ML20010F885

From kanterella
Revision as of 21:53, 27 February 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Alternative Motion for OL Authorizing Loading Fuel, Proceeding to Initial Criticality,Performing Startup Tests & Testing at 5% Power.Motion Is Alternative If ASLB Considers Record Inadequate to Support Full Power OL
Date released: 01/24/2020 Download: ML20010F885


Memorandum of Points & Authorities Supporting Applicants 810831 Alternative Motion for Fuel Loading & Low Power Testing Ol.Delay in Commencement of Low Power Testing Will Mean Addl Expenses to Ratepayers.Certificate of Svc Encl
ML20010F887
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 08/31/1981
From: Pigott D
ORRICK, HERRINGTON & SUTCLIFFE, SAN DIEGO GAS & ELECTRIC CO., SOUTHERN CALIFORNIA EDISON CO.
To:
Atomic Safety and Licensing Board Panel
References
Download: ML20010F887 (29)
Alternative Motion for OL Authorizing Loading Fuel, Proceeding to Initial Criticality,Performing Startup Tests & Testing at 5% Power.Motion Is Alternative If ASLB Considers Record Inadequate to Support Full Power OL
ML20010F883
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 08/31/1981
From: Pigott D
ORRICK, HERRINGTON & SUTCLIFFE, SAN DIEGO GAS & ELECTRIC CO., SOUTHERN CALIFORNIA EDISON CO.
To:
Atomic Safety and Licensing Board Panel
References
Download: ML20010F883 (4)