OPPD Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendations 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
ML13228A098
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 08/15/2013
From: Cortopassi L
Omaha Public Power District
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
LIC-13-0102
Download: ML13228A098 (12)


Text

444 South 16th Street Mall Omaha, NE 68102-2247 August 15, 2013 LIC-13-0102 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

References:

1. Docket No. 50-285
2. Letter from NRC (E. J. Leeds & M. R. Johnson) to OPPD (D. J. Bannister),

"Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated March 12, 2012 (ML12053A340) (NRC-12-0021)

3. Letter from OPPD (L. P. Cortopassi) to NRC (Document Control Desk),

"OPPD 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated November 27, 2012 (ML12334A449) (LlC-12-0170)

Subject:

OPPD Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendations 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident On March 12, 2012, the NRC issued Reference 2 to all power reactor licensees and holders of construction permits in active or deferred status. Enclosure 4 of Reference 2 requested that each licensee perform flood protection walkdowns and report the results within 180 days of NRC endorsement of the flooding walkdown procedure (NEI 12-07). OPPD completed the flood protection walkdowns at Fort Calhoun Station (FCS) and submitted the results in Reference 3.

As noted on page 12 of Enclosure 1 of Reference 3, sixty-four (64) open items were identified where restricted access prevented walkdown of certain flood protection features. Walkdowns of the restricted access items have been completed and the attachment to this letter provides the results. This submittal closes all the open items in Reference 3.

The attached table provides a list of the restricted access items inspected, their respective disposition, and any action planned or taken. As a result of the inspections:

There were no additional deficiencies found in the supplemental walkdown.

Available Physical Margin (APM) was collected and documented in the walkdown record forms for each applicable item inspected.

All restricted access items inspected were within the plant maintenance and monitoring programs.

Employment with Equal Opportunity

U.S. Nuclear Regulatory Commission LlC-13-0102 Page 2

  • None of the restricted access items were reclassified as inaccessible.

If you should you have questions, please contact Mr. Bill Hansher at (402) 533-6894.

No commitments to the NRC are contained in this letter.

I declare under penalty of perjury that the foregoing is true and correct. Executed on August 12, 2013.

Louis P. Cortopassi Site Vice President and CNO LPC/JKG/mle Attachment Flooding Walkdown - Restricted Access Items c: E. J. Leeds, Director, Office of Nuclear Reactor Regulation S. A. Reynolds, Acting NRC Regional Administrator, Region IV J. M. Sebrosky, NRC Senior Project Manager L. E. Wilkins, NRC Project Manager J. C. Kirkland, NRC Senior Resident Inspector

LIC-13-0102 Attachment Page 1 Fort Calhoun Station Flooding Walkdown - Restricted Access Items Item Feature ID/ Description Bldg./Area CLB Room Other Feature/Barrier CLB Deficiency Deficiency Actions Inaccessible?

Procedure Feature Description Type Flood (yes/no) Description Taken or (yes/no, if No. Elevation (if any) El. At Planned yes, explain Feature below) 1 IS-E-07 CW-14 IS- Intake 1004'-6" IS - Intake CW-14 Conduit Incorporated or 1014 ft. No N/A None No Conduit Structure Structure Penetration from Exterior Penetration Control Station to Passive (IEP) from Control Motor Station to Motor 2 IS-E-08 CW-14E IS- Intake 1004'-6" IS-CELL - CW-14E Conduit Incorporated or 1014 ft. No N/A None No Conduit Structure Intake Penetration Power Exterior Penetration Structure, from Cable Tray Passive (IEP)

Power from Intake Cell to Motor Cable Tray Space to Motor 3 IS-E-09 CW-14D IS- Intake 1004'-6" IS - Intake CW-14D Conduit Incorporated or 1014 ft. No N/A None No Conduit Structure Structure Penetration from Exterior Penetration Control Station to Passive (IEP) from Control Motor Station to Motor 4 IS-E-10 CW-14D IS- Intake 1004'-6" IS-CELL - CW-14D Conduit Incorporated or 1014 ft. No N/A None No Conduit Structure Intake Penetration Power Exterior Penetration Structure, from Cable Tray Passive (IEP)

Power from Intake Cell to Motor Cable Tray Space to Motor

U.S. Nuclear Regulatory Commission LIC-13-0102 Page 2 Item Feature ID/ Description Bldg./Area CLB Room Other Feature/Barrier CLB Deficiency Deficiency Actions Inaccessible?

Procedure Feature Description Type Flood (yes/no) Description Taken or (yes/no, if No. Elevation (if any) El. At Planned yes, explain Feature below) 5 IS-E-11 CW-14C IS- Intake 1004'-6" IS - Intake CW-14C Conduit Incorporated or 1014 ft. No N/A None No Conduit Structure Structure Penetration from Exterior Penetration Control Station to Passive (IEP) from Control Motor Station to Motor 6 IS-E-12 CW-14C IS- Intake 1004'-6" IS-CELL - CW-14C Conduit Incorporated or 1014 ft. No N/A None No Conduit Structure Intake Penetration Power Exterior Penetration Structure, from Cable Tray Passive (IEP)

Power from Intake Cell to Motor Cable Tray Space to Motor 7 IS-E-13 CW-14B IS- Intake 1004'-6" IS - Intake CW-14B Conduit Incorporated or 1014 ft. No N/A None No Conduit Structure Structure Penetration from Exterior Penetration Control Station to Passive (IEP) from Control Motor Station to Motor 8 IS-E-14 CW-14B IS- Intake 1004'-6" IS-CELL - CW-14B Conduit Incorporated or 1014 ft. No N/A None No Conduit Structure Intake Penetration Power Exterior Penetration Structure, from Cable Tray Passive (IEP)

Power from Intake Cell to Motor Cable Tray Space to Motor 9 IS-E-15 CW-14A IS- Intake 1004'-6" IS - Intake CW-14A Conduit Incorporated or 1014 ft. No N/A None No Conduit Structure Structure Penetration from Exterior Penetration Control Station to Passive (IEP) from Control Motor Station to Motor

U.S. Nuclear Regulatory Commission LIC-13-0102 Page 3 Item Feature ID/ Description Bldg./Area CLB Room Other Feature/Barrier CLB Deficiency Deficiency Actions Inaccessible?

Procedure Feature Description Type Flood (yes/no) Description Taken or (yes/no, if No. Elevation (if any) El. At Planned yes, explain Feature below) 10 IS-E-16 CW-14A IS- Intake 1004'-6" IS-CELL - CW-14A Conduit Incorporated or 1014 ft. No N/A None No Conduit Structure Intake Penetration Power Exterior Penetration Structure, from Cable Tray Passive (IEP)

Power from Intake Cell to Motor Cable Tray Space to Motor 11 IS-E-17 Compressed IS- Intake 1004' 0" IS - Intake Compressed Air Incorporated or 1014 ft. No N/A None No Air to Structure Structure to Veranda Exterior Veranda Penetration Passive (IEP)

Penetration 12 IS-E-21 Surface IS- Intake 988'-6" IS-CELL - Surface Sluice Incorporated or 1014 ft. No N/A None No Sluice Structure Intake Penetration Exterior Penetration Structure, Passive (IEP)

Intake Cell Space 13 IS-E-23 "F" Cell Grid IS- Intake 998'-10" IS-CELL - "F" Cell Grid Incorporated or 1014 ft. No N/A None No Backwash Structure Intake Backwash Exterior Penetration Structure, Penetration Passive (IEP)

Intake Cell Space 14 IS-E-24 "E" Cell Grid IS- Intake 998'-10" IS-CELL - "E" Cell Grid Incorporated or 1014 ft. No N/A None No Backwash Structure Intake Backwash Exterior Penetration Structure, Penetration Passive (IEP)

Intake Cell Space 15 IS-E-25 "D" Cell Grid IS- Intake 998'-10" IS-CELL - "D" Cell Grid Incorporated or 1014 ft. No N/A None No Backwash Structure Intake Backwash Exterior Penetration Structure, Penetration Passive (IEP)

Intake Cell Space

U.S. Nuclear Regulatory Commission LIC-13-0102 Page 4 Item Feature ID/ Description Bldg./Area CLB Room Other Feature/Barrier CLB Deficiency Deficiency Actions Inaccessible?

Procedure Feature Description Type Flood (yes/no) Description Taken or (yes/no, if No. Elevation (if any) El. At Planned yes, explain Feature below) 16 IS-E-26 "C" Cell Grid IS- Intake 998'-10" IS-CELL - "C" Cell Grid Incorporated or 1014 ft. No N/A None No Backwash Structure Intake Backwash Exterior Penetration Structure, Penetration Passive (IEP)

Intake Cell Space 17 IS-E-27 "B" Cell Grid IS- Intake 998'-10" IS-CELL - "B" Cell Grid Incorporated or 1014 ft. No N/A None No Backwash Structure Intake Backwash Exterior Penetration Structure, Penetration Passive (IEP)

Intake Cell Space 18 IS-E-28 "A" Cell Grid IS- Intake 998'-10" IS-CELL - "A" Cell Grid Incorporated or 1014 ft. No N/A None No Backwash Structure Intake Backwash Exterior Penetration Structure, Penetration Passive (IEP)

Intake Cell Space 19 IS-N-08 Security IS- Intake 1008'-1" IS - Intake Security System Incorporated or 1014 ft. No N/A None No System Structure Structure Conduit Exterior Conduit Penetration Passive (IEP)

Penetration 20 IS-N-09 Security IS- Intake 1008'-1" IS - Intake Security System Incorporated or 1014 ft. No N/A None No System Structure Structure Conduit Exterior Conduit Penetration Passive (IEP)

Penetration 21 IS-N-10 Security IS- Intake 1007'-5" IS - Intake Security System Incorporated or 1014 ft. No N/A None No System Structure Structure Conduit Exterior Conduit Penetration Passive (IEP)

Penetration

U.S. Nuclear Regulatory Commission LIC-13-0102 Page 5 Item Feature ID/ Description Bldg./Area CLB Room Other Feature/Barrier CLB Deficiency Deficiency Actions Inaccessible?

Procedure Feature Description Type Flood (yes/no) Description Taken or (yes/no, if No. Elevation (if any) El. At Planned yes, explain Feature below) 22 IS-N-11 Security IS- Intake 1007'-5" IS - Intake Security System Incorporated or 1014 ft. No N/A None No System Structure Structure Conduit Exterior Conduit Penetration Passive (IEP)

Penetration 23 MH31-E-03 MH-31 Yard 1002'-7" MH Man MH-31 Conduit, Incorporated or 1014 ft. No N/A None No Conduit, Hole 31 1900 series Exterior 1900 series instrument conduit Passive (IEP) instrument conduit 24 MH31-E-04 MH-31 Yard 1002'-7" MH Man MH-31 Conduit Incorporated or 1014 ft. No N/A None No Conduit Hole 31 Exterior Passive (IEP) 25 MH31-E-05 MH-31 Yard 996'-7" MH Man MH-31 Conduit Incorporated or 1014 ft. No N/A None No Conduit Hole 31 Exterior Passive (IEP) 26 MH31-E-06 MH-31 Yard 997'-7" MH Man MH-31 Conduit Incorporated or 1014 ft. No N/A None No Conduit Hole 31 Exterior Passive (IEP) 27 MH31-E-07 MH-31 Yard 998'-7" MH Man MH-31 Conduit Incorporated or 1014 ft. No N/A None No Conduit Hole 31 Exterior Passive (IEP) 28 MH31-E-08 MH-31 Yard 1002'-7" MH Man MH-31 Conduit Incorporated or 1014 ft. No N/A None No Conduit Hole 31 Exterior Passive (IEP) 29 MH31-E-09 MH-31 Yard 997'-7" MH Man MH-31 Conduit Incorporated or 1014 ft. No N/A None No Conduit Hole 31 Exterior Passive (IEP)

U.S. Nuclear Regulatory Commission LIC-13-0102 Page 6 Item Feature ID/ Description Bldg./Area CLB Room Other Feature/Barrier CLB Deficiency Deficiency Actions Inaccessible?

Procedure Feature Description Type Flood (yes/no) Description Taken or (yes/no, if No. Elevation (if any) El. At Planned yes, explain Feature below) 30 MH31-E-10 MH-31 Yard 1001'-7" MH Man MH-31 Conduit Incorporated or 1014 ft. No N/A None No Conduit Hole 31 Exterior Passive (IEP) 31 MH31-E-11 MH-31 Yard 998'-7" MH Man MH-31 Conduit Incorporated or 1014 ft. No N/A None No Conduit Hole 31 Exterior Passive (IEP) 32 MH31-E-12 MH-31 Yard 998'-7" MH Man MH-31 Conduit Incorporated or 1014 ft. No N/A None No Conduit Hole 31 Exterior Passive (IEP) 33 MH31-E-13 MH-31 Yard 995'-7" MH Man MH-31 Conduit Incorporated or 1014 ft. No N/A None No Conduit Hole 31 Exterior Passive (IEP) 34 MH31-E-14 MH-31 Yard 995'-7" MH Man MH-31 Conduit Incorporated or 1014 ft. No N/A None No Conduit Hole 31 Exterior Passive (IEP) 35 MH31-E-15 MH-31 Yard 1001'-7" MH Man MH-31 Conduit Incorporated or 1014 ft. No N/A None No Conduit Hole 31 Exterior Passive (IEP) 36 MH31-E-16 MH-31 Yard 1001'-7" MH Man MH-31 Conduit Incorporated or 1014 ft. No N/A None No Conduit Hole 31 Exterior Passive (IEP) 37 MH31-E-17 MH-31 Yard 1002'-7" MH Man MH-31 Conduit Incorporated or 1014 ft. No N/A None No Conduit Hole 31 Exterior Passive (IEP) 38 MH31-E-18 MH-31 Yard 995'-7" MH Man MH-31 Conduit Incorporated or 1014 ft. No N/A None No Conduit Hole 31 Exterior Passive (IEP)

U.S. Nuclear Regulatory Commission LIC-13-0102 Page 7 Item Feature ID/ Description Bldg./Area CLB Room Other Feature/Barrier CLB Deficiency Deficiency Actions Inaccessible?

Procedure Feature Description Type Flood (yes/no) Description Taken or (yes/no, if No. Elevation (if any) El. At Planned yes, explain Feature below) 39 MH31-E-19 MH-31 Yard 997'-7" MH Man MH-31 Conduit Incorporated or 1014 ft. No N/A None No Conduit Hole 31 Exterior Passive (IEP) 40 MH31-E-20 MH-31 Yard 996'-7" MH Man MH-31 Conduit Incorporated or 1014 ft. No N/A None No Conduit Hole 31 Exterior Passive (IEP) 41 MH31-E-21 MH-31 Yard 1002'-7" MH Man MH-31 Conduit Incorporated or 1014 ft. No N/A None No Conduit Hole 31 Exterior Passive (IEP) 42 MH31-E-22 MH-31 Yard 1002'-7" MH Man MH-31 Conduit Incorporated or 1014 ft. No N/A None No Conduit Hole 31 Exterior Passive (IEP) 43 MH31-E-25 MH-31 Yard 998'-7" MH Man MH-31 Conduit Incorporated or 1014 ft. No N/A None No Conduit Hole 31 Exterior Passive (IEP) 44 MH31-E-26 MH-31 Yard 998'-7" MH Man MH-31 Conduit Incorporated or 1014 ft. No N/A None No Conduit Hole 31 Exterior Passive (IEP) 45 MH31-E-27 MH-31 Yard 1001'-7" MH Man MH-31 Conduit Incorporated or 1014 ft. No N/A None No Conduit Hole 31 Exterior Passive (IEP) 46 MH31-E-28 MH-31 Yard 997'-7" MH Man MH-31 Conduit Incorporated or 1014 ft. No N/A None No Conduit Hole 31 Exterior Passive (IEP) 47 MH31-E-29 MH-31 Yard 1002'-7" MH Man MH-31 Conduit Incorporated or 1014 ft. No N/A None No Conduit Hole 31 Exterior Passive (IEP)

U.S. Nuclear Regulatory Commission LIC-13-0102 Page 8 Item Feature ID/ Description Bldg./Area CLB Room Other Feature/Barrier CLB Deficiency Deficiency Actions Inaccessible?

Procedure Feature Description Type Flood (yes/no) Description Taken or (yes/no, if No. Elevation (if any) El. At Planned yes, explain Feature below) 48 MH31-E-30 MH-31 Yard 998'-7" MH Man MH-31 Conduit Incorporated or 1014 ft. No N/A None No Conduit Hole 31 Exterior Passive (IEP) 49 MH31-E-31 MH-31 Yard 997'-7" MH Man MH-31 Conduit Incorporated or 1014 ft. No N/A None No Conduit Hole 31 Exterior Passive (IEP) 50 MH31-E-32 MH-31 Yard 996'-7" MH Man MH-31 Conduit Incorporated or 1014 ft. No N/A None No Conduit Hole 31 Exterior Passive (IEP) 51 MH31-E-33 MH-31 Yard 996'-7" MH Man MH-31 Conduit Incorporated or 1014 ft. No N/A None No Conduit Hole 31 Exterior Passive (IEP) 52 MH31-E-34 MH-31 Yard 997'-7" MH Man MH-31 Conduit Incorporated or 1014 ft. No N/A None No Conduit Hole 31 Exterior Passive (IEP) 53 MH31-E-35 MH-31 Yard 996'-7" MH Man MH-31 Conduit Incorporated or 1014 ft. No N/A None No Conduit Hole 31 Exterior Passive (IEP) 54 MH31-E-36 MH-31 Yard 1002'-7" MH Man MH-31 Conduit Incorporated or 1014 ft. No N/A None No Conduit Hole 31 Exterior Passive (IEP) 55 MH31-E-37 MH-31 Yard 1001'-7" MH Man MH-31 Conduit Incorporated or 1014 ft. No N/A None No Conduit Hole 31 Exterior Passive (IEP) 56 MH31-E-38 MH-31 Yard 1001'-7" MH Man MH-31 Conduit Incorporated or 1014 ft. No N/A None No Conduit Hole 31 Exterior Passive (IEP)

U.S. Nuclear Regulatory Commission LIC-13-0102 Page 9 Item Feature ID/ Description Bldg./Area CLB Room Other Feature/Barrier CLB Deficiency Deficiency Actions Inaccessible?

Procedure Feature Description Type Flood (yes/no) Description Taken or (yes/no, if No. Elevation (if any) El. At Planned yes, explain Feature below) 57 MH31-E-39 MH-31 Yard 995'-7" MH Man MH-31 Conduit Incorporated or 1014 ft. No N/A None No Conduit Hole 31 Exterior Passive (IEP) 58 MH31-E-40 MH-31 Yard 995'-7" MH Man MH-31 Conduit Incorporated or 1014 ft. No N/A None No Conduit Hole 31 Exterior Passive (IEP) 59 MH31-N-01 Conduit Yard 1000'-0" MH Man Conduit Incorporated or 1014 ft. No N/A None No Penetration Hole 31 Penetration for Exterior for RW RW strainer Passive (IEP) strainer power power 60 MH31-N-02 Conduit Yard 1000'-0" MH Man Conduit Incorporated or 1014 ft. No N/A None No Penetration Hole 31 Penetration for Exterior for RW RW strainer Passive (IEP) strainer power power 61 Room 06 Walls and Aux Bldg 989'-8" Room 6 Incorporated or 1014 ft. No N/A None No Walls/Floors Floors Exterior Passive (IEP) 62 Room 07 Walls and Aux Bldg 989'-8" Room 7 Incorporated or 1014 ft. No N/A None No Walls/Floors Floors Exterior Passive (IEP) 63 Room 09 Walls and Aux Bldg 989'-8" Room 9 Incorporated or 1014 ft. No N/A None No Walls/Floors Floors Exterior Passive (IEP)

U.S. Nuclear Regulatory Commission LIC-13-0102 Page 10 Item Feature ID/ Description Bldg./Area CLB Room Other Feature/Barrier CLB Deficiency Deficiency Actions Inaccessible?

Procedure Feature Description Type Flood (yes/no) Description Taken or (yes/no, if No. Elevation (if any) El. At Planned yes, explain Feature below) 64 Room 16 Walls and Aux Bldg 989'-8" Room 16 Incorporated or 1014 ft. No N/A None No Walls/Floors Floors Exterior Passive (IEP)