RESULATO INFORMATION OISTPISUTION +STEM (RIOR)
ACCESSION NBR:8307210146 DOC ~ DATE: 8%/07/18 NOTARIZED; NO DOCKET FACIL:50-400 Shear on Har ri s Nuc1 ear Power P'I ant F Uni t 1F Carol ina Carolina 05000400 50-401 Shearon Harris Nuclear Power BYNAME Planti Unit 2F 05000401 AUTH AUTHOR AFFILIATION MCOUFFIEgMSA ~ 'Carolina IPower 8 Light Co, REiCIP.NAME RECIPIENT AFFILIATION DENTON,HER, Office of Nuclear Reactor Regulationi Director S UBJECT: Forwards responses to draft 'SER Open Items 172 L 173,Resumes of personnel to control manager fill 8
positions of environ 8 radiation radiation control supervisor will be added to FSAR when positions filled, DISTRIBUTION CODE ~ B001S TITLE: Licensing Submittal:
>COPIES 'RECEIVED eLTR PSAR/FSAR Amdts 8, ENCL j SIZE ~,
Related Correspondence NOTES!
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL NRR/DL/ADL 1 0 NRR LB3 BC 1 0 NRR LB3 LA 1 0 KADAMBI,P 01 1
'INTERNAI: ELO/HDSi 1 0 IE FILE 1 1 IE/DEPER/EPB 36 3 '3 IE/DEPER/IRB 35 1 1 IE/OEQA/QAB 21 NRR/DE/AEAB 1 0 NRR/OE/CEB NRR/DF/EQB ii 13 1
1 2
1 1
2 NRR/DE/EHEB NRR/DE/GB 28 2 2 NRR/DE/MEB 18 1 1 NRR/DE/MTEB 17 1 1 NRR/DE/SAB 24 1 1 NRR/OE/SGEB 25 1 1 NRR/DHFS/HFEB40 1 1 NRR/DHFS/LQB 32 1 1 NRR/DHFS/PSRB 1 1 NRR/DL/SSPB 1 0 NRR/DS I/AEB 26 i 1 NRR/DS I/ASB 1 1 NRR/OS I/CPB 10 1 1 NRR/DS I/CSB 09 1 1 NRR/DSI/ICSB 16 1 NRR/DSI/METH 12 1 1 NRR/OS I/PS B 19 1 1 B 22 1 1 NRR/DS I/RSB 23 1 1 REG F ILE 04 1 1 RGN2 3 3 /MIB 1 0 EXTERNAL~ ACRS 41 6 6 BNL(AMDTS ONLY) 1 OMB/DSS (AMDTS) 1 1 FEMA-REP DI V 39 1 LPDR 03 1 1 NRC PDR 02 1 NSIC 05 1 NTIS 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 53 ENCL 46
l II
~ ~ l a 1D P
U U
v i
V
CÃQP, Carolina Power & Light Company JUL 18 1983 Serial LAP-83-138 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS ~ 1 AND 2 DOCKET NOS. 50-400 AND 50-401 DRAFT SAFETY EVALUATION REPORT RESPONSES RADIOLOGICAL ASSESSMENT BRANCH
Dear Mr. Denton:
Carolina Power & Light Company (CP&L) hereby transmits one original and forty copies of the responses to the Shearon Harris Nuclear Power Plant Draft Safety Evaluation Report (DSER) CP&L Open Item Nos. 172 and 173.
Carolina Power & Light Company will be providing responses to other Open Items in the DSER shortly.
Yours very truly, M. A. McDuffie Senior Vice President Engineering &"Construction P S/ce (6735PSA)
Attachment cct Mr. Seymour Block (NRQ-RAB) Mr. Wells Eddleman Mr. N. Prasad Kadambi (NRC) Dr. Phyllis Iotchin Mr. G. F. Maxwell (NRO-SHNPP) Mr. John D. Runkle Mr. J. P. O'Reilly (NRC-RII) Dr. Richard D. Wilson Mr. Travis Payne (KUDZU) Mr. G. 0. Bright (ASLB)
Mr. Daniel F. Read (CHANGE/ELP) Dr. J. H. Carpenter (ASLB)
Chapel Hill Public Library Mr. J. L. Kelley (ASLB)
Wake County. Public Library
'307210146 830718 PDR ADOCK 05000400 E PDR 411 Fayetteville Street ~ P. O. Box 1551 e Raleigh, N. C. 27602
I
(;Oaf ~ ~
J<).
ti f O<ql
Shearon Harris Nuclear Power Plant (SHNPP)
Draft Safety Evaluation Report (DSER)
Radiological Assessment Branch 0 en Item 172 (DSER Section 1 2.5.1 Pa e 12-13)
The Environmental and Radiation Control Manager will implement and enforce the SHNPP radiation protection support program. This will be done through the Radiation Control Supervisor. However, the ultimate responsibility for.
meeting the ALARA objectives of the radiation protection program lies with,the Plant General Manager. Personnel to fill the positions of the Environmental and Radiation Control Manager and the Radiation Control Supervisor have not yet been selected at SHNPP; thus, resumes are not available for. review to ensure that the person filling either of those staff positions has the Radiation Protection Manager qualifications specified in RG 1.8. Therefore, this is an open item.
~Res oese Resumes are unavailable for the Environmental and Radiation Control Manager and the Radiation Control Supervisor at this time. The qualifications of each applicant are reviewed against the criteria of Regulatory Guide 1.8 to ensure background standards are met. When these positions are filled, resumes will be added to Final Safety Analysis Report Section 13.1.3. 2. Carolina Power 6 Light Company considers this to be a confirmatory item.
Shearon Harris Nuclear Power Plant (SHNPP)
Draft Safety Evaluation Report (DSER)
Radiological Assessment Branch 0 en Item 173 (DSER Section 12.5.1, a e 12-13)
~UESTION:
The Harris plant organization chart shows the Environmental and Radiation Control Manager reporting to the Manager, Plant Operations. It is the staff's position that in matters relating to radiological health and safety, the individual responsible for the radiation protection support group's activities has direct responsibility to both employees and management. This responsibility can best be fulfilled if the Environmental and Radiation Control Manager not only has access to the General Plant Manager, but also is independent of the plant operations management, whose prime responsibility is continuity or improvement of station operability.
This apparent lack of independence is also an open item.
~Res onse When the first CP&L nuclear plant began operation, the plant organization consisted of a Plant Superintendent with an Operating Supervisor, Maintenance Supervisor, and an Engineering Supervisor reporting to him. As the individual roles of operations, maintenance, and engineering personnel became more complex and demanding, additional personnel were added to the plant staffs.
As the plant staff evolved, so, too, did the management structure in order to maintain control of the many staff activities. In addition to the changes in management structure, the management positions have gradually been upgraded to provide the necessary authority and responsibility required to perform the respective management functions. The position of Plant General Manager has replaced the previous position of Plant Superintendent. The positions of Manager Maintenance, Manager Operations, and Manager Technical Services have replaced the previous positions of Maintenance Supervisor, Operating Supervisor, and Engineering Supervisor respectively.
With the increased emphasis CP&L has placed on ALARA, the position directly responsible for Radiation Protection and Control has been upgraded from a Foreman to the Manager Environmental & Radiation Control. While the Plant General Manager has ultimate responsibility for overall plant operations, a new position, Manager Plant Operations, was created to meet the managerial demands of day-to-day plant operations. This position has the same authority and responsibility for the safe operation of the plant as did the previous Plant Superintendent. The positions of Manager Environmental & Radiation Control, Manager Maintenance, and Manager Operations, report to the Manager Plant Operations. The objective of having these three disciplines work as an integral unit is to develop a close coordination of operations and maintenance activities with a constant emphasis on the Health Physics and ALARA programs. This objective has been realized with great success.
As indicated in the draft Technical Specifications, Section 6, Figure 6.2.1-1, Offsite Organization (attached), the Manager Environmental &
Radiation Control has direct and open lines of communication with the Plant General Manager, Manager Corporate Health Physics, and the Manager Radiological & Chemical Support for matters regarding the radiological health and safety of employees and the public. The Manager Environmental &
Radiation Control is chaxged with the responsibility and is encouraged to use these lines of communications to ensure the company policy for Health Physics and ALARA are implemented.
Carolina Power & Light Company feels that the curxent oxganization meets the intent of NRC's guidance, since the Manager E&RC does not report to the Manager Operations or Manager Maintenance but reports to the next level of management, the Manager Plant Operations. This organization includes the additional check and balance of encouraging the Manager E&RC to communicate directly to the Plant General Manager and Coxporate Managers in Health Physics matters and unresolved concexns.
(7251DCWccc)
t I
CHAIRMANIPRESIDEHT AND CHIEF EXECUTIVE OFFICER EXECUTIVE VICE PRESIDENT POWER SUI'PLY AND ENOIIIEERUIO S CONSTRUCTION VICE PRESIDEtl T MANAOER SENIOR VICE PRESIDENT CORPORATE NUCLEAR SAFETY POWER SUPPLY AND RESEARCH QUALITY ASSURANCE ANAOER CORPORATE
. HEALTH PHYSICS MANAOER VICE PRESIDENT CNSS NUCLEAR OPERATIONS MANAOER TECHNICAL SERVICES MANAOER PRINCIPAL RADIOLOOICAL MANAOER MANAOER OPERATIONS OA SPECIALIST S CHEMICAL NUCt.EAR PERFORMANCE SU~PORT TRAltlINO OA/OC EVALUATION UNIT CORPORATE OFFICE SITE I
I I DIRECTOR I PLANT OHSITE I tlUCLEAR SAFETY OENERAL MANAOER I I MAtlAOER DIRECTOR MAtlAOER TECHNICAL PLANNItlO S OAIOC Ptlac SUPPORT SCII CD ULTN0 HARRIS SITE LEGEND LINES OF COMMUNICATION ADMINISTRATIVEOROANIZATION ASSIS'TANT M AtlA GER TO PLANT PLANT MANAOER OPERATIONS MANAGER EtlVIROMEtlTAL AtlD RADIATION CONTROL FIGURE 6.2.1-1
~