Monthly Operating Rept for Mar 1974
ML19317E619
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 04/10/1974
From:
DUKE POWER CO.
To:
Shared Package
ML19317E613 List:
References
NUDOCS 7912180814
Download: ML19317E619 (2)


Text

'

UNIT Oconce Un.'

DATE April 10. 1974 9 0PERATING STATUS ,

6

1. RZPORTING PERIOD: March 1 TO March 31. 1974 GROSS I!OURS IN REPORTING PERIOD: 744
2. CURRENTLY AUTHORIZED POWER LEVEL Pfde 2568 lide-NET 2
3. None

, POWER LEVEL TO WilICll RESTRICTED (IF ANY):

4. REASONS FOR RESTRICTIONS (IF ANY):

Oconee Unit 2 is currently in power escalation testing and is not commercially operable. Items 10-13 are not applicable.

- THIS CUMULATIVE MONTH YK-TO-DATE TO DATE

5. Il0URS REACTOR WAS CRITICAL 0 85.6 743.0
6. Il0URS GENERATOR ON-LINE O 64.0 577.2
7. 0 104099 709271 GROSS THER!!AL POWER GENERATED (MWH)
8. GROSS ELECTRICAL POWER GENERATED (MWilj' 0 33000 209310
9. NET ELECTRI \L POWER CENERATED (MWH) -2165 21447 173734
10. REACTOR AVAILABILITY FACTOR (1)
11. PLANT AVAILABILITY FACTOR (2)
12. PLANT CAPACITY FACTOR (3)
13. FORCED OUTAGE RATE (4)
14. SHUTI;0WNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE AND

, DURATION OF EACH):

, 15. IF SilUTDOWN AT END OF REPORT PERIOD, ESTI!!ATED DATE OF STARTUP:

16. PLANTS IN TEST STATUS (PRIOR TO C0121ERCIAL OPERATION) REPORT THE FOLLOWINC:

DATE LAST DATE REASON FOR FORECAST ACllIEVED DIFFERENCE INITIAL CRITICALITY 11/11/73 INITIAL ELECTRICAL 12/5/73 _

POWER GENERATION IDIERCIAL OPERATION 5/15/74 (1) REACTOR AVAILABILITY FACTOR = 110URS REACTOR WAS CRITTCAL *100 GROSS Il0URS IN REPORTING FERIOD (2) PLANT AVAILABILITY FACTOR = _ HOURS CENERATOR ON-LINE *100 GROSS !!OURS IN REPoliTIT.G PERIOD (3) PLANT CAPACITY FACTOR = NET ELECTRICAL POWER GENERATED _ , , ,

CURRENTLY LICEN5ED l'0WLR LEVEL

  • GROSS 110URS IN REPORTING PERI
  • (4) FORCED OUTAGE RATE = FORCED OUTACE 110URS

~

  • 100 HOURS GENERATOR OU-LINE + FORCEDMT7d;1f110'URS ~

s _ ~~ , e.--.- - . . . . . _ .. 9.

s s .

N SLM:ARY In:IT NAE Odonee Unit 2 DATE April 10, 1974 4 FIFORT MONTH March, 1974 i

PLANT SHUTDOWNS TYPE MET *40D OF F-TORCED DUPATION SHUTTIND DOL'N NO. DATE S-SuiEDULED (110URS) FIASON (1) THE REACTOR (2) CO:MNTS .

3 740122 F 754' A B i

(1) REASON: (2) 1:ETHO3:

A-EQUIPMENT FAILURE (EXFLAIN) A- ?UO*UAL B-MAINT. OR TEST B- !:/.iUAL SCFRi C-REFUELING C .8UTO'1ATIC SCRAM D-REGULATORY RESTRICTION E-OPE:tATOR T:'AINING AND

' LICESSE ext';INATION F-ADi!!!:ISTRATIVE G-OPERATIONAL ERROR

- (EXPLAIN) i .