Interim Deficiency Rept Re Effect of Recent Seismic Reanalysis Data on Seismic Qualification of Certain Equipment.Bechtel,Eds Nuclear & Util Conducting Addl Tests to Be Completed by 820615
ML20038B510
Person / Time
Site: Hope Creek, 05000355  PSEG icon.png
Issue date: 11/25/1981
From: Martin T
Public Service Enterprise Group
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8112080354
Download: ML20038B510 (2)


Text

. ,w

( l: U  ;) c> c - r V Thomas J. Martin Public Service Electric and Gas Corr.pany 80 Park P!aza Newark, N.J. 07101 201/430B316 e nI$nIab cor.struction Mailing Address: P.O. Box 570, Newark, N.J. 07101 November 25, 1981 56 - 3.'i'!

fv ,:3,f d '

Mr. Ronald C. Haynes U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement ag .

Region I s y- ' ~</

631 Park Avenue /py' e '. 'i King of Prussia, Pennsylvania 19406 7-f gCg{3<;,

~

.~~, '

(

Dear Mr. Haynes:

\ <. ', S i- y. T6 5<' ,'l AUXILIARY BUILDING SEISMIC ANALYSIS \! E , G3

t za!

POTENTIAL 10 CPR 50.55(e)  %% ,J SIGNIFICANT DEFICIENCY 9 NO. 1 AND 2 UNITS HOPE CREEK GENERATING STATION On October 29, 1981, a verbal report was made to Region I, Office of Inspection and Enforcement representative, Mr. S.

Ebneter, advising of a potential significant deficiency.

The reported potential concerns the effect of recent seismic reanalysis data upon the seismic qualification of certain equipment within the Auxiliary Building at the Hope Creek Generating Station.

The following information is submitted as an interim report in accordance with the requirements of 10 CFR 50.55(e).

The Bechtel Power Corporation (PSE&G's Architect Engineer),

EDS Nuclear (PSE&G's seismic consultant), and Public Service are conducting additional studies to determine the actual impact, if any, on the Auxiliary Building equipment. The estimated completion date of the studies is June 15, 1982, at which time a final report addressing the reportability of this item will be made to the NRC.

Very truly yours,

/' W 6

'$\

9112080354 811125 PDR ADOCK 05000354 G PDR 1 3[/

/j r

?

Mr. Ronald C. Haynes 11/25/81 CC: Office of Inspection and Enforcement Division of Reactor Construction - Inspection Washington, D.C.

NRC Resident Inspector - Hope Creek P. O. Box 241 Hancocks Bridge, NJ 08038 BLl6 1/2

.