP, Rev.3, Onsite AC Power System Analysis. ML18067A8542018-03-0808 March 2018 APR1400-E-X-NR-14001-NP, Rev.2, Equipment Qualification Program. ML18057B5292018-02-28028 February 2018 APR1400-E-P-NR-14006-NP, Rev. 1, Severe Accident Mitigation Design Alternatives (Samdas) for the APR1400. ML18057B5322018-02-28028 February 2018 APR1400-E-N-NR-14001-NP, Rev.3, Design Features to Address GSI-191. ML18087A1082018-01-31031 January 2018 Enclosure 13 - APR1400-Z-J-NR-14012-NP, Rev. 2, Control System CCF Analysis ML18081A0822018-01-31031 January 2018 APR1400-E-I-NR-14006-NP, Rev.2, Treatment of Important Human Actions Implementation Plan ML18081A0842018-01-31031 January 2018 APR1400-E-I-NR-14007-NP, Rev.2, Human-System Interface Design Implementation Plan ML18081A0862018-01-31031 January 2018 APR1400-E-I-NR-14008-NP, Rev. 2, Human Factors Verification and Validation Implementation Plan ML18081A0882018-01-31031 January 2018 APR1400-E-I-NR-14010-NP, Rev.2, Human Factors Verification and Validation Scenarios ML18081A0902018-01-31031 January 2018 APR1400-E-I-NR-14011-NP, Rev. 2, Basic Human-System Interface ML18081A0912018-01-31031 January 2018 APR1400-E-I-NR-14003-NP, Rev. 2, Functional Requirements Analysis and Function Allocation Implementation Plan ML18081A0932018-01-31031 January 2018 APR1400-E-I-NR-14004-NP, Rev.2, Task Analysis Implementation Plan ML18081A0962018-01-31031 January 2018 APR1400-E-I-NR-14012-NP, Rev. 2, Style Guide ML18081A0982018-01-31031 January 2018 APR1400-E-P-NR-14003-NP, Rev. 2, Severe Accident Analysis Report ML18081A0992018-01-31031 January 2018 APR1400-E-I-NR-14001-NP, Rev.2, Human Factors Engineering Program Plan ML18081A1012018-01-31031 January 2018 APR1400-E-I-NR-14002-NP, Rev.2, Operating Experience Review Implementation Plan ML18087A1122018-01-31031 January 2018 Enclosure 17 - APR1400-Z-M-NR-14008-NP, Rev. 1, Pressure-Temperature Limits Methodology for RCS Heatup and Cooldown ML18086B7572018-01-31031 January 2018 APR1400-Z-J-NR-14004-NP, Rev. 2, Uncertainty Methodology and Application for Instrumentation ML18086B7592018-01-31031 January 2018 APR1400-Z-J-NR-14002-NP, Rev. 2, Diversity and Defense-in-Depth ML18087A1102018-01-31031 January 2018 Enclosure 15 - APR1400-Z-J-NR-14013-NP, Rev. 2, Response Time Analysis of Safety I&C System ML18087A1142018-01-31031 January 2018 Enclosure 19 - APR1400-Z-M-NR-14016-NP, Rev. 1, Leak-Before-Break Evaluation of the Surge Line ML18087A1172018-01-31031 January 2018 Enclosure 21 - APR1400-Z-A-NR-14020-NP, Rev. 0, Pressurizer Sizing and Overpressure Protection Evaluation ML18087A1192018-01-31031 January 2018 Enclosure 3 - APR1400-Z-A-NR-14011-NP, Rev. 2, Criticality Analysis of New and Spent Fuel Storage Racks. ML18087A1212018-01-31031 January 2018 Enclosure 5 - APR1400-Z-A-NR-14014-NP, Rev. 1, ATWS Evaluation 2018-08-31 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML18225A335&oldid=2527548"