ML20023C467

From kanterella
Revision as of 12:00, 27 February 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 83-017/03L-0
Date released: 02/06/2020 Download: ML20023C467


LER 83-017/03L-0:on 830405,during Draining of Refueling Cavity RHR (Nd) Pumps Began to Cavitate & Eventually Both Nd Pumps Stopped.Caused by Level Gauge Isolation.Cavity Refilled.Nd Sys Vented.Procedures Revised
ML20023C469
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 05/05/1983
From: Nardoci P
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20023C469 (1)
Forwards LER 83-017/03L-0
ML20023C466
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 05/05/1983
From: Tucker H
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20023C466 (1)