ML19317E619
| ML19317E619 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 04/10/1974 |
| From: | DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML19317E613 | List: |
| References | |
| NUDOCS 7912180814 | |
| Download: ML19317E619 (2) | |
Text
'
UNIT Oconce Un.'
DATE April 10. 1974 9 0PERATING STATUS ,
6
- 1. RZPORTING PERIOD: March 1 TO March 31. 1974 GROSS I!OURS IN REPORTING PERIOD: 744
- 2. CURRENTLY AUTHORIZED POWER LEVEL Pfde 2568 lide-NET 2
- 3. None
, POWER LEVEL TO WilICll RESTRICTED (IF ANY):
- 4. REASONS FOR RESTRICTIONS (IF ANY):
Oconee Unit 2 is currently in power escalation testing and is not commercially operable. Items 10-13 are not applicable.
- THIS CUMULATIVE MONTH YK-TO-DATE TO DATE
- 5. Il0URS REACTOR WAS CRITICAL 0 85.6 743.0
- 6. Il0URS GENERATOR ON-LINE O 64.0 577.2
- 7. 0 104099 709271 GROSS THER!!AL POWER GENERATED (MWH)
- 8. GROSS ELECTRICAL POWER GENERATED (MWilj' 0 33000 209310
- 9. NET ELECTRI \L POWER CENERATED (MWH) -2165 21447 173734
- 10. REACTOR AVAILABILITY FACTOR (1)
- 11. PLANT AVAILABILITY FACTOR (2)
- 12. PLANT CAPACITY FACTOR (3)
- 13. FORCED OUTAGE RATE (4)
- 14. SHUTI;0WNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE AND
, DURATION OF EACH):
, 15. IF SilUTDOWN AT END OF REPORT PERIOD, ESTI!!ATED DATE OF STARTUP:
- 16. PLANTS IN TEST STATUS (PRIOR TO C0121ERCIAL OPERATION) REPORT THE FOLLOWINC:
DATE LAST DATE REASON FOR FORECAST ACllIEVED DIFFERENCE INITIAL CRITICALITY 11/11/73 INITIAL ELECTRICAL 12/5/73 _
POWER GENERATION IDIERCIAL OPERATION 5/15/74 (1) REACTOR AVAILABILITY FACTOR = 110URS REACTOR WAS CRITTCAL *100 GROSS Il0URS IN REPORTING FERIOD (2) PLANT AVAILABILITY FACTOR = _ HOURS CENERATOR ON-LINE *100 GROSS !!OURS IN REPoliTIT.G PERIOD (3) PLANT CAPACITY FACTOR = NET ELECTRICAL POWER GENERATED _ , , ,
CURRENTLY LICEN5ED l'0WLR LEVEL
- GROSS 110URS IN REPORTING PERI
- (4) FORCED OUTAGE RATE = FORCED OUTACE 110URS
~
- 100 HOURS GENERATOR OU-LINE + FORCEDMT7d;1f110'URS ~
s _ ~~ , e.--.- - . . . . . _ .. 9.
s s .
N SLM:ARY In:IT NAE Odonee Unit 2 DATE April 10, 1974 4 FIFORT MONTH March, 1974 i
PLANT SHUTDOWNS TYPE MET *40D OF F-TORCED DUPATION SHUTTIND DOL'N NO. DATE S-SuiEDULED (110URS) FIASON (1) THE REACTOR (2) CO:MNTS .
3 740122 F 754' A B i
(1) REASON: (2) 1:ETHO3:
A-EQUIPMENT FAILURE (EXFLAIN) A- ?UO*UAL B-MAINT. OR TEST B- !:/.iUAL SCFRi C-REFUELING C .8UTO'1ATIC SCRAM D-REGULATORY RESTRICTION E-OPE:tATOR T:'AINING AND
' LICESSE ext';INATION F-ADi!!!:ISTRATIVE G-OPERATIONAL ERROR
- (EXPLAIN) i .
_