ML20011D474

From kanterella
Revision as of 16:23, 27 February 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rev 1 to 03-0920-1186, Pipe Rupture Analysis Criteria Outside Reactor Bldg Crystal River Unit 3. High Energy Line break-related Mods Remain on Schedule for Completion by End of Refuel 7
Date released: 01/25/2020 Download: ML20011D474


Rev 1 to Pipe Rupture Analysis Criteria Outside Reactor Bldg Crystal River Unit 3.
ML20011D478
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/07/1989
From: Peltola D
ABB IMPELL CORP. (FORMERLY IMPELL CORP.)
To:
References
Download: ML20011D478 (48)
Forwards Rev 1 to 03-0920-1186, Pipe Rupture Analysis Criteria Outside Reactor Bldg Crystal River Unit 3. High Energy Line break-related Mods Remain on Schedule for Completion by End of Refuel 7
ML20011D473
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/18/1989
From: Ken Wilson
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML20011D473 (2)