|
---|
Category:Letter type:L
MONTHYEARL-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis L-2024-137, Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, “Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent .2024-08-12012 August 2024 Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, “Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent . L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2024-131, Response to Request for Additional Information Regarding License Amendment Request 300, Modify Containment Average Air Temperature Requirements2024-08-0909 August 2024 Response to Request for Additional Information Regarding License Amendment Request 300, Modify Containment Average Air Temperature Requirements L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval L-2024-127, Supplement to Letter L-2024-108, “Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent2024-08-0505 August 2024 Supplement to Letter L-2024-108, “Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-113, License Amendment Request 294, Application to Revise Technical Specifications to Adopt TSTF- 577, Revised Frequencies for Steam Generator Tube Inspections2024-07-24024 July 2024 License Amendment Request 294, Application to Revise Technical Specifications to Adopt TSTF- 577, Revised Frequencies for Steam Generator Tube Inspections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite.2024-07-16016 July 2024 Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite. L-2024-116, Preparation and Scheduling of Operator Licensing Examinations2024-07-11011 July 2024 Preparation and Scheduling of Operator Licensing Examinations L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review L-2024-105, License Amendment Request 300, Modify Containment Average Air Temperature Requirements2024-06-26026 June 2024 License Amendment Request 300, Modify Containment Average Air Temperature Requirements L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-107, Schedule for Subsequent License Renewal Environmental Review2024-06-25025 June 2024 Schedule for Subsequent License Renewal Environmental Review L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project L-2024-098, Preparation and Scheduling of Operator Licensing Examinations2024-06-12012 June 2024 Preparation and Scheduling of Operator Licensing Examinations L-2024-093, Steam Generator Divider Plate Assemblies Bounding Analysis Evaluation for Aging Management Commitment 14 Revision2024-06-10010 June 2024 Steam Generator Divider Plate Assemblies Bounding Analysis Evaluation for Aging Management Commitment 14 Revision L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports L-2024-084, Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-05-30030 May 2024 Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut2024-05-10010 May 2024 NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distributio L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report L-2024-078, 2023 Annual Radioactive Effluent Release Report2024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report L-2024-077, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report L-2024-067, Annual Monitoring Report2024-04-26026 April 2024 Annual Monitoring Report L-2024-069, Radiological Emergency Plan Revision 762024-04-22022 April 2024 Radiological Emergency Plan Revision 76 L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-022024-04-17017 April 2024 Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 L-2024-064, Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report2024-04-17017 April 2024 Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report L-2024-056, Annual Radiological Environmental Operating Report for Calendar Year 20232024-04-17017 April 2024 Annual Radiological Environmental Operating Report for Calendar Year 2023 L-2024-054, 2023 Annual Environmental Operating Report2024-04-0909 April 2024 2023 Annual Environmental Operating Report L-2024-047, Proposed Use of a Subsequent ASME Code Edition and Addenda2024-03-28028 March 2024 Proposed Use of a Subsequent ASME Code Edition and Addenda L-2024-013, Submittal of Periodic Reports2024-03-28028 March 2024 Submittal of Periodic Reports L-2024-040, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-03-28028 March 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-030, Supplement to Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements2024-03-27027 March 2024 Supplement to Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements 2024-08-09
[Table view] |
Text
APR 2 52019 L-2019-093 10 CFR 50.4 Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Re: Florida Power & Light Company St. Lucie Units 1 and 2, Docket Nos. 50-335, 50-389 Florida Power & Light Company Turkey Point Units 3 and 4, Docket Nos. 50-250, 50-251 Florida Power & Light Company Proposed Turkey Point Units 6 and 7, Docket Nos.52-040, 52-041 N extEra Energy Seabrook, LLC Seabrook Station, Docket No. 50-443 N extEra Energy Duane Arnold, LLC Duane Arnold Energy Center, Docket No. 50-331 NextEra Energy Point Beach, LLC Point Beach Units 1 and 2, Docket Nos. 50-266, 50-301 Official Service List Update The purpose of this letter is to request an update to the official service list (NRR and Region) for Florida Power
& Light Company, the licensee for the St. Lucie Nuclear Plant, Units 1 and 2, the Turkey Point Nuclear Plant, Units 3 and 4, and proposed Units 6 and 7, and on behalf ofNextEra Energy Seabrook, LLC (NextEra Energy Seabrook), the licensee for Seabrook Station; NextEra Energy Duane Arnold, LLC (NextEra Energy Duane Arnold), the licensee for Duane Arnold Energy Center; and NextEra Energy Point Beach, LLC (NextEra Energy Point Beach), the licensee for Point Beach Nuclear Plant, Units 1 and 2 (collectively referred to as NextEra Energy).
Please.ensure Mr. Mano Nazar, Pr~sident and Chief Nuclear Officer, Nuclear Division, is the main addressee for NRC communications, with a carbon copy to the site specific, Site Director.
Effective immediately, please make the following changes:
CHANGE FROM CHANGE TO Chris Domingos Eric McCartney Site Director Site Director Seabrook Station Seabrook Station N extEra Energy Seabrook, LLC N extEra Energy Seabrook, LLC 626 Lafayette Road 626 Lafayette Road Seabrook, NH 0387 4 Seabrook, NH 03874 Christopher.Domingos@fpl.com Eric.McCartne}':@ful.com Electronic Mail Distribution Electronic Mail Distribution Florida Power & Light Company 700 Universe Boulevard, Juno Beach, FL 33408
L-2019-093 Enclosure Page 1 of 1 N extEra Energy Service List Primary Addressee for SGI and Official Use Only-Security-Related Information
~eileric:and Site Specific Safeguards Information - Site Specific Turkey Point St. Lucie Turkey Point Units 6 and 7 Seabrook Duane Arnold Point Beach Jupiter West Units 1 and 2 Units 3 and 4 (New Nuclear Station Energy Center Units 1 and 2 Projects)
Andrew Brady Orlando Hernandez Sean Fletcher Andrew Brady Bruce Fielding John Schwertfeger Mark Wilcox Nuclear Fleet Security Security Manager Security Manager Nuclear Fleet Security Security Manager Security Supervisor Security Manager Florida Power & Light Florida Power & Light Florida Power & Light Florida Power & Light NextEra Energy N extEra Energy NextEra Energy Company Company Company Company Seabrook, LLC Duane Arnold, LLC Point Beach, LLC Mail Stop: NT3/JW 6501 S. Ocean Drive 9760 SW 344 Street Mail Stop: NT3/JW 626 Lafayette Road 3277 DAEC Road 6610 Nuclear Road 15430 Endeavor Drive Jensen Beach, FL 34957 Florida City, FL 33034 15430 Endeavor Drive Seabrook, NH 03874 Palo, IA 52324 Two Rivers, WI 54241 Jupiter, FL 33478 Jupiter, FL 33478 Carbon Copy Recipient for SGI Without SGI Included and Official Use Only-Security-Related Information
- : ~-.. -*!c and She Specific Carbon Copy Received without SGI - Site Specific Turkey Point St. Lucie Turkey Point Units 6 and 7 Seabrook Duane Arnold Point Beach Juno Beach Units 1 and 2 Units 3 and 4 (New Nuclear Station Energy Center Units 1 and 2 Projects)
DanDeBoer Brian Stamp William Maher Eric McCartney Dean Curtland Robert Craven Site Director Site Director Director of Licensing Site Director Site Director Site Director Florida Power & Light Florida Power & Light Project - Nuclear NextEra Energy N extEra Energy N extEra Energy Company Company Florida Power & Light Seabrook, LLC Duane Arnold, LLC Point Beach, LLC Mano Nazar 6501 S. Ocean Drive 9760 SW 344 Street Company 626 Lafayette Road 3277 DAEC Road 6610 Nuclear Road President, Nuclear Division and Jensen Beach, FL 34957 Florida City, FL 33034 Mail Stop: JOE/JB Seabrook, NH 03874 Palo, IA 52324 Two Rivers, WI 54241 Chief Nuclear Officer Daniel.DeBoer@fpl.com Brian.Stamp@fpl.com 700 Universe Blvd. Eric.McCartney@ful.com Dean.Curtland@fpl.com Robert.Craven@fpl.com Florida Pow~r & Light Company Juno Beach, FL 33408 Mail Stop: EX/JB William.Maher@fpl.com Michael Snyder Robert Hess Kenneth Browne Michael Davis Eric Schultz 700 Universe Blvd.
Licensing Manager Licensing Manager --- and --- Licensing Manager Licensing Manager Licensing Manager Juno Beach, FL 33408 Steve Franzone Florida Power & Light Florida Power & Light N extEra Energy NextEra Energy NextEra Energy Mano.Nazar@fpl.com Company Company Licensing Manager Seabrook, LLC Duane Arnold, LLC Point Beach, LLC 6501 S. Ocean Drive 9760 SW 344 Street Florida Power & Light 626 Lafayette Road 3277 DAEC Road 6610 Nuclear Road Jensen Beach, FL 34957 Florida City, FL 33034 Company Seabrook, NH 03874 Palo, IA 52324 Two Rivers, WI 54241 Mike.Snider@fpl.com Robert.Hess@fpl.com Mail Stop: JOE/JB Kenneth.Browne@fpl.com J.Michael.Davis@fpl.com Eric.Schultz@fpl.com 700 Universe Blvd.
Juno Beach, FL 33408 Steve.Franzone@fpl.com
L-2019-093 Page 2 of2 CHANGE FROM CHANGE TO Robert Coffey Robert Craven Site Vice President Site Director Point Beach Nuclear Plant Point Beach Nuclear Plant NextEra Energy Point Beach, LLC NextEra Energy Point Beach, LLC 6610 Nuclear Road 6610 Nuclear Road Two Rivers, WI 54241 Two Rivers, WI 54241 Robert.Coffey@fpl.com Robert.Craven@ful.com Electronic Mail Distribution Electronic Mail Distribution Thomas Summers Robert Coffey Vice President, Corporate Support Vice President, Corporate Support N extEra Energy, Inc. N extEra Energy, Inc.
15430 Endeavor Drive 15430 Endeavor Drive Jupiter, FL 33478 Jupiter, FL 33478 Thomas.Summers@fpl.com Robert.Coffey@ful.com Electronic Mail Distribution Electronic Mail Distribution In addition, a revised listing ofNextEra Energy's "SGI and Official Use Only- Security-Related Information" and "Carbon Copy Recipient for SGI Without SGI Included and Official Use Only-Security-Related Information," is enclosed updating the above mentioned changes. Please continue to ensure that all Safeguards Information (including Safeguards Advisories) are issued in keeping with the specified enclosed distribution list.
Should you have any questions regarding this request, please contact Alison Brown at (561) 304-6243.
Very truly yours, William L. Parks Nuclear Licensing and Regulatory Compliance Director Enclosure (1)